Dynapac VB 340V User manual

02-0508
OPERATION
&
MAINTENANCE
Screed
VB 340V
VB 340TV
Keep this manual for future reference
Order number for this manual: D900981477
270.................
275.................

VALUE
QUALITY
THE ORIGINAL
Your Authorized Dynapac Dealer:

1
VB340T(V)_GBIVZ.fm 1-4
Table of contents
V Preface .....................................................................................1
1 General safety instructions ........................................................................2
1.1 Acts, directives, accident prevention regulations .......................................2
1.2 Warning instructions ..................................................................................2
1.3 Prohibitive signs .........................................................................................4
1.4 Protective gear ...........................................................................................5
1.5 Environmental protection ...........................................................................6
1.6 Fire prevention ...........................................................................................6
1.7 Further instructions ....................................................................................7
A Correct use and application ...................................................1
B Description of the screed .......................................................1
1 Application .................................................................................................1
2 Assemblies .................................................................................................2
3 Safety .........................................................................................................4
3.1 Remaining risks at the screed ....................................................................4
4 Technical data ............................................................................................6
4.1 Dimensions ................................................................................................6
4.2 Weights ......................................................................................................6
4.3 Adjustment/equipment features .................................................................7
4.4 Compacting system ...................................................................................7
4.5 Gas heater system .....................................................................................8
4.6 Electric heater VB 340V .............................................................................9
4.7 Electric heater VB 340TV ...........................................................................9
5 Location of instruction labels and tpe plates ............................................10
5.1 Screed type plate (1) ................................................................................11
5.2 Liquefied gas system type plate (2) ......................................................12
C Transportation .........................................................................1
1 Safety regulations for transportation ..........................................................1
2 Transporting the removed screed ..............................................................2
2.1 Transportation by crane .............................................................................2
2.2 Transportation by fork-lift truck ..................................................................2

2
VB340T(V)_GBIVZ.fm 2-4
D Operation .................................................................................1
1 Notes regarding safety ...............................................................................1
2 Operation of the screed .............................................................................2
2.1 Extend/retract screed .................................................................................2
2.2 Adjusting the tamper (o) .............................................................................3
Adjusting the vibration ...........................................................................3
Tamper/vibration frequency displays (o) (6) / (7) ...................................4
3 Operation of the gas heater system with flame monitoring ........................5
3.1 Switch cabinet for screed heating system ..................................................5
3.2 Gas supply diagram ...................................................................................7
3.3 General notes on the gas heater system ...................................................8
3.4 Connection and leak test ...........................................................................9
3.5 Commissioning and checking the heating system ...................................10
Ignition process ....................................................................................10
3.6 Function of the flame monitoring system .................................................11
3.7 Setting the temperature level ...................................................................12
3.8 Switching off the heater ...........................................................................13
3.9 Exchanging the gas bottles ......................................................................13
4 Operating the electric heater ....................................................................14
4.1 Switch cabinet for screed heating system ................................................14
4.2 General information on the heating system .............................................16
4.3 Isolation monitor .......................................................................................17
Insulation faults ....................................................................................18
4.4 Commissioning and checking the heating system ...................................19
4.5 Temperature display, setting temperature level .......................................20
4.6 Operating the control and monitoring unit ................................................20
4.7 Temperature setting .................................................................................22
4.8 Fault messages ........................................................................................22
Fault codes ..........................................................................................22
4.9 Switching off the heating system .............................................................23
5 Malfunctions .............................................................................................24
5.1 Problems during paving ..........................................................................24
5.2 Malfunctions on the screed .....................................................................26

3
VB340T(V)_GBIVZ.fm 3-4
E Set-up and modification .........................................................1
1 Notes regarding safety ...............................................................................1
2 General assembly ......................................................................................2
2.1 Fitting screed to finisher .............................................................................2
2.2 Mounting the side shields ..........................................................................3
2.3 Hydraulic connections ................................................................................4
Position and designation of the connections: .......................................4
2.4 Electrical connections ................................................................................5
3 Extending the screed .................................................................................6
3.1 Removing side shields ...............................................................................6
3.2 Preparing extension parts ..........................................................................7
3.3 Removing tamper deflector plate ...............................................................7
3.4 Assembly of tamper drive shaft ..................................................................7
3.5 Fitting tamper deflector plate .....................................................................7
3.6 Fitting extension parts ................................................................................8
3.7 Fitting side shield to extension part ............................................................8
3.8 Screed heating system gas connections ...................................................9
3.9 Screed heater system electrical connections .............................................9
4 Settings ....................................................................................................10
4.1 Setting extendable parts ..........................................................................10
Basic setting: .......................................................................................10
Fine adjustment, setting during installing work: ...................................10
4.2 Setting tamper height ...............................................................................11
4.3 Setting tamper deflector plate: .................................................................11
4.4 Setting side shields ..................................................................................12
4.5 Setting crowing ........................................................................................12
4.6 Setting positioning angle ..........................................................................13
4.7 Positioning angle correction Adjustment section / central section ...........13

