ABL POLEMH6 User manual

EN
Article No.: 0301697_EN_a
Installation manual
POLEMH6

| Contact
ii
Contact
ABL GmbH
Albert-Büttner-Straße 11
91207 Lauf an der Pegnitz
Germany
+49 (0) 9123 188-0
+49 (0) 9123 188-188
www.ablmobility.de
Customer Service
+49 (0) 9123 188-0
www.ablmobility.de/de/service/support/
Revision:0301697_EN_a,version:10/12/2021
T
h
i
n
k
b
e
f
o
r
e
y
o
u
p
r
i
n
t
NOTE
Please note that the wallboxes shown on the cover sheet are not included with the POLEMH6, but can be ordered
separately for a fee.

Contents | iii
Contents
Contact ii
Additional technical information iv
Intended use iv
Information in this document iv
Important information 5
General 5
Safety instructions 5
User information 6
Dimensional drawings and dimensions 8
POLEMH6 8
EMH9996 9
Introduction to the POLEMH6 11
Identification of the POLEMH6 11
Items supplied 11
Accessories 12
Installation 13
Requirements for the installation site 13
Specifications for the mechanical
installation of the POLEMH6 13
Laying the EMH9996 foundation 14
Installing the POLEMH6 on the EMH9996
foundation 16
Specifications for the mechanical and
electrical installation of the wallboxes 19
Installing the eMH3 Wallbox on the POLEMH6 20
Electrical connection of the POLEMH6 23
Note on the installation of a second
eMH3 Wallbox 25
Safety instructions for start-up and operation 26
Troubleshooting and maintenance 27
Maintenance 27
Appendix 28
Technical specifications 28
Protection classes & degrees of protection 28
Trademarks 29
Intellectual property & copyright 29
Disposal notice 29

| Additional technical information
iv
Additional technical information
Additional technical information is required to install an eMH3 Wallbox on the POLEMH6 mounting pole, as well as
regarding further accessories. It is contained in separate documents.
In addition, the technical data for your mounting pole and the accessories are collated in product-specific data
sheets. You can download these documents from the ABL website using the following link:
https://www.ablmobility.de/en/service/downloads.php
NOTE
Displaying the additional information on a computer, tablet or smartphone
Additional technical information is made available in the Portable Document Format (PDF).
To display PDF files, you need the free Adobe Acrobat Reader or comparable software.
You can find further information about our product range, as well as about separately available accessory compo-
nents on our website at www.ablmobility.de/en. Please visit:
https://www.ablmobility.de/en
Intended use
The POLEMH6 mounting pole is designed for the outdoor installation of one or two eMH3 Wallboxes. In order to en-
sure the necessary stability, the POLEMH6 can be installed on the optionally available EMH9996 concrete foundation
or on a self-constructed concrete foundation. To protect the installed wallbox from the weather, ABL offers the com-
patible WPR36 weather shield. For cable management at the charging point, the CABHOLD cable holder with charg-
ing plug receptacle can be installed on the POLEMH6 mounting pole.
Information in this document
This document describes the installation of the POLEMH6 on the EMH9996 foundation as well as the subsequent me-
chanical installation and electrical connection of an eMH3 Wallbox to the mounting pole: It is recommended that all
working steps described in this document are carried out by qualified specialist electrical contractors only.
User Specialist electrical contractor
Installation manual (this document)
Additional technical information
Data sheets
Installation instructions WPR12/36
Installation instructions CABHOLD

