ErgoCentric upCentric Power & Data Rail User manual

Table of Content
Components........................................................3
Power & Data Rails ..................................................5
Leg Assembly and Rail Preperation .....................................6
Assemble the Power & Data Rail Systems ................................9
Installing Leg Divider Plates. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Wall Power Infeed ...............................................14
Ceiling Power Infeed .............................................15
Run Data Cables ................................................... 16
Finishing the Assembly .............................................. 18

Installation Guide
upCentric Power & Data Rail
3
upCentric Power & Data Rail | Installation Guide
Components
Cover plate Voice/data
plate
Voice/data
adapter kit
Prior to commencing the installation, these instructions thoroughly. Utilize the accompanying diagrams to verify that all the
necessary components for your installation were included in your order. It is advisable not to dispose of the packaging until you
are completely satised with your products functionality.
• Connecting the power feed to building power should be undertaken by a licensed electrician.
• Before connecting the unit to the building power, make sure to rst connect the power feed to the unit.
Safety Instructions/Warning
!
Data cable
support clip
Rail assembly 36” - 96”
Junction block
Receptacle 1 Receptacle 2 Receptacle 3 Receptacle 4 Clevis pin
Group A: Rail parts - found inside rail, installed on rail
Inner trough 36” - 96” Jumper cable 8” - 68”
Cover Panel Cover Panel
with window
A1 A2
B1 B2 B3 B4 C
DEFG H
IJ

Installation Guide
upCentric Power & Data Rail
4
upCentric Power & Data Rail | Installation Guide
End Leg 180° Leg 90° Leg T - Leg X - Leg Y - Leg 120° - Leg
End capLeg cap 120° End cap
Flat head
screws
Pan head
screws
Foot Triangular foot
Divider plate
Infeed leg
splitter
Divider plate 120°
Square foot
*Power feed 144”
*Jumper cable 21”
Tools required
• Power Drill
• Philips #3 Bit
• Philips #2 x 3” bits or longer
Ceiling bracket
Group B: Leg parts - found in leg packaging
*Power Feed:
72” - Used for WPI legs
144” - Used for CPI legs
Group C: CPI - Ceiling power infeed specic parts
*Power feed 72”
CPI divider wall CPI 8.5’ leg
and divider wall
*Jumper Cable:
Legs 180°, 120° and 90° - Use 1 Jumper
Legs Y and T - Use 2 Jumpers
Legs X - Use 3 Jumpers
CPI leg 180 CPI leg 90 CPI leg T CPI end leg
K1 K2 K3 K4 K5 K6 K7
L1 L2 L3 M1 M2 N
O1 O2 O3 P Q R S
TUVW
X1 X2 X3 X4

Installation Guide
upCentric Power & Data Rail
5
upCentric Power & Data Rail | Installation Guide
Power & Data Rail
upCentric Power & Data Rail is designed to optimize oorplans with a clean and tidy look by providing organized power &
data for each individual desk. upCentric Power & Data Rail eliminates the need for messy wires on the oor, reducing trip
hazards and improving workplace safety.
The Byrne 8-Trac system is employed for the Power and Data Rail, incorporating UL-recognized electrical elements. It
features fast-connect components, streamlining the installation process for speed and ease. Utilizing the hardwire power
infeed enables the connection of either 12 rails or up to 24 desks.
Note: The diagrams below are shown from the top view
Conguration - 180° Conguration - 90° Conguration - 120°
Conguration - X
Conguration - T
End legLeg - 180°End leg End leg
End leg
leg - 90°
End leg
End leg
Leg - 120°
End leg
End leg End leg
End leg
End leg End leg
End leg
T- leg
X - leg
Conguration - Y
End leg
End leg End leg
Y - leg

Installation Guide
upCentric Power & Data Rail
6
upCentric Power & Data Rail | Installation Guide
Step 1: Assemble all Connector Legs:
a) Attach foot to bottom of the leg with at head screws (Q).
b) Set aside caps (L), jumpers (N), divider plates (M), pan head screws (R),
and infeed leg splitter (P) for future use.
Square foot
End Leg
Foot 120° foot
Leg Assembly and Rail Preperation
180° Leg 90° Leg X Leg T Leg Y Leg 120° Leg

