Maidaid Halcyon Barista Compact User manual

Barista Compact
Installation and user manual
Maidaid Barista Compact Installation and user manual V1.0
Espresso coffee machine

5
6
Installation
Overview
1
4
7
Cold
Water
(15mm)
Waste
PowerPower
Power
(2nd Position
Switch or plug)
9
10
11
23
8
300mm
11
Please ensure a gap of 300mm is maintained
above the top tray of the machine to allow for
cup storage and service access.
1
Coee Machine.
2
Grinder – 13 amp socket required.
3
Power connection for coee machine
(must be within 1 metre). Switch or plug.
4
1.5” (Minimum Diameter) Stand pipe for
waste as for washing machine.
5
¾'' B.S.P Washing machine type valve
for mains cold water with isolator handle.
7
Counter.
8
Under counter or under grinder
Knock-out drawer.
6
if required.
9
Hole in counter: 2'' Diameter.
10
Alternative position for power supply
(must be within 1 metre). Switch or plug.

Preparing for
Installation
Services and equipment required for installation
A
available. All services must be in place prior to installation. ALL CALLS TO UNPREPARED
SITES MAYBE FULLY CHARGEABLE.
Mains water:
15mm mains cold water supply with ¾'' BSP standard washing machine stop cock.
Note: Min inlet water pressure is : 100kPa (1 Bar)
Max inlet water pressure is : 600kPa (6 Bar)
and set between the above parameters, normally 300kPa (3 Bar).
Mains waste:
Water and waste connections to be directly beneath the location of the machine
Power supply: As below
Note: Socket to be located on the same side of the coee machine that the grinder will
stand. (Recommended right hand side - see installation overview).
Grinders - All models 13amp
Coee Machines - Standard Power Ratings
Note:
Note: The appliance must be installed in a location where the ambient temperature is
always between 5°C and 30°C.
2 Group 2.85kw 13amp single phase
Group kw amp
Warning: The power supply and method of connection must comply with any national rules
or regulations which may be present in the country in which the appliance is installed. It is
connection BEFORE the appliance is installed.
Warning: Installation of this appliance must only be carried out by trained persons
1

Preparingthearea forinstallation
B
(1) Depth from the back of the machine to the hole.
(2) Length from the side of the machine to the hole.
(3) Hole in counter:2'' Diameter
Work out the location of the coee machine on the bar or counter and nd the position.
Drill a 2’’hole using the measurements below as a guide.All the coee machines power
and waste connections feed from the bottom at the centre of the coee machine.These
connections then feed down through the 2’’hole in the bar or counter.
Note: The power connections for the coee machine and grinder must be within 1 metre
behind or beneath the machine.The power point and method of isolation must be easily
accessible at all times.
The water and waste connections for the coee machine must be directly beneath it.
All services, including hole in bar counter, must be in place prior to engineer arriving to install
the coee machine.
Ensure that the surface the coee machine is to be placed on is suciently strong and stable
enough to carry the weight of the coee machine.
Plan view for drilling counter for Coee Machine Area for Grinder
110mm
300mm 450mm
240mm
Note: The appliance must be installed in a location where it can be over seen by trained
personnel and its use and maintenance is restricted to trained personnel.
(1)
(2)
(3)
Note: Remove all packaging before working on / installing the machine and remove plastic
any glue is left on use a solvent like WD40 to remove it – DO NOT use abrasives to remove
1) Remove the top tray of the machine by locating and unscrewing the two M4 screws at
2)
for quick and easy access.
3) Remove the drip tray to reveal the waste funnel. This is done by lifting it upwards at the
front as it simply rests in place again for easy access and cleaning.
Preparing the machine for installation
E
2
3
1
2

Installing the
coffee machine
Connecting the waste pipe
1)
of the machine and tighten with the wormdrive clip provided. 2) Then feed the waste hose
under the machine and down through the 2” hole already cut out. Pull taught and ensure no
kinks are present in pipe.
3) Place the waste pipe into a bucket below the machine or into the stand pipe with a ‘P’ or
‘S’ trap to prevent smell. Ensure waste pipe is cut to length and is only 75mm into the
the machine. Clip or cable tie the pipe into position to prevent it from moving.
1
2
3
75mm
3

