11 4000123944-2
3 Heating System Design
•The 30ciplus isforusewithsealedcentralheatingsystems.
•Heating surfaces may consistof radiators, convectors orfan
assisted convectors.
•The safety valvesareanintegralpart of theboilerandcannot
be adjusted.
• The circulation pump is integral with the boiler.
• Pipe sectional areas shall be determined in accordance with
normal practices, using the output/pressure curve
(diagram 3.1). The distribution system shall be calculated in
accordancewiththeoutputrequirementsoftheactualsystem,
notthemaximumoutputoftheboiler.However,provisionshall
be made to ensure sufficient flow so that the temperature
difference between the flow and return pipes be less than or
equal to 20°C. The minimum flow is shown in Table 1.
The system can be fitted with a lockable balancing valve if
necessary in the main flow or return pipes shown as valve 'A'
in diagram 3.2.
• The piping system shall be routed so as to avoid any air
pockets and facilitate permanent venting of the installation.
Bleed fittings must be provided at every high point of the
system and on all radiators.
• The total volume of water permitted for the heating system
depends, amongst other things, on the static head in the cold
condition.Theexpansionvesselontheboilerispressurisedat
0.5 bar and allows a maximum system volume of 156 litres for
an average temperature of 75°C and a maximum service
pressure of 3 bar. This pressure setting can be modified at
commissioning stage if the static head differs. An additional
expansion vessel can be fitted to the system if required, see
diagram 3.2.
•Provisionshallbemadeforadrainvalveatthelowestpointof
the system.
•Wherethermostaticradiatorvalvesarefitted,notallradiators
must be fitted with this type of valve, and in particular, where
a room thermostat is installed.
•Inthecaseofanexistinginstallation,itisESSENTIALthatthe
system is thoroughly flushed prior to installing the new boiler,
UsingaproprietaryproductsuchasFernoxorSentinel. Contact
theproduct manufacturers forspecificdetails.
2 General Information
IMPORTANTNOTICE.
Where no British Standards exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.
Refer to Manual Handling Operations, 1992 regulations.
Theinstallationofthisboilermustbecarriedoutbyacompetent
person in accordance with the rules in force in the countries of
destination.
Manufacturer’s instructions must not be taken as overriding
statutory requirements.
2.1 Sheet Metal Parts
WARNING: When installing the appliance, care should be
taken to avoid any possibility of personal injury when handling
sheet metal parts.
2.2 Statutory Requirements
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.
In GB the installation of the boiler MUST be carried out by a
competent person as discribed in the following regulations:
Manufacturer’s instructions, supplied.
The Gas Safety (Installation and Use) Regulations.
The appropriate Building Regulations, either The Building
Regulations,The Building Regulations (Scotland), Thebuilding
Regulations (Nothern Ireland).
The Water Fittings Regulations or Water Bylaws in Scotland.
The Health and Safety at Work Act, Control of Substances
Hazardous to Health (COSHH).
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
InI.E the installationmustbe carried outbya competent person
and installed in accordance with the current edition of I.S. 813
"Domestic Gas Installations", the current Building Regulations
and reference should be made to the current ETCI rules for
electrical installation.
In GB the following Codes of Practice apply:
BS4814,BS5440Part1and2,BS5449,BS5546Part1,BS6700,
BS6798, BS6891 and BS7074 Part 1 and 2, BS7478, BS7593,
BS7671.
In IE: I.S.813, BS5546, BS5449, BS7074, BS7593.
Manufacturer’s notes must not be taken as overriding statutory
requirements.
BSI Certification
This boiler certificated to the current issue of EN 483 for
performance and safety.
It is important that no alteration is made to the boiler, without
permission, in writing, from Hepworth Heating Ltd.
Any alteration that is not approved by Hepworth Heating Ltd.,
couldinvalidatethewarrantyandcouldalsoinfringethecurrent
issue of the Statutory Requirements.
2.3 Gas Supply
The gas installation must be in accordance with the relevant
standards.
In GB this is BS 6891.
In IE this is the current edition of I.S.813 "Domestic gas
installation".
The supply from the governed meter must be of adequate size
toprovideasteadyinlet working pressure of 20mbar (8in wg) at
the boiler.
ImportantNotice
If your boiler has been converted to use L.P.G. Propane the
following note applies:
Propane cylinders are under pressure and should never be
stored or used indoors residentially.
They should only be kept outside.
Under no circumstances should L.P.G. Propane cylinders be
fitted or stored in basement areas or boiler houses.
Oncompletion,testthe gas installation for soundness using the
pressuredropmethodand suitableleak detectionfluid,purgein
accordance with the above standard.