manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Basalte
  6. •
  7. Rack & Stand
  8. •
  9. Basalte Eve Air 11" User manual

Basalte Eve Air 11" User manual

5
6
4
iPad Air (4th gen.)
iPad Pro 11"
PSU
110V/230V
+v +v -v -v
wall box
for Puck
Puck
openings for
mounting the frame
vertical
mounting
horizontal
mounting
opening for speaker
magnet
opening for speaker
opening for microphone
3
1
a
2
182,50mm/7,19"
wall box
for Puck
Eve Air 11"
91,25mm/3,59"
55,80mm/2,20"
259,60mm/10,22"
b
c
100mm/3,94"
Basalte bv
Hundelgemsesteenweg 1a
9820 Merelbeke
Belgium
tel +32 9 385 78 38
info@basalte.be
www.basalte.be
Basalte is a registered trademark of Basalte bvba.
Eve is a registered trademark of Basalte bvba.
Eve mini, Eve 9.7", Eve Pro 9.7" -11" & -12.9", Eve Air 11” and
Eve touch are registered designs of Basalte bvba.
iPad mini, iPad Air, iPad, iPad Pro and iPod touch are
registered trademarks of Apple Inc.
Made in Belgium
v1.0 2021 basalte
©
Identification of the parts
a Eve Air 11” frame for iPad Pro 11” & iPad Air (4th
generation) (product number: 0676-xx)
b Custom angled USB-C to USB-A cable
Max power 5V 2A /No data transfer
c Suction cup
Positioning of the wall box (not included)
A wall box should be foreseen to install the iPad power
supply. The Puck (not included) is a USB power supply which
fits into a 1-gang wall box and uses the USB-C cable,
supplied with the iPad.
The wall box should be installed according to the
dimensions on the drawing (2).
Puck power supply (not included - product number: 610-02)
Install the Puck in the wall box following the instructions of
the Puck manual. Connect the USB-C cable, supplied with
the Eve frame to the Puck.
The maximum output power of the puck is 10W. Do not set
the iPad’s screen to permanently on, but enable auto-lock
in the iPad’s settings to allow your device to charge.
Installing the frame
Please use the correct openings of the Eve frame and
ensure the screws are positioned so that they cannot
damage the iPad.
Mounting the iPad Air / iPad Pro
1. Plug the power connector into the iPad.
Make sure the USB-C cable is connected in proper
orientation. Inserting the cable in the wrong direction can
damage the iPad once you mount it in the Eve frame.
2. Place the iPad in the opening of the frame so that it is
being held by the magnets.
Make sure that the power cable is not squeezed between
the iPad and the frame.
Removing the iPad Air / iPad Pro
1. Place the suction cup on the iPad screen and push
lightly to create suction.
2. Gently pull the iPad making sure it cannot fall.
3. Disconnect the power connector.
1
2
3
4
5
6
Dimensions Eve Air 11”
Frame: 259,60mm/10.22" x 182,5mm/7.19” x 10mm/0.39”
Eve Air 11” is compatible with:
iPad Pro 11” 2018 & 2020 model, iPad Air 2020 model (4th
generation)
air
for iPad Air 2020 (4th gen) and iPad Pro 11”
11"

Other Basalte Rack & Stand manuals

Basalte Auro Wall 0181-CC User manual

Basalte

Basalte Auro Wall 0181-CC User manual

Basalte EVE Plus Table base 0150-CC User manual

Basalte

Basalte EVE Plus Table base 0150-CC User manual

Basalte EVE Plus User manual

Basalte

Basalte EVE Plus User manual

Basalte EVE User manual

Basalte

Basalte EVE User manual

Basalte MIRO BASE 0730-02 Series User manual

Basalte

Basalte MIRO BASE 0730-02 Series User manual

Popular Rack & Stand manuals by other brands

Touchboards BALT T-LECT 85751 Assembly instructions

Touchboards

Touchboards BALT T-LECT 85751 Assembly instructions

JUKI RS-1 Maintenance Guide

JUKI

JUKI RS-1 Maintenance Guide

ACT AC8301 Quick install

ACT

ACT AC8301 Quick install

elho oslo user manual

elho

elho oslo user manual

ErGear EGCM12 instruction manual

ErGear

ErGear EGCM12 instruction manual

Sony WB-PW1 Mounting instructions

Sony

Sony WB-PW1 Mounting instructions

Gebesa REACH installation manual

Gebesa

Gebesa REACH installation manual

Wali GSMP002 installation manual

Wali

Wali GSMP002 installation manual

CHIEF MSR Series installation instructions

CHIEF

CHIEF MSR Series installation instructions

Premier WINE CELLARS Deluxe Style Assembly guide

Premier

Premier WINE CELLARS Deluxe Style Assembly guide

Craftsman 351.220200 Operator's manual

Craftsman

Craftsman 351.220200 Operator's manual

SKY-WATCHER SynScan EQ6 Pro instruction manual

SKY-WATCHER

SKY-WATCHER SynScan EQ6 Pro instruction manual

Humanscale Quickstand installation instructions

Humanscale

Humanscale Quickstand installation instructions

Admiral Staging STVLADB30 Original user manual

Admiral Staging

Admiral Staging STVLADB30 Original user manual

Novopro PS1XL instruction manual

Novopro

Novopro PS1XL instruction manual

Sony SU-557 operating instructions

Sony

Sony SU-557 operating instructions

Ballard Designs MD106 manual

Ballard Designs

Ballard Designs MD106 manual

PDi PD168-039 manual

PDi

PDi PD168-039 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.