Miracle LIB-136 User manual

D HANDRAIL
Item
Description Qty
Specifications
1
D Handrail
1
2
M10 Flat Washer
2
Materials:
3
M10x25mm Torx Bolt
2
olour: Optional
Finish: Powdercoat
Fasteners:
Stainless Steel
Application:
Hand hold for deck entry or exit equipment.
Available in 0.6M, 0.9M, 1. M, 1.5M and 1.8M heights.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary, 1
week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1. Refer to drawings for location of D Handrail.
2. Position D Handrail and fix to upright with Torx
Bolts with Flat washers under bolt head.
3. Ensure bolts are tightened prior to use.
Note:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
Age roups:
STRU TURE: ____________________
DATE: ___________
MIRA LE: ______________________ DATE: ___________
Doc No.
A
-
39

ARCH BRIDGE
with INFILL HANDRAILS
Item
Description Qty
Specifications
Loose Items
1
Bridge Infill Handrail
0
2
Materials:
2
Assembled Arch Bridge
M10x2 mm Torx Bolt
12
6
M10 Flat Washer
12
Colour: Optional
Assemb
led
Arched
Bridge
Finish: Powdercoat
2
Bridge Frame
01
3
Arch Bridge End Board 60x3 x870mm
01
4
Arch Bridge Board 120x3 x870mm
16
7
10
-
16x4 mm Wing Tek Screw (Fitted)
66
Fasteners:
Stainless Steel
A lication:
Walkway transition between decks of same height.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1. Locate the Bridge on the layout plan.
2. Fit the Handrails (1) to determine the position of the
Posts and fit the Decks at each end of the Bridge.
(Refer: Detail A)
3. Fit the Bridge Frame (2) and Timbers (3, 4), already
assembled (with the frame on the underside of the
Bridge), to the Nutserts in the Upright using the
M10x2 mm Torx Bolts (5) & M10 Flat Washers (6)
under the bolt heads. (Refer: Detail A)
4. Ensure Posts are plumb with Decks at correct level and
tighten all Bolts.
Note:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 00mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
Age Grou s:
3-7 Years
7-1 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No. B-21

TRI STEERING WHEEL PANEL
Item
Description Qty
Specifications
1
Tri
Safety Panel,
or
Tri
Pirate Lookout Panel,
or
1
1
Tri
Steering Wheel Panel
1
Materials:
2
M10x25 Torx Bolt
4
3
M10 Flat Washer
4
Colour: Optional
P
irate’s Lookout Panel:
4
Universal Telescope (Fitted)
1
Finish: Powdercoat
5
3/8” Nyloc Nut (Fitted)
1
M10 Flat Washer (Fitted)
1
Steering Wheel Panel:
6
Poly Steering Wheel with Plate (Fitted)
1
Fasteners:
7
M10 Nyloc Nut (Fitt
ed)
1
Stainless Steel
M10 Flat Washer (Fitted)
1
Application:
Panels ay be used as infills or as role play ite s.
This panel is available for 0.0 , 0.3 , 0.6 , 0.9 , 1.2 , 1.5 &
1.8 high decks.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary, 1
week after installation.
Ongoing aintenance intervals will vary
according to the a ount of use the
equip ent receives.
Reco end inspection intervals every 3
onths.
Wear Item - Refer Warranty
Installation Instructions:
1. Refer to the plan view for the position of the Tri Panel.
2. Lift the panel into position and bolt it to the inside of the
uprights with M10x25 Torx Bolts and Washers under the
bolt heads.
3. Ensure all Bolts are fully tightened.
Note:
In-ground Upright depth ay vary
depending on Softfall
- Sand/Mulch/Grass–700 (Pictured)
- Rubber – 500
+ 300 Added to Upright depth if
co ponent is Freestanding
+ Use ID tag as reference.
Age Groups:
3-7 Years
7-15 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No.
P
-
03
T

ABACUS PANEL
Item
Description Qty
Specifications
1
Abacus Ball
–
Red, Yellow, Blue *
30
2
Abacus Panel Rung
3
Materials:
3
M10 Flat asher
12
4
M10x25mm Torx Bolt
12
Colour: Optional
Finish: Powdercoat
Fasteners:
Stainless Steel
Application:
Panels may be used as infills or as roll play items.
This panel is available for 0.3m, 0.6m & 0.9m deck only, as well as
at ground level.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* ear Item - Refer arranty
Installation Instructions:
1. Slide 10 balls onto each of the slide bars –sequence as below.
(R=Red, B=Blue, Y=Yellow)
RRR BBBB YYY
YYY RRRR BBB
BBB YYYY RRR
RRR BBBB YYY
2. Using Torx
Bolts & Flat ashers attach the slide bars to the
frame. Start from the top and work down.
3. Once the four slide bars have been fitted to the frame use
the Allan key provided to fully tighten.
4. Refer to the plan view for the position of the panel.
5. Lift the panel into position on the outside face of the uprights
and secure it with Torx Bolts and Flat ashers.
Note:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No. P
-
06

