
SHT. NO. PART NO. REV
2 OF 27 601756161 F
DATE
5/10/2023
Installation and Assembly Instructions,
Operators Manual, and Maintenance Manual
Ceiling Suspended Volleyball System
Table of Contents
Section Page No.
Introduction 2
Tools Required 3
Parts Checklist 4-6
Installation and Setup 6-13
Referee Stand Pad Installation 14-15
Net Installation Detail 16-19
Electrical & Wiring Information 20-22
Operating Instructions 23-24
Maintenance 25-27
Introduction
Thank you for your purchase of a Skymaster®Volleyball System. To ensure that our
equipment will provide years of use to you, we are including this installation, operation, and
maintenance guide. This guide will provide information on the proper assembly and installation
methods, operating procedures, and preventative maintenance of your ceiling suspended
volleyball system.
Please note that a Bill of Materials is being included with this guide. Please check that all of the
parts called out on the Bill of Materials are present prior to beginning assembly and setup.
Please do not substitute for factory parts. Please contact the manufacturer's customer service
department and allow them to determine if substitute parts are acceptable.
It is recommended that an individual who has been properly trained perform assembly and set
up of the volleyball system. No one under the age of 18 should attempt assembly or set up of
the unit, unless properly supervised.
To prevent normal wear and tear from shortening the life of the unit, preventative maintenance
inspections and repairs should be performed at least once per year. If the units are subject to
high or unusual usage, inspections should be scheduled to occur more frequently. If items are
found to be nonconforming, replacements can be ordered from the manufacturer or one of its
authorized dealers. When contacting the manufacturer or dealer, please have information
regarding the dealer/installer who sold the unit, the name of the project, and any applicable
warranty information.
Before proceeding with assembly, read all instructions and assembly procedures. Make sure
all parts have been received and are not damaged.