manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Arkam
  6. •
  7. Ventilation Hood
  8. •
  9. Arkam DD-1 User manual

Arkam DD-1 User manual

Modular chimney DD-1 manual
BE SURE, THAT YOU HAVE READ THE MANUAL BEFORE
YOU START INSTAL THE MODULAR CHIMNEY
2015
VILNIUS
Manufacturer: Individial enterprise "Arkam"
Dariaus ir Girėno Str.173, Vilnius
Tel.+370 670 21686
www.arkam.lt
[email protected]
Installation of rubber seal
The rubber seal is design to protect the inside elements of the roof from
raining and humidity. If the roof is embossed, then need to instal the flat
metalplate, which covers the overlap of the roof for requirement edges
and distances. The following operations ensure that the rubber seal is
properly installed:
- place the rubber sealing part on the top of the chimney, pull the
rubber element down, use the soap solution as a lubricant if necessary,
since the diameter of the rubber seal must be 20% smaller than the
diameter of the chimneys;
- press the edges of the rubber seals against the roof surface. Attach
the lower part of the rubber seals to the roof surface using a cold and
waterproof sealant and remove excess sealant;
- fix the edges of the rubber element on the roof using screws or a
metal plate, at a spacing of 35 mm;
- install the clamp on the top of the rubber seals using the tool kit.
Installing the chimney hat
Place the hat deep into the top of the chimney. Do not tighten it
too tight, as cleaning the chimney requires it to be removed.
Installation of a ceiling plate
The ceiling plate is used to close the chimney to a horizontal or
inclined surface (up to 12 degrees). It contains two elements:
- Place the plate elements around the chimney, avoiding the
surface of the chimney housing, so that the hole is closed;
- Fix the edges of the plate with the help of screws.
Cleaning the chimney
To clean the chimney, use special tools made of polymer materials
or stainless steel.
Modular chimney DD-1 general information
A round double wall chimney system is designed to release the
flue gases of the heating system in a natural way. It is suitable for
gas, liquid and solid fuel stoves, the maximum flue gas
temperature is 600 °C. Certified materials that are not harmful to
human health are used to produce chimneys. The inlet pipe has a
nominal size of 115 mm, the pipe is made of stainless steel (class
1.4404, thickness - 0.6 mm).
15
No. 0513
1397 Dariaus ir Girėno Str. 173, Vilnius
Direction of
smoke
Metalsystem parts of chimney
d.115/200 NP/NP, L1000 mm
ESD No.1
111ST0011520
EN 1856-1-T600-N1-D-Vm-L50060-G130
xx-xx-2017
Drawing1. Double wall chimney system identifying elements
Material class Material number Model
50 1,4404* X5CrNiMo 17-12-2
Mineral wool Paroc Wired Mat 80
20 1.4301 X5CrNi 18-10
* Equivalent 1,4571 (X6CrNiMoTi 17-12-2) to material Nr.1.4404
Drawing 2. Material specification
The specifications of the product specification for the design,
installation and operation of chimneys must be strictly follow.
Modular chimney DD-1 elements installation
The assembly of double wall chimneys is carried out as follows:
the tubes of the inner chimney are turned one on top of each other
so that the outer edge of the upper pipe must cover the outer edge
of the lower pipe (see drawing 3), where it is seen that it prevents
the rain from entering the chimney.
Drawing 3. Double wall chimney installation
The inner tubes must be tightly connected to a fireproof 1200 ºC
silicone. When installing the chimney, external pipes are fastened
with stainless steel clamps ISO 15983-4x8-A2 / A2. The amount
of stains depends on the diameter of the outer wall. The amount
of clamps is shown in Table 1.
Table 1
Outer wall pipe diameter, mm Stains quantity, pc
200 3
>200 4
When installing the chimney, you must maintain a safe
distance:
- the distance between the outer wall of the double walled chimney
and the combustible materials must be at least 130 mm;
- the distance between the insulated pipe and the combustible
materials must be at least 500 mm;
- the insulated part of the smoke pipe must be protected (for
example, by means of a network) in order to avoid possible
accidental human exposure to the surface;
- At the intersections of the chimney with other building materials
(ceilings, roof, wall), holes of appropriate size (chimney diameter
plus double distance from combustible materials) must be made.
Empty spaces must be filled with insulating, non-combustible
materials attributed to class "A" with an operating temperature of
600 ° C and higher example with a high-quality mineral wool. It is
prohibited to connect the chimney elements at the intersections of
building structures (see Drawing 4)
- The maximum height of the element above the connecting clamp
of the last chimney element must be 2 m.
Drawing 4. Mounting the chimney device connection at the
intersection of the construction site.

Popular Ventilation Hood manuals by other brands

AEG X69453MDO2 user manual

AEG

AEG X69453MDO2 user manual

Hafele HH-TVG90A Instruction on mounting and use

Hafele

Hafele HH-TVG90A Instruction on mounting and use

Dieter Knoll Collection DK8HV471Y user manual

Dieter Knoll Collection

Dieter Knoll Collection DK8HV471Y user manual

STATESMAN VH60WH instruction manual

STATESMAN

STATESMAN VH60WH instruction manual

Savo P-2405-W user manual

Savo

Savo P-2405-W user manual

System air WVA Instructions for Shipping, Mounting, Initial Operation and Maintenance

System air

System air WVA Instructions for Shipping, Mounting, Initial Operation and Maintenance

FALMEC Plane Top wall FFPLN36W5FS-R Instruction booklet

FALMEC

FALMEC Plane Top wall FFPLN36W5FS-R Instruction booklet

Electrolux EFG5530 manual

Electrolux

Electrolux EFG5530 manual

Windster WS-50E Series user manual

Windster

Windster WS-50E Series user manual

ROBLIN Rubis user manual

ROBLIN

ROBLIN Rubis user manual

Defy DCH310 user manual

Defy

Defy DCH310 user manual

NuTone WhispAire WA6500 Series installation instructions

NuTone

NuTone WhispAire WA6500 Series installation instructions

Greenheck Vektor Installation, operation and maintenance

Greenheck

Greenheck Vektor Installation, operation and maintenance

Record Power CX2600 Original instruction manual

Record Power

Record Power CX2600 Original instruction manual

Electrolux ICON RH42PC60GS Brochure & specs

Electrolux

Electrolux ICON RH42PC60GS Brochure & specs

Schweigen DBH1200S installation guide

Schweigen

Schweigen DBH1200S installation guide

AEG X99464MK2 user manual

AEG

AEG X99464MK2 user manual

ROBLIN STELLA 900 X MS manual

ROBLIN

ROBLIN STELLA 900 X MS manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.