PORTHOLE PANEL
Item
Description Qty
Specifications
1
Porthole Panel or Bubble Panel (plastic)
1
2
M10x2 mm Torx Bolt
4
Materials:
3
M10 Flat Washer
4
4
M10x20mm Torx Bolt (Fitted)
8
M10 Nyloc Nut (Fitted)
8
Colour: Optio
nal
6
M10 Plastic Washer (Fitted)
8
7
M10 Flat Washer (Fitted)
8
Finish: Powdercoat
8
Ali Panel
1
Fasteners:
Stainless Steel
Application:
Panels may be used as infill or as role play items.
This panel is available for 0.3m, 0.6m, 0.9m, 1.2m, 1. m & 1.8m high
decks, as well as at ground level.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
Installation Instructions:
1. Refer to the plan view for the position of the panel.
2. Lift the panel into position and bolt it to the inside of the
uprights with Torx Bolts and Flat Washers under the bolt
heads.
Note:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 00mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE
: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No. P
-
08

TRI
SAFETY
PANEL
, TRI PIRATE LOOKOUT
PANEL
or TRI STEERING WHEEL PANEL
Item
Description Qt
Specifications
1
Tri
Safety Panel,
or
Tri
Pirate Lookout Panel,
or
1
1
Tri
Steering Wheel Panel
1
Materials:
2
M10x25 Torx Bolt
4
3
M
10 Flat Washer
4
Colour: Optional
Pirate’s Lookout Panel:
4
Universal Telescope (Fitted)
1
Finish: Powdercoat
5
3/8” Nyloc Nut (Fitted)
1
M10 Flat Washer (Fitted)
1
Steering Wheel Panel:
6
Poly Steering Wheel with Plate (
Fitted)
1
Fasteners:
7
M10 Nyloc Nut (Fitted)
1
Stainless Steel
M10 Flat Washer (Fitted)
1
Application:
Panels ay be used as infills or as role play ite s.
This panel is available for 0.0 , 0.3 , 0.6 , 0.9 , 1.2 , 1.5 &
1.8 high decks.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary, 1
week after installation.
Ongoing aintenance intervals will vary
according to the a ount of use the
equip ent receives.
Reco end inspection intervals every 3
onths.
* Wear Item - Refer Warrant
Installation Instructions:
1. Refer to the plan view for the position of the Tri Panel.
2. Lift the panel into position and bolt it to the inside of the
uprights with M10x25 Torx Bolts and Washers under the
bolt heads.
3. Ensure all Bolts are fully tightened.
Note:
In-ground Upright depth ay vary
depending on Softfall
- Sand/Mulch/Grass–700 (Pictured)
- Rubber – 500
+ 300 Added to Upright depth if
co ponent is Freestanding
+ Use ID tag as reference.
Age Groups:
3-7 Years
7-15 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No.
P
-
01T

SQUEEZE PANEL
Item
Description Qty
Specifications
1
Squeeze Panel Rung
2
2
Squeeze Panel Chain *
4
Materials:
2
Squeeze Panel Rubber Tubing *
4
3
M1 x25 Torx Bolt
8
4
M1 Flat Washer
8
Colour: Optional
M1 Touch Nut
8
Finish: Powdercoat
Fasteners:
Stainless Steel
Application:
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - efer Warranty
Installation Instructions:
1. Refer to the plan view for the position of the panel.
2. Lift the panel into position and bolt it to the inside of the
uprights with eight Torx Bolts and Flat Washers under the
bolt heads.
Note:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–7 mm (Pictured)
- Rubber – 5 mm
+ 3 mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No. P
-
25

POLY CRAWL TUNNEL
Item
Description Qty
Specifications
1
Poly Crawl Tunnel
1
2
Tube Slide Entry Panel
2
Materials:
3
M10X25 Torx Bolt
40
4
Flat Washers M10
72
5
Nyloc Nut M10
32
Colour: Optional
Finish: Powdercoat
Fasteners:
Stainless Steel
Application:
aintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing aintenance intervals will vary
according to the a ount of use the
equip ent receives.
Reco end inspection intervals every 3
onths.
* Wear Item - Refer Warranty
Installation Instructions:
1. Refer to the plan view for position of Crawl Tunnel.
2. Lift the Tunnel into position between the two uprights and
secure with for Torx Bolts with Flat Washers under the
heads at each end.
3. Ensure all bolts are fully tightened.
Note:
In-ground Upright depth ay vary
depending on Softfall
- Sand/Mulch/Grass–700 (Pictured)
- Rubber – 500
+ 300 Added to Upright depth if
co ponent is Freestanding
+ Use ID tag as reference.
Age Groups:
3-7 Years
7-15 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No. TN
-
01

UPRIGHT
Item
Description
No.
Specifications
1
Upright
1
Material: Galv Steel
Colour:
Finish: Po dercoat
Fasteners:
Stainless Steel
Application:
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 eek after installation.
Ongoing maintenance intervals ill vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
*Wear item: See Warranty
Installation Instructions:
1. Locate the Upright on the plan dra ing provided.
2. Install Posts so that ID Tag sits at Finished Ground Level
here indicated, use this as master post to give
measurements for other uprights.
3. Allo concrete to cure prior to use.
No
te:
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
Age Groups:
3-7 Years
7-15 Years
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________ DATE: ___________
Doc No.
Upright
Table of contents
Other Miracle Play Set & Playground Equipment manuals
Popular Play Set & Playground Equipment manuals by other brands

stilum
stilum Kalle Mounting instructions

stilum
stilum sura 4b Mounting instructions

Twoey
Twoey 2400 Assembly instructions

Community Playthings
Community Playthings Nursery gym user manual

HUCK Seiltechnik
HUCK Seiltechnik Midi Climbing Teepee installation instructions

Community Playthings
Community Playthings A692 Product guide