1
Customer Service
(800) 247-7668
Zip Crank Basketball Systems
See Installation Video at www.youtube.com/bisoninc
P A R T S L I S T
Item Qty Description Item Qty Description
A1Pole (packaged separately) S61/2" Lock Washer
B1Pole Plate T61/2" Hex Nut
C2Extension Channel U45/16" x 1" Truss Head Screw
D1Backboard "H" Frame V45/16" Flat Washer
E2Pole Plate Bracket W45/16" Lock Washer
F2Extension Channel Bracket X45/16" Hex Nut
G8Pivot Bushings Y1Backboard (packaged separately)
H43/8" x 8" Hex Bolt Z1Rim and Net (packaged separately)
I43/8" Thin Lock Nut AA 1Pole Cap
J83/8" x 1" Hex Bolt BB 1Height Gauge
K83/8" Flat Washer CC 1Pointer
L83/8" Lock Washer DD 31/4" Flange Nut
M83/8" Hex Nut EE 21/4" x 1" Hex Bolt
N1Crank FF 1Crank Handle
O21/2" x 5" Hex Bolt GG TBD Quick Dry Concrete (supplied by customer)
P21/2" Thin Lock Nut HH 1Pole Installation Kit (inside the pole)
Q3Square U-Bolt II 1BA79UGP Pedestal Base (packaged separately, only on "X" systems)
R61/2" Flat Washer JJ 1Pole Padding (if applicable, packaged separately)
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Read all instructions before proceeding.
Save this instruction in the event that the manufacture must be contacted in the future for maintenance information.
Warning!
Improper installation, maintenance or use may cause product failure and serious personal injury.
1. Call your local utility locating service before digging, usually by dialing 811, to avoid serious injury and service
interruptions. Also avoid lawn sprinkler lines.
2. Determine the desired position of the pole by taking into consideration that the distance between the face of the
pole and the face of the backboard changes as the rim height is adjusted. At the top position (official 10' rim
height) this distance is approximately 30" and at the lowest point is approximately 43". See Figure 1.
3. Proceed to either 4a or 4b depending on the model you are installing.
IF YOU ARE INSTALLING A DIRECT BURY SYSTEM (BA8350, BA8350S, BA9350, BA9350S,
PR94UZC OR PR95UZC)
4a. Dig a 12" minimum diameter hole at least 36" deep. Remove additional soil from the bottom 1/3 - 1/2 of the hole
into a bell shape. In heavy frost climates a deeper footing will increase pole stability. The amount of Quick Dry
Concrete (GG) required will depend on final hole size. A 12" diameter x 36" deep hole with additional soil
removed will take approximately 3 cubic feet of concrete. Always better to have too much rather than too little on
site.
5a. Install the Pole Installation Kit (HH) around the Pole (A) using instructions provided with the Pole Installation
Kit (HH) found with the kit inside the Pole (A).
Date: 8/18/21 Rev: 10 N.J.C. File: Publisher\Inst\BA8350.pub Ref#: 920271