3.5 SETUP MENU ....................................................................................................................................... 39
3.6 CONFIGURATION MENU .................................................................................................................... 40
3.7 TUNING MENU ..................................................................................................................................... 42
3.8 COMBUSTION CAL MENU .................................................................................................................. 43
3.9 BST (BOILER SEQUENCING TECHNOLOGY) MENU ....................................................................... 43
3.10 START SEQUENCE ........................................................................................................................... 46
3.11 START/STOP LEVELS ....................................................................................................................... 50
CHAPTER 4. INITIAL START-UP..................................................................................................51
4.1 INITIAL START-UP REQUIREMENTS ................................................................................................. 51
4.2 TOOLS AND INSTRUMENTATION FOR COMBUSTION CALIBRATION .......................................... 51
4.2.1 Required Tools & Instrumentation .................................................................................................................52
4.2.2 Installing Gas Supply Manometer...................................................................................................................52
4.2.3 Accessing the Analyzer Probe Port .................................................................................................................53
4.3 NATURAL GAS COMBUSTION CALIBRATION .................................................................................. 54
4.4 REASSEMBLY ...................................................................................................................................... 60
4.5 OVER-TEMPERATURE LIMIT SWITCHES ......................................................................................... 61
4.5.1 Digital Alarm Switch Checks and Adjustments ...............................................................................................61
CHAPTER 5. MODE OF OPERATION...........................................................................................63
5.1 INTRODUCTION ................................................................................................................................... 63
5.2 INDOOR/OUTDOOR RESET MODE ................................................................................................... 63
5.2.1 Reset Ratio......................................................................................................................................................63
5.2.2 Building Reference Temperature....................................................................................................................63
5.2.3 Outdoor Air Temperature Sensor Installation ................................................................................................63
5.2.4 Indoor/Outdoor Startup .................................................................................................................................63
5.3 CONSTANT SETPOINT MODE ........................................................................................................... 64
5.3.1 Setting the Setpoint ........................................................................................................................................64
5.4 REMOTE SETPOINT MODES ............................................................................................................. 65
5.4.1 Remote Setpoint Field Wiring.........................................................................................................................65
5.4.2 Remote Setpoint Startup ................................................................................................................................66
5.5 DIRECT DRIVE MODES....................................................................................................................... 66
5.5.1 Direct Drive Field Wiring.................................................................................................................................67
5.5.2 Direct Drive Startup ........................................................................................................................................67
5.6 AERCO CONTROL SYSTEM (ACS) .................................................................................................... 67
5.6.1 ACS External Field Wiring................................................................................................................................67
5.6.2 ACS Setup and Startup....................................................................................................................................68
5.7 COMBINATION CONTROL SYSTEM (CCS) ....................................................................................... 68
5.7.1 Combination Control System Field Wiring......................................................................................................69
5.7.2 Combination Control System Setup and Startup............................................................................................69
CHAPTER 6. SAFETY DEVICE TESTING.....................................................................................71
6.1 TESTING OF SAFETY DEVICES ......................................................................................................... 71
6.2 LOW GAS PRESSURE FAULT TEST .................................................................................................. 72
6.3 HIGH GAS PRESSURE TEST ............................................................................................................. 73
6.4 LOW WATER LEVEL FAULT TEST ..................................................................................................... 74
6.5 WATER TEMPERATURE FAULT TEST .............................................................................................. 75
6.6 INTERLOCK TESTS ............................................................................................................................. 76
6.6.1 Remote Interlock Test.....................................................................................................................................76
6.6.2 Delayed Interlock Test ....................................................................................................................................76
6.7 FLAME FAULT TESTS ......................................................................................................................... 77
6.8 AIR FLOW FAULT TESTS .................................................................................................................... 79
6.8.1 Blower Proof Switch Test................................................................................................................................79