IMI PNEUMATEX Pleno Connect PI 9 Instruction sheet

SAFETY – INSPECTION – DISASSEMBLING – DISPOSAL prescriptions
Compresso
Transfero
Vento
Pleno
Rell
SAFETY – INSPECTION
•••••Personnel
Installing and operating personnel must possess the appropriate knowledge and training.
•••••Follow the instructions
Installation, operation, maintenance and disassembly must be carried out as stated and showed in the dierent instruction
manualsmaking integral part of the delivery and in accordance with best practice. In addition to the IMI Hydronic Engineering
instructions, additional instructions from other companies may be included for the components used (e.g. backow preventers)
.
Youmust follow these instructions in the same way as the IMI Hydronic Engineering instructions.
Ifanything is unclear, please contact IMI Hydronic Engineering customer service.
•••••Testsfor commissioning and periodic inspections
Testrequired for commissioning and periodic inspections must be performed according to the regulations in the country
where the device is installed and operated. There are no unied international regulations for the acceptance test prior to
commissioning and periodic inspections. It is usually the vessels that determine how the installation is classied.
These are CE type-tested in accordance with guideline PED/2014/68/EU for pressurised equipments. Forperiodic
inspections, openings are provided for ange-type or endoscope inspections.
•In Switzerland, Compresso does not require autorisation from the SVTI if the installation is protected in such a way that
psCH is not exceeded. Vesselswith psv x V up to 3000 bar*litres do not require inspection by the SVTI.
Following combinations withTecBox are recommended:
Primary vessel (2) TecBoxsafety valve (SV)
C 10 C15
≤ 1000 litres 3 bar on request
≤ 800 litres 3.75 bar on request
≤ 700 litres 4.2 bar on request
≤ 600 litres 5 bar on request
≤ 500 litres 6 bar 6 bar
≤ 300 litres – 10 bar
•ForTransfero as many extension vessels as required can be connected to the primary vessel. The CE-approved 2 bar
safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these
types of vessels.
•Backow preventer BA: Perform inspection and maintenance in accordance with EN 1717 and the rules in the operator’s
country. Functional testing, with documentation, must normally be carried out annually. Dirt trap (SF): Inspect and clean if
necessary after a drop in the water make-up capacity or before functional testing of the backow preventer BA. We recommend
including the Pleno P / P R / P CR / BA4R in the maintenance cycle of the connected pressure-maintaining or degassing station.
Follow the maintenance instructions for Rell softening modules. The Pleno P / P R / P CR / BA4R can work as an accessory in
systems requiring technical inspections (Compresso | Transfero) and can be included as part of the inspection.
•••••Place of installation
The access to the place of installation must be restricted to trained and specialised personnel. The oor statics must be able
to support the maximum operating and installation conditions. Connections for electricity,communication, main water and
waste water must correspond to the requirements of the device.The room must be thouroughly ventilated. Do not store
ammable, explosive materials near the pressure vessel. Pressurized containers (eg Compresso expansion vessels) must
be protected against external re, at least according to national regulations.
•••••Waterquality
IMI Hydronic Engineering devices are designed to maintain pressure, to degass or to make-up and/or treat water in closed
heating, solar and cooling systems with water that contains no aggressive or toxic agents.The entire system must be
dimensioned and operated in such a way as to minimise the amount of oxygen admitted through the make-up water or
through permeable components. Water treatment systems are to be dimensioned, installed and operated according to the
current state of the art.
•••• Electrical connection
The electrical and the communication wiring and connections should be carried out by a qualied electrician, in accordance
with current local regulations.The devices and the potential free outputs must be disconnected from the electrical supply
before working on electrical components.
Protection on the supply to be done by the contractor:
Compresso C2.1, C10.1; C10.2; C15; CX: 10 A
Compresso C15.2: 16 A
Transfero range 4, 6, 8, 10, 14 = 1 x 230 V: T.1: 10 A
T.2: 16 A
Transfero 19, 25 = 3 x 400 V: 10 A
Vento range 2, 4, 6, 8, 10, 14 = 1 x 230V: 10 A
Vento range 19, 25 = 3 x 400 V: 10 A
Pleno PI9.1; PI6.1; PIX: 10 A
Pleno PI9.2; PI6.2: 16 A
Pleno P BA4R: not applicable
Residual current device (RCD) following local regulation.
If installed in residential building we recommend a commercially available line lter to the junction box.
WXMOIN00001
07.2019
en
de
fr
nl
12060000365
07.2019
Pleno Connect
PI 9, PI 9F
INSTALL
www.imi-hydronic.com

2
( ~1200 )
460
Ø
12
60
70
Ø
8,5
Ø
18
460
1
2
80
Accessory
Kit
4
1
2
3
1
2
3
PI 9.1 F