Important information – General | 5
Important information
General
This manual describes all working steps required to install and/or operate the product it concerns.
Certain sections of this manual are specially formatted for quick and easy reference.
Descriptions listing equally valid options are indicated by bullet points.
1 Descriptions listing operating steps are numbered in chronological order.
DANGER!
Indicates life-threatening electrical voltages
Sections marked with this symbol indicate electrical voltages that present a danger of loss of life or grievous
bodily injury.
Actions marked with this symbol must not be carried out under any circumstances.
WARNING!
Indicates important actions and further hazards
Sections marked with this symbol indicate further hazards that may result in damage to the product or to other
connected components.
Actions marked with this symbol must be carried out with special care.
NOTE
Indicates important information for operation or installation
Sections marked with this symbol indicate further important information and features necessary for successful
operation.
Actions marked with this symbol should be carried out as required.
Passages marked with this symbol contain valuable additional information.
Safety instructions
The safety notices serve to ensure the proper and safe installation, as well as subsequent safe operation of the
device.
DANGER!
Violation of the safety information
Disregard of or actions contrary to the safety information and instructions contained in this manual may lead to
electric shock, fire, severe injury and/or death.
Please pay attention to the following points:
Please read this manual carefully.
Heed all warnings and follow all instructions.
Only use accessories intended and sold for the product by ABL.
Do not install this device in close vicinity to running water, water jets or areas subject to flooding.
The product must not be installed in explosive atmosphere areas (EX areas).
Mechanical installation should be carried out by qualified specialist personnel.

| Important information – User information
6
Electrical installation and testing must be carried out with reference to local rules by a qualified specialist
electrical contractor, who, on the basis of their specialist training and experience, as well as their knowledge of
the relevant standards, is able to assess and carry out the working steps described in this manual and recognise
potential hazards.
WARNING!
Notification or approval requirement for charging stations
Please note that electrical grid operators, energy suppliers or national regulations may require notification of or
approval for the installation or operation of a charging station.
A Duty to Notify applies in Germany according to §19 NAV.
In case of installation faults, or malfunctions that can be traced back to faulty installation, always contact the
contractor who carried out the installation first.
The product must not be covered with other objects or materials.
No liquids or receptacles containing liquids must be placed on the product.
Please note that the POLEMH6 mounting pole must never be installed directly on asphalt! To ensure safe and
proper mechanical installation, the optionally available EMH9996 concrete foundation or a functionally equivalent
alternative must always be provided.
Do not under any circumstances make alterations to the product. Any disregard of this instruction represents a
safety risk, fundamentally breaches the guarantee provisions and may void the warranty with immediate effect.
Malfunctions affecting the safety of persons, connected electric devices or the device itself must be resolved by a
qualified specialist electrical contractor.
Should one of the following malfunctions occur, please contact the specialist electrical contractor who has carried
out the installation of your wallbox and accessories:
yThe product housing has been damaged mechanically, or the housing cover has been removed or can no longer
be closed.
ySufficient protection of the small distribution board against splashing water and/or foreign objects is no longer
provided.
yThe product does not function properly or has been otherwise damaged.
WARNING!
Observation of further safety instructions
Please always observe all further safety instructions in the manuals for the optionally available eMH3 Wallbox
and other accessories for the POLEMH6.
User information
Ensure that rated voltage and rated current of the supply cable at the installation location comply with the param-
eters of your local electricity grid and that the rated output of the wallbox(es) installed on the POLEMH6 is not
exceeded during operation.
Local safety regulations regarding the operation of electrical devices for the country in which you operate the
wallbox(es) installed on the POLEMH6 always apply.
Never install or operate the POLEMH6 in confined spaces. In particular, it must be ensured that vehicles can be
parked at a suitable distance from the POLEMH6 for charging and can be connected to the charging cable without
tension.
Make sure that the POLEMH6 is always closed and locked when in use. All authorised users must be aware of the
'unlock' position of the key.
No user-maintainable parts are located inside the device.
Only have the POLEMH6 repaired by a qualified specialist electrical company.