Installation Guide
upCentric Power & Data Rail
7
upCentric Power & Data Rail | Installation Guide
WPI - Wall Power Infeed
CPI - Ceiling Power Infeed
WPI - END WPI - END 90° L
WPI - TC WPI - 90°
CPI - 90° CPI - TC
CPI - 180°
Build Power Infeed Legs:
a) Wall Power Infeed (WPI) Legs:
i. Attach foot to bottom of each leg using at head screws (Q).
ii. Secure the Infeed plate using pan head screws (R).
b) Ceiling Power Infeed (CPI) Legs:
i. Attach the Foot to the bottom of each leg using at head screws (Q).
ii. Slide the plastic gasket (U) onto the four posts on top of each leg.
WPI - END 90° R WPI - 180°
CPI - END

Installation Guide
upCentric Power & Data Rail
8
upCentric Power & Data Rail | Installation Guide
Step 2: Remove Cover Panels and VGA Kits:
a) Remove the Cover Panels from all rails and set them aside. Raise the
panel from its lower edge and then pull the panel from the center until
the bottom hook disengages from the lower lip of the rail.
b) Set aside VGA addapter kit (F) and window cover (G).
B
B
STEP 1
Rail assembly
side view
* Lift panel and pull
out from the center
to release bottom
of the panel.

Installation Guide
upCentric Power & Data Rail
9
upCentric Power & Data Rail | Installation Guide
Step 3: Assemble the rst rail - “Power Infeed Rail”
a) Hook both ends of the rst rail to your power infeed leg and to the
next leg in the layout.
b) Attach rail to legs with pan head screws (R).
Note: When building a single rail system and the second leg is an
End Leg, proceed to step 7.
Assemble the Power & Data Rail Systems
Note: If building a multi beam system,
refer to your oorplan layout, and
identify the power infeed rail.
WPI
or
CPI

Installation Guide
upCentric Power & Data Rail
10
upCentric Power & Data Rail | Installation Guide
Conguration T Conguration X
Conguration 180°
Step 4: Installing the next Rail
Install the subsequent rails and legs according to the layout,
repeating the steps outlined in Step 3. Continue this process until
you have completed the entire layout.
Conguration 90° Conguration Y

Installation Guide
upCentric Power & Data Rail
11
upCentric Power & Data Rail | Installation Guide
Step 5: Install Jumpers to interconnect all rails:
a. Begin with the First Rail and install a Jumper between the rst
and second rail. Run the Jumper through the connector leg,
and attach each end to the nearest Junction Block (D).
b. Repeat this process until every rail in the system is connected
to the Power Infeed Rail.
A
DETAIL A
SCALE 1 : 1
NOTE: To facilitate the process of
connecting multiple jumpers in a
connector leg, the cable troughs above
the power jumpers can be unpinned to
create additional space.

Installation Guide
upCentric Power & Data Rail
12
upCentric Power & Data Rail | Installation Guide
accommodates two
jumper cable connections
Accommodates two
jumper cable connections
4 - way routing
3-way routing
Jumper
cables
Power
feed Jumper
cables Power
feed
When 3-way routing (T leg or Y
leg), use two jumpers.
When 4-way routing ( X leg),
use three jumpers.
Note: Connect jumpers as shown above.
Do not cross Jumpers.

Installation Guide
upCentric Power & Data Rail
13
upCentric Power & Data Rail | Installation Guide
Step 6: Install Leg Divider Plates:
Place the leg divider plates into all connector legs, ensuring that the tabs
rest on top of the Data Cable Troughs in the rails, eectively covering all
Power Jumpers.
This plate can
also be used for :
180 leg, 90 leg,
X leg and T leg
This plate can
also be used for :
Y leg only
↓↓
↓
↓

Installation Guide
upCentric Power & Data Rail
14
upCentric Power & Data Rail | Installation Guide
Step 7: Connect and test the system:
Note: Power Infeed Cable must be installed before performing this step.
Power Infeeds must be installed by a licensed electrician. Please see Power
Infeed Electrical Installation guide for details.
Wall Power Infeed:
a) Route the Power Infeed Cable into the system through the lower opening
on the Infeed plate and connect it to the rst power block.
b) Test all Duplexes to ensure proper connectivity and functionality.