4
VB340T(V)_GBIVZ.fm 4-4
F Maintenance ............................................................................1
1 Notes regarding safety ...............................................................................1
2 Maintenance intervals - screed in general .................................................2
3 Maintenance intervals - gas system ...........................................................3
4 Maintenance intervals - electric heating system ........................................4
5 Lubrication points .......................................................................................5
5.1 Guide tubes ................................................................................................5
5.2 Other lubricating and maintenance points .................................................6
6 Checkpoints ...............................................................................................7
6.1 Guides of the extendable parts ..................................................................7
Adjustment of guide tube play ...............................................................7
6.2 Cleaning the screed ...................................................................................8
Emptying the tamper compartment ........................................................8
Cleaning side shield ...............................................................................9
6.3 Check / adjust tamper deflector plate ......................................................10
6.4 Hydraulic hoses ......................................................................................10
7 Gas system ..............................................................................................11
7.1 Spark plugs ..............................................................................................11
7.2 Adjusting the flame ..................................................................................12
7.3 Injectors of the gas heater system ...........................................................12
8 Electric heating system ............................................................................13
8.1 Check insulation monitoring .....................................................................13
Insulation faults ....................................................................................14
9 Lubricants ................................................................................................15
10 Electric fuses ............................................................................................16
10.1 Equipment with gas heating system ........................................................16
Fuses in the compacting element (1) control box ................................16
Fuse board (1) .....................................................................................16
11 Test certificates ........................................................................................17
11.1 Electric screed heating system ................................................................17

V 1
V_01_GB.fm
VPreface
Safe operation of the machine requires specific knowledge that is imparted by the
present operating instructions. The information is provided in a concise, clearly struc-
tured form. The individual chapters are arranged in alphabetical order and every
chapter starts with page 1. The individual pages are identified by the chapter letter
and the page number.
Example: Page B 2 is the second page of chapter B.
These operating instructions cover various machine options. Make sure that during
operation and maintenance work the description appropriate to the machine option is
used.
Safety instructions and important notes are identified by the following pictograms:
fPrecedes safety instructions that must be observed in order to prevent danger to per-
sonnel.
mPrecedes notes that must be observed to prevent damage to equipment.
APrecedes general notes and explanations.
tUsed to indicate standard equipment.
oUsed to indicate optional equipment.
In the interest of continued development, the manufacturer reserves the right to make
changes to the machine (which will not, however, change the essential features of the
type of machine described) without updating the present operating instructions at the
same time.
Dynapac GmbH
Wardenburg
Ammerländer Strasse 93
D-26203 Wardenburg / Germany
Telephone:+49 / (0)4407 / 972-0
Fax: +49 / (0)4407 / 972-228
www.dynapac.com

V 2
V_01_GB.fm
1 General safety instructions
1.1 Acts, directives, accident prevention regulations
AThe locally applicable acts, directives and accident prevention regulations shall be
observed, even if the attention is not specifically directed to these.
The operator himself shall be responsible for the observation and performance of the
related regulations and actions!
AThe following alerts, prohibitions and instructions refer to the risks to which people,
machinery and environment are exposed.
AIgnoring these instructions, bans and commands may lead to fatal injuries!
AFurthermore, the Dynapac publication "Directives for the correct and specified appli-
cation of pavers" shall also be observed.
1.2 Warning instructions
Warning pointing to hazardous place or danger!
Not observing the warning instructions may lead to injuries of life
and limb!
Warning: risk of pulling in!
mIn this area / with these equipment as a result of rotating or trans-
portation parts, there is a risk of pulling in!
Perform each operation only with equipment swicthed off!
Attention: electric voltage!
mAll maintenance and repair work on the screed's electrical system
must always be carried out by an electrician!
Attention: suspended load!
mNever stand under suspended load!
Warning: risk of squeezing!
mRisk of squeezing arises due to the operation of certain parts, use
of some functions and the movement of the machine.
Always make sure that no one stays in the areas exposed to risk!