Important information – User information | 7
An eMH3 Wallbox installed on the POLEMH6 may only be operated after it has been installed without any techni-
cal faults and subsequently approved by a qualified specialist electrical company.
NOTE
Changes to functions and design features
Please note that all technical details, specifications and design characteristics of the product may be changed
without prior notice.

| Dimensional drawings and dimensions – POLEMH6
8
Dimensional drawings and dimensions
The dimensions and mounting points of the POLEMH6 as well as the optional EMH9996 foundation are shown in the
following dimensional drawings.
POLEMH6
Mounting pole for installing up to two eMH3 Wallboxes, front and rear view as well as view from below
(all dimensions in mm)
Detailed view of the front and back
A
D
C
B
D
A
These four thread points are used to attach the mounting plate of the eMH3
Wallbox. The required M8×25 rounded-head screws are included with the
POLEMH6.
BThese two thread points are used for directly mounting the WPR36 weather
shield on the POLEMH6 (see “Accessories” on page12).
CThe supply cable is inserted into the eMH3 Wallbox via the large opening, while
the two small openings are for data cables.
DThese two thread points are each used for directly mounting one CABHOLD ca-
ble holder on the POLEMH6 (see “Accessories” on page12).
1624
1520104
410
426
331
410
360
286
286

Dimensional drawings and dimensions – EMH9996 | 9
EMH9996
ABL offers the EMH9996 foundation as an optional accessory for installing the POLEMH6: The foundation block is
made from grade C20/25 concrete and complies with exposure classes XC4 and XF1 for outdoor use. Integrated
threaded anchors ensure stable and secure installation of the POLEMH6. The supply cable and data cables can be fed
into the mounting pole from below via two recessed empty conduits (DN 100).
NOTE
Using a custom foundation
These instructions describe how to install the POLEMH6 on the EMH9996 concrete foundation. In principle, it is
possible to make a custom foundation, but this must be based on the specifications of the EMH9996.
If you wish to install and operate the POLEMH6 on a self-made foundation, a stable base and fault-free oper-
ation outdoors cannot be guaranteed.
Concrete foundation for installing a POLEMH6 mounting pole, section as well as isometric, top and front view
(all dimensions in mm)
420
420
2× DN100
M10
420
420
420
12080
163
286
420
286
30°

| Dimensional drawings and dimensions – EMH9996
10
Detailed view of the top side
A
A
B
C
A
These four threaded anchors are used to mount the base of
the POLEMH6 mounting pole using the washers and M10×35
hexagon socket screws supplied.
BThe two empty conduits are used to feed the supply and data
cables through the foundation into the POLEMH6.
CIf the POLEMH6 is installed outside the rolling sphere,
grounding anchors can be attached here with M12 threads.

Introduction to the POLEMH6 – Identification of the POLEMH6 | 11
Introduction to the POLEMH6
Thank you very much for choosing the POLEMH6 mounting pole from ABL!
The POLEMH6 is designed for the outdoor installation of up to two ABL eMH3 Wallboxes. The internal small distribu-
tion box with terminal block provides protection against contact and weather and allows virtually maintenance-free
wiring of the wallbox(es) to the electricity grid. Thanks to additional top-hat rails, further modules (such as lightning
protection) can be installed as required. Access is via a housing cover that protects the interior of the mounting pole
from unauthorised access by means of an integrated lock.
Thanks to the powder-coated metal housing, the POLEMH6 is optimally protected against corrosion and, with hous-
ing impermeability in accordance with IP44, it is ideal for outdoor installation. To ensure a stable and secure posi-
tion outdoors, ABL recommends installing on the optionally available EMH9996 concrete foundation. Alternatively, a
self-constructed foundation can be used, but it must meet the same specifications.
Further information on technical data is available in the appendix from page28.
Identification of the POLEMH6
There is a rating plate on the inside right of the rear panel to identify the
POLEMH6. Before installation, open the housing cover and check the rating
plate to make sure that the model you have is the mounting pole intended
for your eMH3 Wallbox.
You can find further information on the POLEMH6 in section “Technical spec-
ifications” on page28.
Items supplied
The product is delivered including the following components:
POLEMH6 mounting pole, 1piece Key for unlocking the housing cover,
3 pieces
Download note (multilingual), 1
piece
Zubehör
Download-Hinweis, Stand 10/2019
Produktnummer: 0301431_b
Die ausführlichen Installations- und
Bedienungsanleitungen stehen als
Download unter www.ablmobility.de
bereit.
The detailed installation and operating
manuals are available for download at
www.ablmobility.de.
DE
EN
ABL_Downloadhinweis-Anleitung_01.indd 1 21.10.19 17:03
M8×25 rounded-head screw, hexagon
socket with flange, 8 pieces
When delivered, the inlets for the supply and data cables as well as the thread points for fastening the wallbox, the
weather shield and the cable holders are also fitted with suitable blind plugs.
NOTE
Checking the components included
Check immediately after unpacking whether all components are included: should any components be missing,
please contact the dealer from whom you purchased the POLEMH6.
WARNING!
Storing the original packaging
Keep the original packaging in a safe place. In the event of damage that cannot be repaired on site, the mount-
ing pole may have to be dismantled and sent in for repair. The following requirements must be met for proper
shipping:
The mounting pole must be protected from mechanical damage during transport by means of the original
packaging or other equivalent packaging.
To ensure safe shipping, fixed transport on a pallet is recommended.
POLEMH6
230/400V 50Hz 63A
IP65
IEC 61439-3
MADE IN GERMANY
POLEMH6
ABL SURSUM
Bayrische Elektrozubehör GmbH & Co. KG
Albert-Büttner-Straße 11
D-91207 Lauf / Pegnitz

