Peak MANCHESTER User manual

MANCHESTER
Installation Guide
1/31/3
No representation or warranty is given that your particular
application of these products complies with relevant building codes.
Consult with professionals and local building officials before beginning
work: (i) to ensure compliance with relevant building codes for your
application; (ii) to identify appropriate safety gear used during
installation; (iii) to ensure that the work area is free from utilities,
services and hazards; and (iv) to clarify any instructions or warnings that
may not be clear. Inspect and maintain these products on a regular basis.
Peak Products Corporation shall not be liable for any loss or damage
resulting from the improper installation or improper use of this product,
subject to any contrary provision of the Australian Consumer Law in
Australia or the Consumer Guarantees Act 1993 (NZ) in New Zealand.
Peak products and associated materials are protected by patents,
designs, copyrights and/or trademarks.
©2020 Peak Innovations Inc. ND_NZ_Manchester_InstalGuide_V1
WARNING
FENCING
NO-DI
G

WARNING: Before you install, ensure the work area is free from utilities, services and other hazards.
Fence Panel Installation
B
A
Mark
B
Pin
B
AHammer Level
Block
1st Post
2nd Post
A
C
4A: Hammer the second spike into the
ground at the marked location.
B: Insert the second post through the
fence panel tabs and down onto the
spike. Then secure with pin (provided).
C: For installation on sloped surfaces,
drill 4 mm pilot holes through the
upper and lower panel tabs on the
downhill side of the panel. Then
fasten panel to post using 8G x 15 mm
screws (not provided).
3A: Insert the first post down through
the fence panel tabs and onto the
spike. Then secure with pin (provid-
ed).
B: Insert the second post through the
fence panel tabs and press the post
into the soil to mark the location for
the second spike.
2A: Position the first spike and
hammer it into the ground until the
top plate is flush with the surface.
B: Use a level to ensure the spike is
plumb.
1Measure and mark the position of all posts and
use a string line to ensure they are aligned.
Then lay the fence panels flat along the string
line with the pickets all oriented on the same
side of the panel. Start at an end, corner, or
gate. For installation on sloped surfaces, start at
the highest point.
2/3

B
A
A
B
Pin
Retainer
A: Insert first post down through
the gate hinges and onto the spike.
Then secure with pin (provided).
B: Determine the placement for the
second spike and hammer it into the
ground.
3
4A: Slide retainer onto second post
and insert post down onto the
spike. Then secure with pin
(provided).
B: Position retainer to align with
latch, then drill two 4 mm pilot
holes through side of post. Fasten
retainer to post using two screws
(provided).
2A: Position the first spike and
hammer it into the ground until the
top plate is flush with the surface.
B: Use a level to ensure the spike is
plumb.
1Measure and mark the position of all posts and
use a string line to ensure they are aligned.
Then lay the fence panels flat along the string
line with the pickets all oriented on the same
side of the panel. Start at an end, corner, or
gate. For installation on sloped surfaces, start at
the highest point.
WARNING: Before you install, ensure the work area is free from utilities, services and other hazards.
B
AHammer Level
Block
1st Post
2nd Post
Gate Installation
3/3

1/31/3
SHEFFIELD
Installation Guide
No representation or warranty is given that your particular
application of these products complies with relevant building codes.
Consult with professionals and local building officials before beginning
work: (i) to ensure compliance with relevant building codes for your
application; (ii) to identify appropriate safety gear used during
installation; (iii) to ensure that the work area is free from utilities,
services and hazards; and (iv) to clarify any instructions or warnings that
may not be clear. Inspect and maintain these products on a regular basis.
Peak Products Corporation shall not be liable for any loss or damage
resulting from the improper installation or improper use of this product,
subject to any contrary provision of the Australian Consumer Law in
Australia or the Consumer Guarantees Act 1993 (NZ) in New Zealand.
Peak products and associated materials are protected by patents,
designs, copyrights and/or trademarks.
©2020 Peak Innovations Inc. ND_NZ_Sheffield_InstalGuide_V1
WARNING
FENCING
NO-DI
G

2/3
Mark
B
A
Pin
B
A
C
WARNING: Before you install, ensure the work area is free from utilities, services and other hazards.
Fence Panel Installation
B
AHammer Level
Block
1st Post
2nd Post
4A: Hammer the second spike into the
ground at the marked location.
B: Insert the second post through the
fence panel tabs and down onto the
spike. Then secure with pin (provided).
C: For installation on sloped surfaces,
drill 4 mm pilot holes through the
upper and lower panel tabs on the
downhill side of the panel. Then
fasten panel to post using 8G x 15 mm
screws (not provided).
3A: Insert the first post down
through the fence panel tabs and
onto the spike. Then secure with pin
(provided).
B: Insert the second post through
the fence panel tabs and press the
post into the soil to mark the
location for the second spike.
2A: Position the first spike and
hammer it into the ground until the
top plate is flush with the surface.
B: Use a level to ensure the spike is
plumb.
1Measure and mark the position of all posts and
use a string line to ensure they are aligned.
Then lay the fence panels flat along the string
line with the pickets all oriented on the same
side of the panel. Start at an end, corner, or
gate. For installation on sloped surfaces, start at
the highest point.

3/3
B
A
Retainer
A
B
Pin
A: Insert first post down
through the gate hinges and
onto the spike. Then secure
with pin (provided).
B: Determine the placement for
the second spike and hammer
it into the ground.
3
4A: Slide retainer onto second post
and insert post down onto the
spike. Then secure with pin
(provided).
B: Position retainer to align with
latch, then drill two 4 mm pilot
holes through side of post. Fasten
retainer to post using two screws
(provided).
2A: Position the first spike and
hammer it into the ground until the
top plate is flush with the surface.
B: Use a level to ensure the spike is
plumb.
1Measure and mark the position of all posts and
use a string line to ensure they are aligned.
Then lay the fence panels flat along the string
line with the pickets all oriented on the same
side of the panel. Start at an end, corner, or
gate. For installation on sloped surfaces, start at
the highest point.
WARNING: Before you install, ensure the work area is free from utilities, services and other hazards.
B
AHammer Level
Block
1st Post
2nd Post
Gate Installation
Table of contents
Other Peak Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Barrette
Barrette 73045674 Assembly instructions

Heras
Heras Pallas UK 100 installation manual

Safetots
Safetots ST-CWSF instructions

Simplified Building
Simplified Building DDA Handrail System manual

Horizont
Horizont turbomax N1430 instruction manual

Graham's Fence
Graham's Fence Arlington Semi Privacy installation instructions