3
1
2
3
4
5
1
2
PI 9.1 / PI 9.2

4
≥400
+5°C - +40°C
1x230V
≥400
DF
≥ 2 cm/m
Sof
DF
Sof
≥600
+5°C - +40°C
1x230V
≥400 ≥ 2 cm/m
DF
Sof
PI 9.1 F
PI 9.1 / PI 9.2

5
PI 9.1 F
Swm
P1
Pleno Refill
Sout
Pleno PI 9.1F
PT
SYS
LS
SFwm
SoutSin
Sofs
Sof
Sin
Swm
Sout
Swm Sout
dpu min bar 1 0,0
dpu max bar 9,0 8,0
Ts min °C 0 0
Ts max °C 30 30
Optional
Sof

6
Sout
Optional
Swm
P2
P1 SoutSin
Pleno P AB5R
Sout
Pleno PI .1.2
PT
SYS
PI .2
LS
SFwm Sofs
Sof
Pleno Refill
External
Tank
LS
EN 1717
Sin
Swm
Swm Sout
dpu min bar 1 0,0
dpu max bar 9,0 8,0
Swm Sout
Ts min °C 0 0
Ts max °C 30 30
Swm
Sout
Pleno PI 9.1 + Pleno P AB5R
PI 9.1 / PI 9.2
Pleno PI 9.2 + Pleno P AB5R
**
Sof Sof
* optional
Pleno P AB5R

7
Pleno PI 9.1 F
+
Pleno Rell
tr > 0 °C
Pleno PI 9.1 / 9.2
+
ext. tank
DNe
DN DNet
L max 5 m 20 20
L max 20 m 25 25
L max 30 m 32 32
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
Zeparo G Force
Sout
pw 1 - 9 bar
tw 5 - 30 °C
Pleno
PI 9.1 F
TecBox
Statico
Compresso
Transfero
Swm
DN
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
Zeparo G Force
Statico
Compresso
Transfero
Pleno
PI 9.1 / 9.2
TecBox
external tank
(option for AB5)
DN
Sout
DNet LS

8
230V/50 Hz
PI.1: 10A / 3 x 1,0 mm²
PI.2: 16A / 3 x 1,5 mm²
5
1 2
LPE
N
LPE
N
34
6
1!
BrainCube
Connect!
#1-5
www.imi-hydronic.com

9
Pleno PI 9.1 (F) / PI 9.2
230V/50 Hz

10
Pleno PI 9.1 (F) / PI 9.2
24V

11
P
umpe 1 Sicherung F20
0
1
0 AT / T
y
p: 5
x
20
q
NPN
S
HIEL
D
S
HIEL
D
R
S 485
US
B
RS
458
L
AN
/
E
t
he
rn
e
t
A B
S
A‘ B‘
S
IN OU
T
Jumper (RS485)
o
ff
=
Off
en
/
stationne‘
/
ope
n
on =
G
esteckt
/
branche‘
/
connect
G
ND
IN
G
ND
IN
G
ND
+
I
N
A B
S
A‘ B‘
S
ID6 ID5 IDA3
q
NP
N
S
HIEL
D
S
HIEL
D
RS
485
ID6 ID5 IDA3
US
B
RS458
LAN
/
E
t
he
rn
e
t
A B
S
A‘ B‘
S
IN OU
T
Jumper (RS485)
off = Offen / stationne‘ / o
p
en
on = Gesteckt / branche‘ / connect
GND
IN
GND
IN
G
ND
+
IN
A B
S
A‘ B‘
S
M
1
~
LINE P/C1 V
1
V
3
V
4
WM V2 P
/C
2OD1OD2
O
D3 OD
4
L
N
PE
L
N
PE
L
N
PE
13 14 13 14 13 14
Klemmen Aus
f
ührung
C
V
ersion des bornes
C
T
e
rmin
a
l
e
x
ecu
ti
o
n
C
230
V 5
0
Hz
F2
0
1
S
icherung
/
f
usible
/
f
use
1
0 A
/
250V
/
5x20
Pleno PI Connect
Pleno PI
Connect
Pleno PI
Connect
Compresso
Compresso
Compresso
Connect

12
www.imi-hydronic.com
We reserve the right to introduce technical alterations without prior notice.
This manual suits for next models
1
Popular Water System manuals by other brands

Crystal Quest
Crystal Quest Water Cooler Installation and maintenance information

Hilti
Hilti DD-REC1 operating instructions

Beko
Beko QWIK-PURE 15 Installation and operation manual

Thetford
Thetford Tecma Sanisplit NK Operation & installation manual

North Solar
North Solar NS-200WB operating manual

Aqualife
Aqualife ROYAL SODA instruction manual