9
OPERATION
START OF THE PUMP
Before starting the pump you should take the following steps:
a) Please make sure that the delivery tube is correctly connected and that the bolts are well tightened.
b) Please check if in the vat there is the liquid, which has to be pumped, and that its level is at least high
enough to cover the whole body of the pump.
c) Close the exclusion valve on the delivery tube. If the pump is equipped with an external flow line, please
open the tap and make sure that before the start of the pump the liquid reaches the guide sleeves of the
machine capacity of 51/min. for every element that is flowed through and pressure of + 0,5 Bar compared
with the operating pressure, if the bush, which has to be flowed through, is situated at the back of the
pump body. For internal flushing, pressure and flow rate are pre-calculated by sizing the pipe of the
flushing. In this case, the pump should be start-up from the maximum level of liquid in the suction tank.
d) After having completed the phases (a), (b) and (c) please make sure that the sense of rotation of the
motor is correct (see arrow on the cap) by actuating the switch with a rapid sequence of start and stop.
Please do not insist on making the pump turn in the inverse sense, since this operation could cause
serious damages on the machine.
To change the sense of rotation you only have to invert two of the three terminal wires of the motor.
e) Start the motor and slowly open the exclusion valve on the delivery until you reach the required capacity
for operating the pump(Please do not leave the sluice valve of the pressure tube closed for a long time).
f) Check the input values of the pump by taking into consideration the values marked on the motor label
and make sure that these values (input power in kw or intensity in ampere) are not exceeded.
STOP OF THE PUMP
If the delivery tube is equipped with a check valve, the stop of the machine may take place without any
particular precaution.
In the negative case the delivery valve has to be slowly closed before stopping the motor so that water
hammers in the pressure system are avoided and the liquid can flow out through the pump. Only at this point
you may close the eventual auxiliary flowing from an external source, provided that the machine is equipped
with such a device. We recommend short periodical operating controls of the pump.
Recommended Safety Measures
In the start as well as in the stop phase of the pump the operator should be adequately equipped for
reasons of health preservation.This means rubber gloves and boots, anti-acid overalls, helmet with
protective visor for the face and the indispensable equipment for each operator, which excludes the
risk of physical damages.It is absolutely forbidden to introduce the fingers or other parts of the body
into the orifices and the various openings. The pump is equipped with movable parts.
The mentioned operations have to be performed by skilled staff.
TEMPERATURES
For the correct operation of the machine should be observed the following temperature values, which are
listed on the data sheet.
Moreover we indicate the maximum and minimum operating temperatures, which have to be strictly
observed for a continuous working cycle of eight hours.
PP = -10° C + 75° C
PVDF = -40° C + 90° C
The relative material is specified on the data sheet, on the delivery bill and on the invoice.