EHC Fusion E10 Combi –Installation and technical manual Page 13
9. Installation: discharge arrangement /cont
C) Be installed with a continuous fall.
D) It is preferable for the discharge to be visible at both the tundish and the final point of
discharge but where this is not possible or practically difficult there should be clear
visibility at one or other of these locations. Examples of acceptable discharge
arrangements are:
1. Ideally below the fixed grating and above the water seal in a trapped gulley.
2. Downward discharges at a low level; i.e. up to 100mm above external
surfaces such as car parks, hard standings, grassed areas etc. are
acceptable providing that where children play or otherwise come into contact
with discharges, a wire cage or similar guard is positioned to prevent contact
whilst maintaining visibility.
3. Discharges at a high level; e.g. in to metal hopper and metal down pipe with
the end of the discharge pipe clearly visible (tundish visible or not) or onto a
roof capable of withstanding high temperature discharges of water and 3m
from any plastic guttering systems that would collect such discharges
(tundish available).
4. Where a single pipe serves a number of discharges, such as in blocks of
flats, the number served should be limited to not more than 6 systems so
that any installation can be traced reasonably easily. The single common
discharge pipe should be at least one pipe size larger than the largest
individual discharge pipe to be connected. If unvented hot water storage
systems are installed where discharges from safety devices may not be
apparent i.e. in dwellings occupied by blind, infirm or disabled people,
consideration should be given to the installation of an electronically operated
device to warn when discharge takes place.
Worked example
The example below is for G1/2 temperature relief valve with a discharge pipe (D2) having 4
No. elbows and length of 7m from the tundish to the point of discharge.
From Table 1:
Maximum resistance allowed for a straight length of 22mm copper discharge pipe (D2) from
a G1/2 temperature relief valve is: 9.0m
Subtract the resistance for 4 No. 22mm elbows at 0.8m each = 3.2m
Therefore the maximum permitted length equates to: 5.8m
5.8m is less than the actual length of 7m therefore calculate the next largest size. Maximum
resistance allowed for a straight length of 28mm
pipe (D2) from a G1/2 temperature relief valve equates to: 14m
As the actual length is 7m, a 28mm (D2) copper pipe will be satisfactory.
Table 1
Sizing of copper discharge pipe ‘D2’ for a temperature
relief valve with a G1/2 outlet size (as supplied).
Size of
discharge
pipework
Maximum length of straight
pipe (no bends or elbows)
Deduct the figure below from the
maximum length for each bend or
elbow in the discharge pipe
22mm Up to 9m 0.8m
28mm Up to 18m 1m
35mm Up to 27m 1.4m