
2/3
Mark
B
A
Pin
B
A
C
WARNING: Before you install, ensure the work area is free from utilities, services and other hazards.
Fence Panel Installation
B
AHammer Level
Block
1st Post
2nd Post
4A: Hammer the second spike into the
ground at the marked location.
B: Insert the second post through the
fence panel tabs and down onto the
spike. Then secure with pin (provided).
C: For installation on sloped surfaces,
drill 4 mm pilot holes through the
upper and lower panel tabs on the
downhill side of the panel. Then
fasten panel to post using 8G x 15 mm
screws (not provided).
3A: Insert the first post down
through the fence panel tabs and
onto the spike. Then secure with pin
(provided).
B: Insert the second post through
the fence panel tabs and press the
post into the soil to mark the
location for the second spike.
2A: Position the first spike and
hammer it into the ground until the
top plate is flush with the surface.
B: Use a level to ensure the spike is
plumb.
1Measure and mark the position of all posts and
use a string line to ensure they are aligned.
Then lay the fence panels flat along the string
line with the pickets all oriented on the same
side of the panel. Start at an end, corner, or
gate. For installation on sloped surfaces, start at
the highest point.