| Introduction to the POLEMH6 – Accessories
12
Accessories
The following accessories for the POLEMH6 mounting poles are available separately:
EMH9996
Precast concrete foundation for installing the mounting pole POLEMH6
h = 420 mm, w = 420 mm, d = 420 mm
WPR36
Weather shield for installation on an exterior wall or the mounting pole
POLEMH6
h = 142mm, w = 515mm, d = 285mm
CABHOLD
Cable holder with charging plug receptacle for installation on an exterior wall or
an ABL mounting pole
h = 187mm, w = 76mm, d = 105mm
You can find further information on ABL charging stations and accessories at
www.ablmobility.de/en.

Installation – Requirements for the installation site | 13
Installation
When installing the POLEMH6, various specifications regarding the location and the connection technology must be
met in order to ensure safe operation.
Requirements for the installation site
The POLEMH6 was developed for outdoor use. To ensure proper installation, you as the operator must adhere to the
following specifications regarding the location and positioning.
Be sure to observe all local regulations for electrical installations, fire prevention and accident prevention.
All guidelines for the installation of low-voltage systems in accordance with IEC 60364-1 and IEC 60364-5-52
apply.
The installation surface must have sufficient strength to withstand the mechanical loads. It is therefore strongly
recommended not to install the POLEMH6 directly on asphalt or a concrete floor, but to use a concrete foundation
such as the ABL EMH9996 with suitable specifications (concrete C20/25 in accordance with EN 206-1:2013).
A sufficiently dimensioned supply cable for the power supply of the respective wallbox must be provided at
the installation location. The supply cable must be laid so that it lines up with the pipe opening in the concrete
foundation and in the ground. If necessary, the supply cable must be protected against mechanical influences (by
a suitable hose or pipe) in the area in front of the foundation.
To integrate the wallbox(es) installed on the POLEMH6 in a group installation, suitable data cables must also be
laid to the installation location.
Suitable collision protection must be provided on site to provide the POLEMH6 with mechanical protection from
collision with a vehicle.
The minimum distance between the vehicle and the POLEMH6 should be no less than 50cm and no more than
150cm.
Select the installation location so that the charging cable from the wallbox easily reaches the charging socket on
the vehicle: the cable must not under any circumstances be strained when connected to the vehicle.
For the safe operation of your mounting pole, minimum distances to other technical installations must be ob-
served: you can obtain further information from your electrical contractor or distributor.
The POLEMH6 should not be installed in high-traffic areas or along thoroughfares.
The POLEMH6 is designed for operation at high ambient temperatures. However, it is important to ensure that the
maximum permissible operating temperature is not exceeded due to external influences such as direct sunlight or
similar.
Specifications for the mechanical installation of the POLEMH6
The entire installation of the POLEMH6 should always be carried out by qualified personnel: at least two people are
required for the mechanical installation.
For mechanical installation of the POLEMH6, you will need the following components:
Key for unlocking the housing
cover (included with the
POLEMH6)
EMH9996 concrete foun-
dation for installing the
mounting pole (available as
accessory)
DIN 912 A2 M10×35 hexagon
socket screw, 4 pieces
(included with the EMH9996)

