STEP 1: AEM20940 Configuration
•MPPT ratio: SELMPP[0] –SELMPP[1]
•Storage Element voltages protection: CFG[2] –CFG[1] –CFG[0]
•BAL option: Select “ToCn”for dual-cells supercapcacitor and “GND” for any other
storage
•PRIM option: Connect both jumpers “NoPRIM”or remove them if a primary
battery is connected. Define the lower limit voltage on the primary battery using
R7 and R8 (2.2V by default with the jumper and 0R R7 mounted)
•100 kΩ ≤ RP ≤500 kΩ
•R7 = (𝑉𝑝𝑟𝑖𝑚_𝑚𝑖𝑛
4* RP) / 2.2 V
•R9 = RP –R7
•ZMPP resistors footprint
•LDOs Outputs Voltages: ENHV (HVOUT) –ENLV (LVOUT)
•External coldstart circuit to enable coldstart at 60mV –150 µW
STEP 2: Connect the Storage Element (and the Primary Battery)
STEP 3: Connect the Load(s) to HVOUT / LVOUT
STEP 4: Connect the Thermo-Electric Generator
•Internal Boost efficiency Vs. input voltage:
STEP 5: Check the Status
www.e-peas.com © 2020 e-peas S.A. V2.0