
12
that both inner and outer pipe sections are locked; when installing double wall “snap lock” chimneys, it is
important to ensure that the joint between the chimney sections is locked. Ch ck by pulling chimn y up-
ward aft r locking: th chimn y will not pull apart if it is prop rly lock d. Scr ws ar not n c ssary to k p
th chimn y tog th r. If chimn y is 30’ or high r, a support s ction provid d by th chimn y manufactur r is
r quir d aft r a straight chimn y abov th fir plac run, or abov a r turn lbow aft r a straight chimn y
run. Th support is d sign d to r li v th xtra w ight load on th fir plac and lbows wh n high chim-
n ys ar install d. S FIG 7.
CHIMNEY INSTALLATION
This installation will outlin a typical chimn y installation using 12” doubl wall air-cool d chimn y. For sp cific
installation instructions for class “A” chimn y, r f r to th chimn y manufactur rs installation manual.
WARNING: Do not install chimney smaller than the required minimum. See page 6 for chimney size requirements.
Each doubl wall chimn y s ction consists of an out r pip , flu pip and on
wir spac r. Th pip s ctions ar not pr -ass mbl d and must b ass mbl d
pi c by pi c as th chimn y is install d. Wh n starting th chimn y dir ctly
on th fir plac , th flu pip s ction must b install d first with th h mm d
nd down. Th out r pip s ction can th n b install d ov r th flu pip s c-
tion with th h mm d nd up. S FIG 6.
15” Galvanized
Outer Pipe
Hemmed
Edge
12”
Stainless
Inner Pipe
Lanced Side UP
FIG 6. chimney pipe assembly
1. Plac on lbow, without straps, into th damp r and slid th inn r pip
down to th rais d rim. Pr ss down on ach pip s ction until th lanc s
on th low r nd s cur ly ngag th knurl on th fir plac . S cur th
damp r to th inn r pip by using suppli d s lf-drilling scr ws. Th n plac
th out r pip into th start r collar and s cur with scr ws. Th wir
spac r will assur th prop r spacing b tw n th inn r and out r pip
WARNING: THE OPENINGS IN THE COLLAR AROUND THE FIREPLACE MUST NOT
BE OBSTRUCTED. NEVER USE BLOWN INSULATION TO FILL THE CHIMNEY
2. Attach th lbow with straps to th flu s ction that will b
us d to conn ct th lbows. Make sure this elbow is con-
nected to the lue section in the right direction. Attach
th s two s ctions to th lbow on th anchor plat /
damp r and start r collar. Align th top lbow to th hol
you hav alr ady cut into th c iling. Th n, s cur th
straps to th walls to hold th ass mbly in plac . Th s sup-
port straps will n d to fully support all v rtically install d
chimn y.
To achi v d sir d offs t you may install combinations of
12”, 18”, 24”, 36”, and 48” l ngths in-b tw n lbows.
3. Th r maining straight flu s ctions r quir d to r ach th
building cod approv d h ight should b attach d on at a
tim as th y ar low r d from abov and s cur d to th
lbow on th fir box. Onc th whol flu is in position,
attach th ass mbl d straight flu s ctions to th top l-
bow, th r by compl ting all flu conn ctions. Make sure
FIG 7. chimney termination
NOTE: All pip joints b tw n offs t lbows shall b s cur d with two scr ws ONLY through th outsid
pip . DO NOT p n trat th inn r pip .
Roof Flashing