
Primo GmbH · Wernher-von-Braun-Str. 2 · 84544 Aschau am Inn · Phone
+49 8638 / 88 55 92 00 ·
Fax
88 55 92 99 ·
All information without guarantee. We reserve the right to make improvements that serve technical progress.
Assembly instructions
XL 300 FLEX LARGE BOX
Description Order-no.
XL 300 Flex large box P536
650°C H
Halogen free
Ø
0 – 300 mm
Assembly in in-situ concrete Assembly in the precast concrete parts plant
Fix the XL 300 Flex large box with
nails to the formwork.
Insert the pipes, close the cover with
the cable ties provided.
Glue the XL 300 large flex can to the
switch table with hot glue.
Precast concrete element is poured.