V 3
V_01_GB.fm
Attention: risk of hand injury!
Attention: hot surfaces or hot liquids!
Warning, risk of falling off!
Attention: hazardous batteries!
Attention: materials harmful to health and irritating substances!
Attention: flammable materials!
Attention: gas bottles!

V 4
V_01_GB.fm
1.3 Prohibitive signs
It is prohibited to open / step on / reach into / perform / adjust
during operation or when the traction engine is running!
Do not start the engine/drive!
Maintenance and repair works can be carried out only with the Die-
sel engine turned off!
Do not sprinkle with water!
Do not extinguish with water!
Do-it-yourself maintenance is prohibited!
Maintenance can be performed by skilled professionals only!
AContact the Dynapac service!
Danger of fire: do not use open flame and no smoking!
Do not turn on!

V 5
V_01_GB.fm
1.4 Protective gear
AThe applicable local regulations may define the use of different protective gear!
Observe these specifications!
Protect your eyes with googles!
Wear appropriate head protection!
Protect your hearing with appropriate ear mufflers!
Protect your feet with safety footwear!
Always wear tight, conforming working coveralls!
Wear visibility vest for good visibility!
In case of polluted air, wear respiratory mask!

V 6
V_01_GB.fm
1.5 Environmental protection
AThe locally applicable acts, directives and waste disposal regulations shall be ob-
served, even if the attention is not specifically directed to these.
During cleaning, maintenance and repair operation the materials polluting water e.g.:
- lubricants (oils, grease)
- hydraulic oil
-gasoil
- coolant
- detergents
may not enter the soil or the sewer system!
Thesematerials shall be collected, stored, transported in the correct
containers until professional disposal!
Material harmful for the environment!
1.6 Fire prevention
AThe applicable local regulations may specify the mounting of appropriate fire extin-
guishers!
Observe these specifications!
Fire fighting device
(optional equipment)

V 7
V_01_GB.fm
1.7 Further instructions
mObserve the manufacturer's and other instructions!
Ae.g. the maintenance instructions of the engine manufacturer
mDescription / figure in case of an electrically heated design!
mDescription / figure in case of an electrically heated design!


A 1
A_01_GB.fm 1-2
A Correct use and application
AThe “Guidelines for the Correct Use and Application of Paver finishers” compiled by
Dynapac are included in the scope of delivery for the present machine. The guide-
lines are part of the present operating instructions and must always be heeded. Na-
tional regulations are fully applicable.
The road construction machine described in the present operating instructions is a
paver finisher that is suited for laying mixed materials, roll-down concrete or lean-
mixed concrete, track-laying ballast and unbound mineral aggregates for foundations
for paving.
This machine shall be used, operated and maintained for the purposeof the intended
work as included in the operation manual. Any other use is regardedas improper use
and can cause injury to persons or damage to the paver finisher or other equipment
or property.
Any use going beyond the range of applications described above is regarded as im-
proper use and is expressly forbidden! Especially in those cases where the paver fin-
isher is to be operated on inclines or where it is to be used for special purposes
(constructionof dumps, dams), itis absolutely necessary tocontact the manufacturer.
Duties of the user: A “user” within the meaning of the present operating instructions
is defined as any natural or legal person who either uses the paver finisher himself,
or on whose behalf it is used. In special cases (e.g. leasing or renting), the user is
considered the person who, in accordance with existing contractual agreements be-
tween the owner and the user of the paver finisher, is charged with the observation
of the operating duties.
Theusermustensure that the paverfinisheris only usedin the stipulatedmanner and
that all danger to life and limb of the operator, or third parties, is avoided. In addition
to this, it must be ensured that the relevant accident prevention regulations and other
safety-related provisions as well as the operating, servicing and maintenance guide-
lines are observed. The user must also ensure that all persons operating the equip-
ment have read and understood the present operating instructions.
Mounting of attachments: The paver finisher must only be operated in conjunction
with screeds that have been approved by the manufacturer. Mounting or installation
of any attachments that willinterfere with or supplement the functions of the paver fin-
isher is permitted only after written approval by the manufacturer has been obtained.
If necessary, the approval of local authorities has to be obtained.
Any approval obtained from local authorities does not, however, make the approval
by the manufacturer unnecessary.


