BMK 750-3000 Platinum Boiler INSTALL and STARTUP GUIDE
CONTENTS
OMM-0115_0A AERCO International, Inc. •100 Oritani Dr. •Blauvelt, NY 10913 Page 3of 128
GF-200 Ph.: 800-526-0288 03/15/2017
2.11.13 Fault Relay (NC, COM, & NO) ..................................................................................................... 39
2.11.14 Auxiliary Relay Contacts (NC, COM, & NO) ................................................................................39
2.12 FLUE GAS VENT INSTALLATION....................................................................................40
2.12.1 MASSACHUSETTS INSTALLATIONS ...............................................................................................40
2.13 COMBUSTION AIR...........................................................................................................41
2.13.1 DUCTED COMBUSTION AIR ..........................................................................................................41
2.14 BENCHMARK PUMP RELAY ...........................................................................................42
2.15 SEQUENCING ISOLATION VALVE INSTALLATION........................................................43
SECTION 3: START SEQUENCE ........................................................................45
3.1 INTRODUCTION.................................................................................................................45
3.2 START SEQUENCE ...........................................................................................................45
3.3 START/STOP LEVELS.......................................................................................................51
3.4 START/STOP LEVELS – AIR/FUEL & ENERGY INPUT.....................................................52
3.4.1 BMK 750/1000 Air/Fuel Valve Position and Energy Input ............................................................. 52
3.4.2 BMK 1500 Air/Fuel Valve Position and Energy Input ..................................................................... 53
3.4.3 BMK 2000 Air/Fuel Valve Position and Energy Input .....................................................................54
3.4.4 BMK 2500 (Nat. Gas) Air/Fuel Valve Position and Energy Input .................................................... 55
3.4.5 BMK 3000 Air/Fuel Valve Position and Energy Input .....................................................................56
SECTION 4: INITIAL START-UP ........................................................................57
4.1 INITIAL START-UP REQUIREMENTS................................................................................57
4.2 TOOLS & INSTRUMENTS FOR COMBUSTION CALIBRATION........................................57
4.2.1 Required Tools & Instrumentation................................................................................................. 57
4.2.2 Installing Gas Supply Manometer .................................................................................................. 58
4.2.3 Accessing the Analyzer Probe Port................................................................................................. 60
4.3 FUEL TYPES AND COMBUSTION CALIBRATION............................................................61
4.4 COMBUSTION CALIBRATION...........................................................................................62
4.4.1 NATURAL GAS Combustion Calibration.......................................................................................... 63
4.4.2 PROPANE GAS COMBUSTION CALIBRATION.................................................................................. 67
4.5 REASSEMBLY....................................................................................................................71
4.6 DUAL FUEL SWITCHOVER ...............................................................................................71
4.6.1 Switchover from NATURAL GAS to PROPANE ................................................................................ 72
4.6.2 Switchover from PROPANE to NATURAL GAS ................................................................................ 73
4.7 OVER-TEMPERATURE LIMIT SWITCHES........................................................................74
4.7.1 Digital Alarm Switch Checks and Adjustments............................................................................... 75
SECTION 5: SAFETY DEVICE TESTING ..............................................................77
5.1 TESTING OF SAFETY DEVICES.......................................................................................77
5.2 LOW GAS PRESSURE TEST.............................................................................................78
5.2.1 LOW GAS PRESSURE TEST: BMK 750 – 2500 ..................................................................................78
5.2.2 LOW GAS PRESSURE TEST: BMK 3000 Only....................................................................................80
5.3 HIGH GAS PRESSURE TEST............................................................................................82
5.3.1 HIGH GAS PRESSURE TEST: BMK 750 – 2500 ................................................................................. 82
5.3.2 HIGH GAS PRESSURE TEST: BMK 3000 Only...................................................................................84
5.4 LOW WATER LEVEL FAULT TEST....................................................................................86
5.5 WATER TEMPERATURE FAULT TEST.............................................................................87