
Assembly instructions: Metal Point Plus Workstation
shelvingdirect.com - Tel. 1-800-500-9141
Structure assembly
2
Next, assemble the side beams(B1)
starting with the lower level. Use
a nylon mallet to tap the side
beams (B1) into place on the posts,
(A1,A2).
Before doing so, make sure the side
beam (B) is set at a 90O angle to the
post (A1, A2).
5
Cross beams (D)
Post (A1)
Side beams (B1)
Post (A2)
Cross
beams (D)
Panel (C1)
Center support (H)
1
First, place the
plastic foot
covers(E) at the
bottom of the posts
(A1,A2) and, then,
the caps(F) at the
top.
Post (A)
Plastic foot cover (E)
Cap (F)
90º
21
Side beams (B)
Post (A)
2
3
Then, insert the lower level
cross beams (D), one in front
and one behind, joining the
two sides of the workstation.
After that, insert the upper
level rails. (D).
4
Place center supports (H) to
reinforce the workstation.
1
Cap (F)
Finally, arrange the panels
(C1) starting with the
lowest level. Rest them on
the cross beams (D) and fit
them with the caps (F).