1)
the water hose under the machine and down through the 2” hole already cut out. 2) Connect
this to a washing machine tap (Cold water supply) with ¾'' BSP male thread or to the water
debris entering the machine.
Note: It is highly recommended that the new hose sets supplied with the coee machine are
used. Old hose sets should not be re-used.
Warning:
(Approx. 25L) buckets or until the water runs clear.
male thread and connect to the inlet side of the water softener. 1) This is indicated on the
top label of the water softener. Ensure the water pressure does not exceed 6 BAR. If it is
supply and check for leaks.
Connecting thewater Softener (ifrequired)
C
2
1
1
Connectingthewatersupply
B
4

1) Run the mains cable through the hole in the bottom of the machine or underneath to the
nearest power supply. Make sure your mains supply is within 1 metre of the machine and
has easy access for power isolation.
Connecting the power supply
D
2) Connect the machine cable to a double pole isolator mains supply or 13 amp plug. The
power supply will depend on the size of the machine and the rating plate. The use of
commando plugs is good for ease of total isolation.
Brown = live
Blue = neutral
Green -Yellow = earth
Single phase 13amp
1
2
1) Remove the RED plastic clip from the air release valve on top of the sight glass. Failure to
do so will cause air locks and milk to be sucked back into the boiler.
2) Slide the red clip out from under the E-clip. Do not remove the E-clip as this is needed
for the machine to function correctly and will cause the air release valve to come apart
if removed.
Before turning
the machine on
Remove the red air release valve clip.
A
2
1
5

Manually filling the machine
B
1)
valve situated inside the left hand side panel (looking at the machine from the
operators side). It is a chrome valve with a black lever.
2)
1
Water
Boiler
Cold water by-pass valve
2
6

3) Ensure the water is turned on then move the lever to the vertical position to
5)
Once the correct water level has been reached close the water by-pass valve by
turning to the horizontal position again.
4) Locate the sight glass on the front of the machine on the left hand side as illustrated.
Water
Boiler
Cold water by-pass valve
3
5
Full
Empty
4
7

Warning: To avoid serious damage to the elements or pump never turn on power
before the water level has been reached in the sight glass .
3)
The level when full should show between the empty and full marks as indicated above.
3
Full
Empty
1) Switch the machine on. 2) Open the steam valve to allow the air to vent. An air release
create a false pressure.
Turning the machine on for the first time
8

Adjustingthepumppressure
C
The heat exchanger, mains water pressure, coee brew pressure and expanded pressure is
shown on the left hand scale of the pressure gauge 2.
1) The steam pressure is shown on the right hand side gauge and should be about 1 BAR
when the coee machine is hot and up to pressure.
2) The pump pressure on the left hand side gauge should be 9 BAR when the pump is in
operation i.e:- when making coee.
Warning: When the coee machine is up to pressure at 1 BAR it is imperative that the
steam tube(s) are opened and vented to ensure a true steam pressure and prevent milk
being sucked into the boiler.
1)
1
2
1
Coee Machine
PressureGauge
B
3) To adjust the pressure of the coee machine locate the pressure adjusting screw on the
side of the high pressure pump head, on LPG machines this is located on the external
pump.
4) Slacken the lock nut using a 14mm spanner.
5) Turn the adjusting screw to adjust the pressure as required.
Anticlockwise to reduce the pressure.
Clockwise to increase the pressure.
6) When the pressure is at 9 BAR WHILST THE PUMP IS IN OPERATION , tighten the
lock-nut.
4
5
+
-
2) To adjust the pressure of the coee machine locate the pressure adjusting screw on the
side of the high pressure pump head which is located at the back of the machine.
access is via a hole in the base panel.,tip the machine up at the
front to adjust.
2
9

Turning the machine on
10

Loading the filter holder and making coffee
11

Semi-auto
Electronic/Auto
Electronic programming coffee measures
12

13

Steaming and Frothing
14

?????
15

16

Backwashcleaningprocedurewith andwithoutdetergent
17

Turning the machine on
2
18
Table of contents
Popular Coffee Maker manuals by other brands

Bunn
Bunn LCA-1 Installation & operating guide

Chris Coffee Service
Chris Coffee Service Silvano owner's manual

Black & Decker
Black & Decker BLACK DECKER HOME DE790 Use and care book

Saeco
Saeco Vienna Plus Sup 018M operating instructions

INCAPTO
INCAPTO BXCO1470E Instructions for use

Bosch
Bosch TASSIMO finesse TAS16B Series user manual