| Installation – Laying the EMH9996 foundation
14
WARNING!
Using a custom foundation
As an alternative to the EMH9996 concrete foundation, which is available as an accessory, you can also create
your own foundation and use it for installing the POLEMH6.
The calculation, design and manufacture of the self-made concrete foundation are the sole responsibility of
the operator or the company carrying out the installation on behalf of the operator.
In addition, you will need the following tools:
Torque spanner with Allen key,
6mm Spirit level
Phillips screwdriver Slotted screwdriver
Torx screwdriver Hexagon screwdriver
Tape measure Bricklaying tools
Concrete screed (mixed) Vacuum lifting tool (optional)
Laying the EMH9996 foundation
The optional EMH9996 concrete foundation from ABL provides a level installation surface for the POLEMH6 mounting
pole and ensures the necessary stability and support via factory-inserted screw anchors.
Please note: these installation instructions only describe how to install the POLEMH6 on the EMH9996 concrete foun-
dation, which is available as an accessory.
DANGER!
Dangerous electrical currents
Always observe the 5 safety rules:
1Cut power source
2Secure all cut-off devices
3Verify absence of voltage
4Ground and short-circuit
5Cover or bar access to adjacent components under voltage
The supply cable must not be reconnected to the electricity grid until Step 4 in the section “Electrical connection
of the POLEMH6” on page23!

Installation – Laying the EMH9996 foundation | 15
Proceed as follows:
1 Dig a ditch suitable for the EMH9996 foundation
(recommended: 100×100cm).
yTake into account the dimensions of the foun-
dation (H×W×D: 420×420×420mm) as well
as a levelling layer (crushed rock/gravel) and a
cement mortar layer of about 10cm under the
foundation.
100
100
52
2 Apply a first layer of cement mortar with a height
of approx. 10cm at the positioning location of the
foundation.
100
52
10
NOTE
Alignment of the foundation
Please note the following instructions for aligning the EMH9996:
The top of the EMH9996 can be identified by the recessed threaded anchors for screwing the POLEMH6 in
place.
As the POLEMH6 can be mounted on the foundation in any direction (0°/90°/180°/270°), the empty conduits
on the side of the EMH9996 can be aligned with the supply and data cables in the ditch as required.
3 Place the foundation centrally on the cement mortar
layer.
yThis step must be performed by two people.
NOTE
Wiring of the empty conduits
The two empty conduits on the EMH9996 ensure a high degree of flexibility when laying the cabling for group
installations.
For a series connection in a group installation, you can run the power cable along with shielded data cables
through one empty conduit or distribute them between the two empty conduits.
For unshielded data cables, it is recommended to use one empty conduit exclusively for the power cable and
the other for the data cables.

| Installation – Installing the POLEMH6 on the EMH9996 foundation
16
4 Make sure the foundation is level in all planes on
the cement mortar layer and then create a sup-
porting structure all the way around the foundation
with concrete screed (45° smooth line to around the
lower edge of the conduit openings).
Glättkelle
5 Allow the concrete to set completely over a reason-
able period of time so that the foundation is pro-
tected from slipping when the ditch is eventually
filled and compacted with compactable soil.
6 Run a supply cable with sufficient length (approx.
0.8m) through an empty conduit of the foundation
for connection to the high-current terminals in the
small distribution board of the POLEMH6.
7 Run data cables with sufficient length (approx.
2.0m) through the same or the second empty con-
duit for the subsequent installation of the wallbox
on the mounting pole.
8 Fill the entire ditch around the foundation to ground
level with compactable soil.
yThe soil must be filled and compacted in layers
and evenly on all sides.
9 Smooth out the surface.
Installing the POLEMH6 on the EMH9996 foundation
After placing the foundation, you can install the POLEMH6 on the EMH9996.
Proceed as follows:
1 Unlock the double cylinder pivot lever of the
POLEMH6.
ySlide the cover of the left-hand locking cylinder
to the side.
yUnlock the locking cylinder with the key
supplied.
yFlip the control lever outwards and turn it up-
wards 180°.

