1. INTRODUCTION
This manual comprises the information concerning the operation, use and maintenance of DEVRON Model
Multi Fuel Fired Pellet and wood Gasification Hot Water Boilers. This manual alone is not sufficient for correct
installation, operation and use; installers, services and end user must follow the rules specified in current EN +
local norms, EC directives and local codes. This manual gives supplementary information and precautions.
Please keep this booklet near the appliance in a safe place in the boiler room for future reference.
Please read the manual very carefully in order to be able to operate your boiler safely and with high
efficiency for a long period.
Due to the continuous development in methods, design and manufacture, the contents of this document may
change at any time and without prior notice. Manufacturer does not accept any responsibility for errors or damage
of any kind that is attributed to this publication.
2. WARNINGS
These safety guidelines should be read and fully understood before the first operation of the system, to
avoid incorrect usage that might lead to personal injury or damage to the system.
This boiler must be installed in accordance with the local and international rules in force, only in a well
ventilated and frost free spaces, indoor but other then living areas.
All installation, assembly and maintenance, repair, replacement of components work must be carried
out exclusively by fully trained, professionally qualified personnel and must conform with this manual and the local
codes and requirements of the authority having jurisdiction, or in the absence of such requirements, apply to the
EEC directives and European (EN) and local norms.
If the boiler is not used for the purposes other then specified in this booklet and incorrect installation,
commissioning and use, can cause a fire or explosion which may result property damage, personnel injury, or loss
of life.
Boiler is designed for hot water operation only (max 90 ⁰C) and the system pressure must be according
to the limited operating pressure specified on the boiler name plate and in this booklet. Heat transfer medium is
water.
Boilers must be fired by fuels specified in this manual (8.2).
This is a B23 appliance so the flue gases must be connected to an adequate draught chimney, without
any flue gas leakage to the boiler room.
It is essential that an appropriate pump is fitted in the circulation system which must be kept in operation
at all the times when the boiler in use.
The filling and make up water must be according to the specifications given in this manual. Long term
water treatment is essential to the economic operation and life of both new and refurbished heating systems.
Never obstruct the ventilation openings to the boiler room for a safe and efficient operation. An
adequate air supply for combustion and ventilation must be provided at all times.
Boilers must not be installed in areas where inflammable vapors and materials are likely to present. To
avoid damage to the boilers, contamination of the combustion air by high levels of dust or halogenated
hydrocarbons (e.g. Solvents, spray can propellants, cleaning agents, adhesives, ect.) must be avoided. The
humidity level must not be high in boiler rooms.
The boiler room must not be used for other purposes and must not have an open connection to the
other closed living areas. Connection door must be air tight, fire resistant and self closing.
All the control devices must be functional and operating with in the limits specified at all the time. If any
of them is null functioning do not operate the system and call a qualified service.
If the boiler is heated above 90 °C, do not supply cold water to the system for rapid cool down. It can
cause an explosion. Wait the boiler cool down naturally up to 40 °C before any operation.
Do not use this appliance if any part has been under water. Immediately call a qualified service to
inspect.
Do not touch the flue gas exit and flue box. These areas are too hot and can cause serious injuries.
In starting a new installation, first commissioning shall be performed by a qualified service.