COLORKINETICS eW Profile Powercore gen4 User manual

Installation Instructions
INSTRUCTIONS D’INSTALLATION INSTRUCCIONES DE INSTALACIÓN
ISTRUZIONI PER L’INSTALLAZIONE INSTALLATIE-INSTRUCTIES
INSTALLATIONSANWEISUNGEN インストール手順 安装指示
A Must be installed by a qualified electrician in accordance with all
national and local electrical and construction codes and regulations.
Doit être installé par un électricien qualifié conformément aux codes et réglementa-
tions électriques nationaux et locaux du bâtiment.
La instalación debe realizarla un electricista calificado siguiendo todos los códigos y
normativas eléctricas y de construcción, tanto nacionales como locales.
Devono essere installati da un elettricista qualificato in conformità con le norme
locali e nazionali vigenti in materia di costruzioni edilizie e installazione di impianti
elettrici.
Moet door een gekwalificeerd elektricien overeenkomstig alle nationale en lokale
elektrische verordeningen worden geïnstalleerd.
Muss von einem geprüften Elektriker in Übereinstimmung mit allen nationalen und
örtlichen elektrischen Codes und Regelungen installiert werden.
国または地域の建築コードおよび規制にすべて従い、資格のある電気技師が設置してくだ
さい。
必须根据所有国家和地方的电气和施工准则及规范,由符合资格的电工进行安装
B Before installing this product, please visit the product page
at www.colorkinetics.com for the latest version of the installation
instructions. Due to continuous improvements and innovations,
installation instructions may change without notice.
Avant de procéder à l’installation de ce produit, veuillez consulter la page Web du
produit à l’adresse www.colorkinetics.com pour obtenir les instructions de montage
les plus récentes. En raison des améliorations et innovations sans cesse entreprises,
les instructions de montage peuvent être modifiées sans préavis.
Antes de instalar este producto, visite la página del producto en www.colorkinetics.
com para consultar la última versión de las instrucciones de instalación. Debido a las
continuas mejoras e innovaciones, las instrucciones de instalación pueden cambiar
sin previo aviso.
Prima di installare il prodotto, visitare la pagina relativa all’indirizzo www.colork-
inetics.com per la versione più recente delle istruzioni d’installazione. Grazie ai
miglioramenti e alle innovazioni continue, le istruzioni sono soggette a modifiche
senza preavviso.
Ga voordat u dit product installeert, eerst naar de productpagina op www.colork-
inetics.com voor de meeste recente versie van de installatie-instructies. Vanwege
voortdurende verbeteringen en innovaties kunnen de installatie-instructies zonder
bericht gewijzigd worden.
Besuchen Sie vor der Installation des Produkts bitte die Produktseite unter www.
colorkinetics.com, um die aktuellen Installationsanweisungen herunterzuladen.
Aufgrund kontinuierlicher Verbesserungen und Innovationen können die Installa-
tionsanweisungen ohne Vorankündigung geändert werden.
この製品を設置する前に、www.colorkinetics.com の製品ページにアクセスして、最新の設置
手順を確認してください。改善・改良を継続的に行っているため、取り付け手順が予告なく変
更されることがあります。
安装该产品之前,请先访问产品页面 www.colorkinetics.com 以获取最新版的安装说明。
由于在不断地改进和创新,安装说明可能会有所改动,恕不另行通知。
PUB-000246-00 (R01) 1 November 2018
eW Prole Powercore gen4
Switched Junction Box
www.colorkinetics.com

2 eW Profile Powercore gen4, Switched Junction Box Installation Instructions
Confirm all components received.
Open the Switched Junction Box by removing the
two Phillips-head screws from the back panel.
When installed, the Switched Junction Box should align flush with the front edge of a run of
luminaires. The 3-pin connector comes positioned for installing on the right end of a run. For
installations on the left end of a run, you must move the connector.
To move the connector:
Remove the end plate from its slot, and the 3-pin connector from the end plate.
Move the connector to the other slot. (Make sure that the arrow on the end plate is oriented up).
Insert the connector in the end plate, and the end plate into the slot, ensuring that the connector
clicks securely in place.
1
3
2

eW Profile Powercore gen4, Switched Junction Box Installation Instructions 3
The Switched Junction Box has three knockouts for inserting
the power line — one on the end of the housing, and one
on either side. Using a flat-blade screwdriver, remove the
knockout that you want to use.
Insert the power line through the strain relief connector,
leaving enough wire inside the box to make connections.
Tighten the Phillips-head screws on the strain relief connector.
Attach the strain relief connector to the hex nut, and tighten.
(The Phillips-head screws should be accessible when the
Switched Junction Box is installed. You may need to reposi-
tion the hex nut in its slot to properly orient the strain relief
connector screws.)
Remove the hex nut from the strain relief connector, and insert it into the slot behind the
selected knockout opening. Insert the ground connector strip into the tab to the left of the
knockout opening, so that the strip touches the hex nut.
5
7
6
4

© 2018 Signify Holding. All rights reserved. Specifications are subject to
change without notice. No representation or warranty as to the accuracy
or completeness of the information included herein is given and any
liability for any action in reliance thereon is disclaimed. All trademarks
are owned by Signify Holding or their respective owners. www.colorkinetics.com
8
9
10
Trim 3/8 in (10 mm) of insulation from the wires, and
attach wire nuts:
Package wires in the Switched Junction Box housing,
making sure not to pinch them, and replace the back
panel using the two Phillips-head screws.
Connect the Switched Junction Box to the eW Profile
Powercore luminaire at the end of the run. Use the two
mounting holes to secure the Switched Junction Box to
the mounting substrate with screws.
LN G
Line (L) Connector with black wire
Neutral (N) Connector with white wire
Ground (G) Connector with yellow/green wire