B 1
B_VB340_Dyn_05.08_GB.fm. 1-12 -01.01.07
B Description of the screed
1 Application
The Dynapac VB340 screed is operated in conjunction with a paver finisher.
The screed is used for laying:
- bitumen materials,
- roll-down concrete or lean-mixed concrete,
- track-laying ballast or
- unbound mineral aggregates for foundations for paving.
AThe hydraulically extendable screed is intended for laying with variable operating
widths.
For the technical specifications of the screed, refer to the section ”Technical Data”.
VB340.wmf

B 2
B_VB340_Dyn_05.08_GB.fm. 2-12 -01.01.07
2 Assemblies
Tamper and vibration elements: The tamper knives converging in the middle area
prevent seams in the middle.
Auxiliary vibration (option) supports the compacting process, thus improving the tex-
ture.
The tamper and the vibration elements can be individually switched on and off and
controlled with regard to speed.
Continuous speed control always ensures optimum compacting results for the differ-
ent materials and layer thicknesses.
Basic screed and extendable parts: The screed parts which can be hydraulically
extended from the middle section („basic screed“) extend the working width of the
screed at the push of a button.
An expensive guide system ensures high levels of stability.
The angle and the height of the extendable parts in relation to the basic screed can
be quickly and easily readjusted.
AThese adjustments, the basic adjustments of the screed in relation to the paver fin-
isher and adjustment of the crowning are described in chapter E, „Set-up and modifi-
cation“.
Extension parts: The working width can be increased through the use of extension
parts which are very simple to install.
Side shields: The side shields serve to prevent the material from overflowing to the
outside.
- Heated side shields
- Cut-off shoes
Hinged walkway plates: During installation, the hinged walkway plates should be
folded down and snapped into place.
The walkway plates may only be folded up for a short time in special cases (e.g. ma-
terial to be laid along a wall).

B 3
B_VB340_Dyn_05.08_GB.fm. 3-12 -01.01.07
Screed heater system: Two different heater systems are available as options:
Gas heater: The propane gas flame band heater features a tried-and-tested design
and is easy to handle.
Theelectronic temperature and flamemonitoring system ensures short heating times
and constant temperatures.
Air guides to the tamper knives and side plates ensure efficient use of heat.
Electric heater: The advantages of the electric screed heater are its tried-and-tested
design, problem-free handling and maximum possible service friendliness thanks to
maintenance-free
operation.
Short heating times, constant temperatures and efficient heat utilisation are therefore
assured thanks to the various, separately monitored and controlled heating sections.
These are designed in the form of heating strips, sensibly arranged in the bottom
plates and tamper knives of each screed section.
If extension parts are fitted to the screed, only one single, easily installed plug con-
nection need be fitted to the supply and control cable leading to the neighbouring
screed component.
The heating system is monitored and controlled in the switch cabinet.
ABoth types of heater and their operation are described in the following chapters of
these operating instructions.
Symbols are assigned to the different descriptions and figures:
- Description / depiction when equipped with gas heater
- Description / depiction when equipped with electric heater

B 4
B_VB340_Dyn_05.08_GB.fm. 4-12 -01.01.07
3 Safety
fThe safety devices of the paver finisher and of the screed are described in chapter B,
section 3 of the operating instructions for the finisher.
3.1 Remaining risks at the screed
Danger of squeezing!
fAt all moving parts of the screed, there is a danger of crushing, trap-
ping or shearing.
Keep away from these parts!
Danger of being pulled in!
fA danger of catching, winding or drawing-in exists at all rotating or
circulating parts of the screed.
Keep away from these parts!
Danger of falling!
fNever jump on or off the when the machine is in motion! Only use
the access boards and steps provided!
fDanger of fire and explosions!
Work on the heater system involves the danger of fire and explo-
sion.
Do not smoke! Do not use open fires!
Danger of electric voltage
fAny failure to follow the safety precautions and safety regulations
when operating the electric screed heater (o) leads to the risk of
electric shock.
Danger to life!
All maintenance and repair work on the screed's electrical system
may be carried out by a specialist electrician only.
This manual suits for next models
1
Table of contents
Other Dynapac Power Tools manuals

Dynapac
Dynapac BG70 Installer manual

Dynapac
Dynapac DFP10D Instructions for use

Dynapac
Dynapac DRP15X User manual

Dynapac
Dynapac DFP12D User manual

Dynapac
Dynapac LH 300 Troubleshooting guide

Dynapac
Dynapac LF90 Troubleshooting guide

Dynapac
Dynapac DRP25D User manual

Dynapac
Dynapac LH800 Troubleshooting guide

Dynapac
Dynapac DRP20 User manual

Dynapac
Dynapac DFP9 User manual