Installation – Installing the POLEMH6 on the EMH9996 foundation | 17
2 Lift the unlocked housing cover upwards, pull it off
the housing and set it aside.
yUsing a vacuum lifting tool or similar tool will
make it easier to lift off the housing cover.
1
2
3 Place the POLEMH6 on the foundation and run the
power and data cables through the base.
yThis step must be performed by two people.
NOTE
Cable lengths for connection
Please note the following recommendations when connecting the power and data cables:
Power line: To connect to the terminal block on the lowest standard rail of the small distribution board, a
cable length of approx. 0.8m from the foundation is recommended.
Data cables: To connect to the bus interfaces of the eMH3 Wallbox, a cable length of approx. 2m from the
foundation is recommended
4 Align the POLEMH6 over the holes on the foun-
dation and use the torque spanner to screw the
M10×35 hexagon socket screws over washers into
the threaded anchors of the foundation.
yThe allocation scheme for the thread anchor is
illustrated in section “Detailed view of the top
side” on page10.

| Installation – Installing the POLEMH6 on the EMH9996 foundation
18
5 Use the slotted screwdriver to loosen the eight
screws in the upper part of the small distribution
board and pull off the upper part.
6 Run the power line through the lower PG cable
gland into the case of the small distribution board
and secure the cable gland.
NOTE
Strain relief for the power line
A cable clamp is recommended to secure the supply cable in the profile rail under the small distribution board.
This then serves as strain relief for the electrical connection.
7 Lay the data cables behind the sheet metal cover of
the small distribution board.

Installation – Specifications for the mechanical and electrical installation of the wallboxes | 19
Specifications for the mechanical and electrical installation of the wallboxes
The mechanical and electrical installation of the wallbox on the POLEMH6 must be carried out by qualified electri-
cians: It is recommended that the installation be carried out by two persons.
DANGER!
Dangerous electrical currents
Always observe the 5 safety rules:
1Cut power source
2Secure all cut-off devices
3Verify absence of voltage
4Ground and short-circuit
5Cover or bar access to adjacent components under voltage
The supply cable must not be reconnected to the electricity grid until Step 4 in the section “Electrical connection
of the POLEMH6” on page23!
For mechanical and electrical installation, you will need the following components included with the POLEMH6:
Key for unlocking the housing
cover
M8×25 rounded-head screw
for fastening the mounting
plate (4pieces per wallbox)
In addition, you will need the following components and tools:
PG 13.5 cable gland (for each
M20 cable entry)
Triangular key
(included with the wallbox)
× 2
× 1
Torx screwdriver Slotted screwdriver
Phillips screwdriver Hexagon screwdriver
Stripping tool Hammer
Voltage tester

| Installation – Installing the eMH3 Wallbox on the POLEMH6
20
NOTE
Additional tools for installing the wallbox
Additional accessories and tools are required for the installation and start-up of the eMH3 Wallbox. For more in-
formation, see the associated installation instructions, which can be downloaded here:
Installation instructions eMH3
Installing the eMH3 Wallbox on the POLEMH6
This section describes how to install an eMH3 wallbox on the POLEMH6.
Proceed as follows:
1 Screw the mounting plate of the eMH3 Wallbox to
one side of the mounting pole using the hexagon
screwdriver and four M8×25 rounded-head screws.
2 Open the housing cover of the eMH3 Wallbox
using the corresponding triangular key and flip it
forwards.
3 Loosen the screw holding the internal electronic
components cover in place using the Torx screw-
driver and put it aside.
yKeep the screw in a safe place.