Installation Instructions
Models PM6838 and PM6838S
PA1231
Page 8 of 10
Notes Before You Begin: Do not over tighten bolts during assembly, only snug
tighten them until assembly is complete.
Carefully read and understand these installation instructions before you
begin.
Step 1: Before attempting to assemble your equipment, please review all
installation information carefully. Should you experience any diffi culty during the
installation process, please call us at the phone number shown on the last page
of these instructions.
Step 2: Separate and identify all components and hardware.
Step 3: Excavate, or prepare, the footings as shown in the Component or Surface
Mount Footing Details in the Challenger Guidelines.
Step 4: Attach the clamps to the barrier gates. See Detail A. Position the neck
of the clamp over the top rail of the gate and attach as shown. Fully tighten the
connections. Ensure both clamps are turned in the same direction.
Step 5: Attach the barrier gates to the support posts. See Detail B. Position each
gate against the deck with the clamp closed around the support post. Apply a drop
of thread locking adhesive to the bolt threads, and attach as shown.
Step 6: Attach the barrier gates to the deck. See Detail C. Align the holes in the
barrier gate tabs with the upper holes in the deck and attach as shown.
Note: In the event of a clamp confl ict with an adjacent component, the barrier
gates may be attached to the lower holes in the deck.
Step 7: Attach the climber support bar to the support posts. See Detail D. Position
the climber support bar between the support posts, apply a drop of thread locking
adhesive to the bolt threads, and attach as shown.
Step 8: Attach the 72" vine climber to the climber support bar. See Detail E.
Position the climber adaptor against the top of the vine climber and then against
the climber support bar, and attach as shown. Coped end of the adaptor must be
fl ush against the support bar.
Step 9: Attach the 60" FS climber to the 72" vine climber. See Detail F. Position
the climber adaptor against the top of the FS climber and then against the vine
climber, and attach as shown. Coped end of the adaptor must be fl ush against
the 72" vine climber.
Step 10: Attach the support rungs to the climbers. See Detail G. Position each
support rung between an 60" FS climber and the 72" vine climber, align the holes,
and attach as shown.
Step 11: Attach the 60" center climber to the 60" FS climber. See Detail H. Position
the climber adaptor against the top of the 60" center climber and then against the
60" FS climber, and attach as shown. Coped end of the adaptor must be fl ush
against the FS climber.
Step 12: Attach the plank rungs to the mounting brackets on the climbers. See
Detail I. Position the rungs between the climbers and on top of the brackets.
Attach as shown. Fully tighten the connections.
Step 13: Attach the planks to the plank rungs. See Detail J. Position each plank
onto a rung and attach as shown. Fully tighten the connections.
Step 14: Attach the ropes to the climbers. See Detail K. Position each rope between
the mounting tabs on two climbers, apply a drop of thread locking adhesive to the
bolt threads, and attach as shown. Fully tighten the connections.
Final Details.
Step 15: Plumb and level the component. Tighten all fasteners. Fully tighten all
fasteners according to tightening torque specifi cations.
Torque Specifi cations:
Bolts and nuts - Snug tighten and then tighten an additional one half turn.
In-ground: Block and brace for concrete. Pour concrete after all equipment has
been assembled. Allow 72 hours for concrete to completely cure.
Surface Mount: Bolt down all surface mount supports in accordance with
specifi cations provided by your registered structural engineer.
Important Note: Surface mount hardware is not supplied. Customer is responsible
for concrete base and for providing surface mount hardware as specifi ed by a
registered structural engineer for each specifi c project application.