Installation Guide
upCentric Power & Data Rail
15
upCentric Power & Data Rail | Installation Guide
i. Position the ceiling pole on top of the CPI leg, inserting the four posts into
the corresponding holes at the bottom.
ii. Secure the pole to the ceiling using the Ceiling bracket (T). Attach ceiling
bracket to T-frame ceiling directly above power leg. Use velcro strap to hold
power pole in place.
Note: Keep the Velcro strap slightly loose to allow for lifting.
iii. Route the power cable into the top of the pole and run it through to the end,
where it enters the First Rail and connects to the power block.
Note: It may be necessary to lift the ceiling pole o the leg to access the wire
and properly run it into the system.
J
K
STEP 7.E
STEP 7.E
Ceiling
b. Ceiling Power Infeed:
i
iii
ii

Installation Guide
upCentric Power & Data Rail
16
upCentric Power & Data Rail | Installation Guide
Step 8: Run Data Cable into the Rail System
(Skip to step 9 if data cables are not used with the rail)
a) Wall Power Infeed Legs:
i. Feed the Ethernet Cables into the system through the upper
opening on the Infeed plate.
ii. Run the cables through the upper channel in the Power & Data Rail system,
ensuring that the Ethernet endings reach their intended locations (refer to layout
for larger systems). Leave approximately 6”-12” of slack for each cable.
iii. Utilize wire the Data Cable Support Clip (E) to secure the wires to the top of the
upper channel as you run them through the system, ensuring they remain in place.
Run Data Cables

Installation Guide
upCentric Power & Data Rail
17
upCentric Power & Data Rail | Installation Guide
b. CPI Legs:
i. Feed the Ethernet cables down the Ceiling pole, using the channel
opposite the power cable.
ii. Pull the cables down through the pole and into the First Rail and
through entire system
iii. Run the cables through the upper channel in the Power & Data Rail system,
ensuring that the Ethernet endings reach their intended locations (refer to layout
for larger systems). Leave approximately 6”-12” of slack for each cable.
iv. Utilize wire the Data Cable Support Clip (E) to secure the wires to the top of the upper
channel as you run them through the system, ensuring they remain in place.
Note: It may be necessary to loosen the power pole ceiling bracket and lift the ceiling pole o the
leg to facilitate the pulling of all Data cables.
CC
B
DETAIL B
SCALE 1 : 2
Data Channel
Power Channel
CC
B
DETAIL B
SCALE 1 : 2
Data Channel
Power Channel
Data channel
CC
B
DETAIL B
SCALE 1 : 2
Data Channel
Power Channel
Power channel

Installation Guide
upCentric Power & Data Rail
18
upCentric Power & Data Rail | Installation Guide
Step 9: Install Cover Panels
a) Run wires through openings in the Voice/Data Plate (H) in the cover panel, then reinstall the cover panel.
b) Use adaptors from VGA adaptor Kits (F) to t ethernet cable ends into the Voice/Data Plate.
c) Cover all unused data port windows with solid window covers from VGA kits
Step 10: Installing Leg Caps:
Install the leg caps to provide a nished appearance and protection to the leg ends.
Leg caps
Finishing the Assembly

ergoCentric®and upCentric®is a registered trademark of ergoCentric Inc.
ph: 1 866 GET ERGO (438-3746) | 905 696-6800
fx: 1 800 848-5190 | 905 696-0899
service@ergocentric.com
ergocentric.com
ergoCentric®
Table of contents
Other ErgoCentric Rack & Stand manuals
Popular Rack & Stand manuals by other brands

Vivo
Vivo STAND-V003 instruction manual

IDEAL
IDEAL DN50 Installation

Rockwell
Rockwell RK9034 User safety and operating instructions

Philips
Philips BM05911 installation guide

Kettler
Kettler 0306033 Assembly & operating instructions

New Star Computer Products
New Star Computer Products FPMA-LIFT100 instruction manual