or placed to another place.
NOTICE! If you take the boiler from
The boiler has to be connected by the nut with flat ring
†colder environment to warmer (for
sealing. example if the outside temperature is
It is necessary to connect the heating water inlet with
†below 0° C or 0° C and you want to
a filter and shut off valves. mo un t i t i ns id e), p lea se wa it
It is necessary to leave a free space on both side walls approximately 2 hours
†
of the boiler 100 mm and minimally 400 mm from the
top for after sales service. In case that you will not
1.3.3 Operation of the boiler
observe this request for free space you have to pay
dismantling and mounting the boiler back to the wall The boiler has to be controlled and used only
†
and to heating system, it is not repair paid in according to advices and instructions stated in this
guarantee period! instruction manual, only by adult person who was
posted in maintenance of the boiler. Putting the boiler
into operation will made by authorized service person
1.3.2 Putting into operation during the heating test.
Putting the boiler into operation has to be carried out
†Any manipulation, operation, using and maintenance
†
only by authorized professional company or service of the boiler, which is not in accordance with
person that has an valid agreement signed with the instructions and advices stated in this instruction
producer. The list of these companies is enclosed. manual, is inadmissible. The producer is not
The company or person who will put the boiler into
†responsible for damages caused by wrong using and
operation has an obligation to assure repairs of maintenance of the boiler.
breakdowns or defects in guarantee period. In case The producer recommends periodical service
†
that this company doesn't exist anymore, the controls of the boiler, 1x per year before heating
guarantee repair will be assured by any company from season. The service control could be done only by a
the list closed to you. professional authorized service company or person.
The list of service control steps recommend to be
By putting the boiler into operation the authorized
†controlled before heating season you will find in the
person is obligated to: chapter “maintenance”.
†control connections of the boiler to electric supply The producer allows only room thermostat
network and to heating system †
†control tightness of the boiler connection, if the room thermostat has with potential-
†control all functions of the boiler free outlet connection.The authorized service person
†inform the user about boiler operation, its control and is responsible during putting the boiler into operation
maintenance to fill and sign the guarantee card.
†inform the user about safety dimensions from sides of If you find any breakdown or any defect on an
†
the boiler from flammable walls and its protection electrical part of the boiler, please, don´t repair it by
according to ČSN 061008 and ČSN 730823. yourself , disconnect the boiler from the electric
To fulfil requests for boiler safety and economic supply network and ask for after sales service repair
†
operation it is necessary to observe below mentioned your service person.
conditions: It is not allowed to use the boiler Electric Easy for
†
†for boiler mounting and installing the user has to get another purposes than is stated in this instruction
the permission from the company who is a distributor manual.
of electricity in your region, control the input of the
boiler if it is in accordance with the input stated in the 1.3.4 Safety
permission
† the company carrying out the mounting is responsible
to observe the technical project and concrete Fire instructions:
correlative norms and regulations regarding the
mounting and installing of direct heated electric boilers Disconnect the boiler from the electric
supply network and take out it out of its
in central heating systems. operation according to possibilities.
† for mounting of the boiler it is necessary to have an Extinguish fire using pulverized or snows
authorized technical project for heating system and for extinguish appliance flammable and
connection of the electric boiler explosive materials.
† the boiler is able to be mounted only in an Don´t stock any flammable and explosive
environment according to its determination and things closed to the boiler (for example paper,
according to the project. colours, chemical etc.)
Manipulation, operation, using, control and
†maintenance of the boilers are forbidden if it is not in
accordance with rules and directions of this instruction
manual. It is forbidden mainly to disconnect any of
safety units or elements in the boiler!!!
If the guarantee list is not filling fully, it is not valid.
4