manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Alien Flier
  6. •
  7. Sport & Outdoor
  8. •
  9. Alien Flier EZ-Up User manual

Alien Flier EZ-Up User manual

Popular Sport & Outdoor manuals by other brands

Tumbl Trak Downhill Incline Assembly instructions

Tumbl Trak

Tumbl Trak Downhill Incline Assembly instructions

MORPHO TRIMMYALP LIGHT 13MHRAQYLAC manual

MORPHO

MORPHO TRIMMYALP LIGHT 13MHRAQYLAC manual

Jumpking JK146PBY user guide

Jumpking

Jumpking JK146PBY user guide

Sportable Scoreboards SSB-3328DSP installation instructions

Sportable Scoreboards

Sportable Scoreboards SSB-3328DSP installation instructions

Hudora 76171 INSTRUCTIONS ON ASSEMBLY AND USE

Hudora

Hudora 76171 INSTRUCTIONS ON ASSEMBLY AND USE

Flybar POGO TRICK BOARD owner's manual

Flybar

Flybar POGO TRICK BOARD owner's manual

KICK Decagon Assembly instructions

KICK

KICK Decagon Assembly instructions

CHINESPORT Spa 01325 Use and maintenance manual

CHINESPORT Spa

CHINESPORT Spa 01325 Use and maintenance manual

Gared Pro Jam GP10G72DM Installation, operation and maintenance instructions

Gared

Gared Pro Jam GP10G72DM Installation, operation and maintenance instructions

southpaw enterprises 303104 instruction sheet

southpaw enterprises

southpaw enterprises 303104 instruction sheet

SKLZ QUICKSTER FUTSAL GOAL Getting started

SKLZ

SKLZ QUICKSTER FUTSAL GOAL Getting started

Cornilleau 200 X OUTDOOR manual

Cornilleau

Cornilleau 200 X OUTDOOR manual

Master MASTRAMP96-96 manual

Master

Master MASTRAMP96-96 manual

Playlife UT-2206 instruction manual

Playlife

Playlife UT-2206 instruction manual

Brunswick Metro installation manual

Brunswick

Brunswick Metro installation manual

Gill 2235 Install

Gill

Gill 2235 Install

AluSport EL118 RIGHT manual

AluSport

AluSport EL118 RIGHT manual

Harrod RUG-005 quick start guide

Harrod

Harrod RUG-005 quick start guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

EZ-Up Zip Line Installaon Guide
Tools Needed: 7/16” wrench
Step 1.
DO NOT START YOUR LINE HIGHER
THAN 12 off of the ground. The ideal
site for your zip line is a clear span over
level ground. Using a ladder, tack the
oponal wooden blocks to the upper
tree with nails at the desired height. If
you don’t have wooden blocks you may
gently tack nails into the tree's bark only.
This will help hold the cable in place
during installaon. Nails may be
removed aer installaon is complete.
Step 3.
Go to lower tree. Thread black webbing
sling and red safety sling though the
pieces of mesh sleeves. Ratchet and
loop must be on the same side. Use as
many sleeves as needed to protect your
tree and the webbing. You may need to
stretch the mesh.
Step 4.
Place the assembly from Step 3 around
the lower tree as shown.
Step 2.
Unroll the
cable between
the trees on
the ground.
Wrap the cable
around the
upper tree as
shown, so it is
resng on the nails. Pull the cable ght
and go to the other end of the zip line.
Mount your zip line to healthy, live trees that are at least 12" in diameter and firmly rooted in the ground!
Step 5.
Grab the end with the black webbing
loop in one hand. Thread the black
webbing strap through the black
webbing loop.
Step 6.
Insert the flat end of the black sling in to
the slot/barrel of the black ratchet
Step 7.
Reel in approximately 6" of the black
webbing by ratcheng the handle -
approximately 1 ½ turns.
Step 8.
Pull the cable ght to determine where
the lower eye on the cable needs to go. It
should be about 2 . from the large
hook on the lower tree. This is necessary
to compensate for slack in the line.
Finishing Up
Adjustment between the red and black ratchet and
webbing may be necessary. When the black webbing is
at the desired tension, loosen the red safety line, pull the
webbing taut, and re-ghten the red safety link.
Be sure that the ratchet barrels do not become too full.
Coil any excess cable or red safety link and secure with a
zip e.
Make sure both ratchets are in the closed/locked
posion.
Step 13.
A ach the hook on the black ratchet to
the cable eye.
Step 14.
Tighten the black ratchet to the desired
cable tension to eliminate sag in the line.
© 2018 Alien Flier, LLC. All Rights Reserved.
INSPECT ENTIRE SYSTEM FOR WEAR,
DAMAGE & SERVICEABILITY BEFORE
EACH USE.
CHECK YOUR WORKMANSHIP & ALL
CONNECTIONS PRIOR TO EVERY RIDE!
WARNING
!
INSTALLATION USEor of Alien
Flier products is untilprohibited
you have and theread understood
Installation Manual, Warnings,
Assumption of Risk Statement &
Liability Waiver.
Step 10.
Slide the webbing and mesh assembly
upthetreetocreateagradeNO
GREATER 3-4% MUSTthan . You
compensate for the slope of the land if
you are not installing over level ground.
Use an Inclinometer App or a qualified
contractor to insure the angle of your
line is within these limits. You can use a
string or zip e to hold the assembly
ghtly around the trees for posioning.
Step 11.
A ach the small hook on to the cable
eye that you created.
Step 12.
Thread the red safety link webbing
through the slot in the base of the hook.
Then thread it through the ratchet
slot/barrel and pull it ght. Begin
ratcheng unl the black ratchet and
hook can be a ached to the cable eye.
Step 9.
Using the 3 cable clamps and a 7/16"
wrench, loop the cable and create the
eye. Make sure the eye is 2 ½ -3 inches
long. Install the cable clamps as in the
photo - all facing the same direcon.
Make sure they are snug but not ght as
you may have to adjust the posion of
the eye. Once the eye posion is
finalized, ghten the clamps.
EZ-Up Zip Line Installaon Guide
Tools Needed: 7/16” wrench
Mount your zip line to healthy, live trees that are at least 12" in diameter and firmly rooted in the ground!