
3
Verify contents received................................................2
Table of contents...........................................................3
Physical Data.................................................................4
1 - Important Information.............................................7
2 - Introduction.............................................................8
2.3 Requirements for Commonwealth of Massachusetts 8
2.4 Use of Carbon Monoxide Monitor.............................. 8
2.5 Designated Use ..................................................... 8
2.6 The unit MUST NOT: .............................................. 8
2.7 Operational Features.............................................. 8
3 - Component Listing ...................................................9
4 - Locating Boiler.......................................................15
4.1 Boiler Location Considerations..............................15
4.2 Floor Location .....................................................15
4.3 Clearances..........................................................16
5 - Combustion Air And Vent Piping.............................17
5.1 General...............................................................17
5.2 Removal of Existing Boiler From Common Vent System18
...........................................................18
5.4 Approved Venting Materials ...................................19
5.5 Vent Termination..................................................19
5.6 Coaxial Venting Instructions...................................21
5.7 Coaxial Vent Screw Placement - See Figure 5-3 .... 22
5.8 Twin Pipe Systems................................................23
5.9 Securing Twin Pipe Polypropylene Venting............ 24
5.10 (3" /80 mm Only) Flexible Vent System .......... 27
5.11 Condensate Piping ..............................................29
6 - Hydronic Piping......................................................30
6.1 General...............................................................30
6.2 Special Conditions ................................................30
6.3 Safety Relief Valve and Air Vent..............................31
6.4 Trim Piping ..........................................................31
6.5 System Piping......................................................31
......................33
6.7 Manufacturer Recommendation - Strainer ................34
6.8 Central Heating System.........................................35
6.9 Domestic Hot Water Mode......................................35
6.10 Frost Protection Mode..........................................35
6.11 Pump Protection .................................................35
7 - Gas Supply Piping ..................................................36
7.1 General...............................................................36
7.2 Gas Pipe Recommendations ...................................37
7.3 Leak Check Gas Piping ..........................................39
...................................39
8 - Electrical Connections............................................40
8.1 General...............................................................40
8.2 Install Room Thermostat .......................................40
8.3 Electrical Connections............................................40
8.4 Access To Connection Block ...................................41
8.5 Main Supply Connection.........................................41
8.6 Install Room End Switch........................................42
8.7 Optional Electrical Connections...............................42
8.8 Indirect Storage Tank............................................44
8.9 Management of 0-10V Input...................................44
9 - Start Up Procedure.................................................46
9.1 Central Heating System Connections - HEAT ONLY ...46
9.2 Central Heating System Connections - Combi ...........46
9.3 System Start Up...................................................47
9.4 Fill Condensate Trap with Water .............................47
9.5 Control Panel .......................................................48
9.6 Prior to Commissioning: ........................................49
9.7 Commissioning For The First Time: .........................49
9.8 Automatic Calibration Function ...............................49
9.9 Manual Calibration Function:..................................50
9.10 De-Aeration Function...........................................50
9.11 Commission Set Up (Gas) - Changing The Type Of Gas
...............................................................................50
9.12 Chimney Sweep Function ....................................51
9.13 Combustion Adjustment Function (CO2%).......... 51
9.14 Check Firing Rate................................................51
9.15 Parameter Settings .............................................52
9.16 Description Of Parameters: Factory Settings....... 52
9.17 Adjusting Maximum Heating Power........................54
10 - Operating instructions .........................................55
10.1 Testing For Gas Leaks And Purging The Gas Supply
...............................................................................55
10.2 Boiler Operation..................................................55
10.3 Central Heating Mode..........................................55
10.4 Domestic Hot Water Mode....................................55
10.5 Frost Protection ..................................................56
10.6 Pump ................................................................56
10.7 Low Water Pressure Sensor (Internal)............... 56
11 - General Maintenance and Cleaning.......................57
11.1 Beginning of Each Heating Season.........................57
11.2 Maintenance And Routine Servicing.......................58
11.3 Component Replacement And Cleaning .............. 58
11.4 Draining the Boiler..............................................59
11.5 Draining the Heating Circuit .................................59
11.6 Hydraulic Unit (DHW) ..........................................60
11.7 Cleaning The Cold Water Filter..............................60
11.8 Final Commissioning............................................60
11.9 Final Assembly ...................................................60
11.10 User Information...............................................61
11.11 Safety Flue Thermostat
........................................61
11.12 Flue Pressure Switch
............................................61
11.13 Replacement Parts ............................................61
12 - Ratings And Capacities.........................................62
12.1 Ratings and Capacity...........................................62
........................62
12.3 High Altitude Ratings...........................................63
12.4 High Altitude Chart..............................................63
12.5 Available Pump Head For Central Heating...............64
13 - Trouble Shooting..................................................65
13.1 Error Messages And Resetting The Boiler................65
13.2 Anomalies Table for the Installer - Use this table to
report the anomaly values...........................................67
14 - Glossary...............................................................68
Appendix A - Wiring Diagrams.....................................70
TABLE OF CONTENTS
240013375 REV A, [07/01/2021]