
AM Series Boilers and Water Heaters
OMM-0100_0D AERCO International, Inc. •100 Oritani Dr. •Blauvelt, NY 10913 Page 3of 154
GF-146 Ph.: 800-526-0288 03/28/16
4.9 LOW WATER CUTOFF (LWCO).................................................................................................................39
4.10 EXPANSION TANK AND MAKEUP WATER............................................................................................40
4.11 CIRCULATOR HEATING PUMP...............................................................................................................40
4.12 DOMESTIC HOT WATER SYSTEM PIPING WITH DIRECT WATER HEATER – WATER HEATERS..42
4.13 SCALDING – WATER HEATERS.............................................................................................................43
4.14 CONDENSATE DISPOSAL.......................................................................................................................45
CHAPTER 5: INSTALLATION - ELECTRICAL....................................................................47
5.1 ELECTRICAL CONNECTIONS – BOILERS AND WATER HEATERS......................................................47
5.1.1 Power Supply Cable Connection - Boilers and Water Heaters..............................................................................47
5.1.2
ConnectingUnitsinCascade
- Boilers and Water Heaters ..................................................................................48
5.1.3 0-10 VDC Input Connections - Boilers and Water Heaters....................................................................................48
5.1.4 MODBUS Interface Connections – Boilers and Water Heaters .............................................................................49
5.2 ELECTRICAL CONNECTIONS – BOILERS ONLY....................................................................................50
5.2.1 Enable/Disable - Boilers.........................................................................................................................................50
5.2.2 Installing the Outdoor Temperature Sensor - Boilers............................................................................................50
5.2.3 Indirect Water Heater Connection - Boilers..........................................................................................................51
5.2.4 Indirect Water Heater Priority Selection - Boilers.................................................................................................52
5.3 ELECTRICAL CONNECTIONS – WATER HEATERS ONLY.....................................................................52
5.3.1 Storage Tank Connection - Water Heaters............................................................................................................52
5.4 AMR RAPID RECOVERY OPTION WIRING..............................................................................................52
CHAPTER 6: INSTALLATION – VENTING AND COMBUSTION AIR PIPING......................55
6.1 COMBUSTION AIR CONTAMINATION PREVENTION .............................................................................55
6.2 GENERAL VENTING AND AIR PIPING SYSTEMS...................................................................................56
6.3 MIN/MAX ALLOWABLE COMBUSTION AIR AND VENT PIPING LENGTHS...........................................58
6.4 GENERAL VENTING AND COMBUSTION AIR PIPING INSTALLATION.................................................58
6.5 SPECIFIC VENT INSTALLATIONS ............................................................................................................58
6.5.1 Installations Requiring High Temperature Venting...............................................................................................59
6.5.2 Sealing of PVC, CPVC or ABS..................................................................................................................................60
6.5.3 PVC/CPVC Vent Piping Materials...........................................................................................................................60
6.5.4 Air Intake and Vent Starter Pieces.........................................................................................................................61
6.5.5 Single Pipe Venting (Room Air Combustion) .........................................................................................................62
6.5.6 Determining Vent Termination Location...............................................................................................................63
6.5.7 Sidewall Termination - Two pipes .........................................................................................................................64
6.5.8 Combustion Air and Ventilation Openings............................................................................................................65
6.5.9 Two Permanent Openings Method.......................................................................................................................65
6.5.10 One Permanent Opening Method.......................................................................................................................65
6.5.11 Installing Vent and Air Piping into Sidewall.........................................................................................................65
6.5.12 Sidewall Termination and Fittings.......................................................................................................................66
6.5.13 Multiple Vent and Air Terminations....................................................................................................................66
6.5.14 Sidewall Termination – Concentric Vent.............................................................................................................67
6.5.15 Sidewall Termination Installation........................................................................................................................68
6.5.16 Multi-venting Sidewall Terminations ..................................................................................................................69
6.5.17 Determining Location of Vertical Termination....................................................................................................70
6.5.18 Vertical Vent and Air Roof Termination Preparation ..........................................................................................71
6.5.19 Installing Vertical Vent and Air Roof Terminations .............................................................................................71
6.5.20
InstallingMultipleVentand AirVerticalTerminations
.....................................................................................72
6.5.21 Vertical Termination – Concentric Vent..............................................................................................................73
6.5.22 Determining Location of Vertical Concentric Vent Termination.........................................................................73
6.5.23
Multi-VentingVerticalTerminations
..................................................................................................................73
CHAPTER 7: INSTALLATION – NATURAL GAS ................................................................75
7.1 GAS SUPPLY PIPING.................................................................................................................................75