7
MECHANICAL INSTALLATION
Receiving delivery and handling
When you receive the delivery, check that the contents correspond to your order and that the
final inspection report and list of accessories are included. If anything is unclear, contact the
seller immediately.
Before commencing assembly, it is advisable to read not only these burner installation and
operating instructions carefully but also the installation instructions for the boiler, automation
system and fuel storage.
This way you can ensure beforehand that the main facts and measurements are all satisfactory
for a successful installation. Please note: Keep all operating and installation instructions in a
safe place where you can easily find them when you need them, for example in their own folder
in the boiler room.
The parts of the Ariterm bio-heating system should always be installed by an expert and in
accordance with requirements. We recommend that you carry out installation in the following
order:
1. Put the boiler in position with the burner attached, and ensure that the pipes and flue are
not yet connected.
2. Put the walking floor or other fuel storage unit in position.
3. Fit the augers between the storage and burner.
4. It is advisable not to carry out the final precise positioning of the boiler and fuel storage
until the suitability of the augers has been checked. In the TPYM storage system, the
discharger is fitted to the floor and is the checkpoint for the system.
5. Plumbing and electrical work is done last.
Requirements concerning the installation and operating environment
• e boiler room must be built in accordance with the relevant regulations (E9 Building
Regulations, further information available from your local re authority)
• Air vent in the boiler room wall. Recommended surface area 5 cm2 / 1 kW
• Installation and operating temperature 0 – +40 °C
• e humidity of the boiler room should be 20 – 80 % (in order to prevent condensation)
Necessary connections
• Electrical supply through the control unit to the actuators and instrumentation
• Flue in accordance with the instructions for the boiler to be used. Remember that the
correct underpressure is important for the system to function properly!
• Water for the automatic extinguishing system (a powder extinguishing system is
recommended if pellets are used as fuel)
• Installation of the storage discharger hydraulics
• Connecting the hoses of the hydraulic unit that move the grates of the Multijet burner to
the burner’s cylinders
Space requirement
Please note that there must be sucient space for the burner and burner auger between the
boiler and boiler room wall. When planning, it is advisable to make allowance for the possible
dismantling of the burner and burner auger/motor for maintenance purposes (e.g. door
openings). We recommend a distance of at least 1 metre between the boiler and the wall on the
sides where sweeping and maintenance work will be carried out.