manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. RectorSeal
  6. •
  7. Rack & Stand
  8. •
  9. RectorSeal WBB500HR User manual

RectorSeal WBB500HR User manual

Popular Rack & Stand manuals by other brands

Dynex DX-MP3MT Quick setup guide

Dynex

Dynex DX-MP3MT Quick setup guide

Konig & Meyer 24185 manual

Konig & Meyer

Konig & Meyer 24185 manual

ECG LD 326501 instruction manual

ECG

ECG LD 326501 instruction manual

Philips SB7S19S/00 quick start guide

Philips

Philips SB7S19S/00 quick start guide

Woodline KIT-250 lb instructions

Woodline

Woodline KIT-250 lb instructions

ricoo S1222 installation instructions

ricoo

ricoo S1222 installation instructions

Kanto P301 user manual

Kanto

Kanto P301 user manual

VidaBox VB MNT FFS2 installation guide

VidaBox

VidaBox VB MNT FFS2 installation guide

PROEL PLWIN60C user manual

PROEL

PROEL PLWIN60C user manual

AllMounts PLB-43S instruction manual

AllMounts

AllMounts PLB-43S instruction manual

VMP VH-001 instruction sheet

VMP

VMP VH-001 instruction sheet

Nederman SYSTEM 920/400 instruction manual

Nederman

Nederman SYSTEM 920/400 instruction manual

Glasdon ORBIS POST MOUNTING KIT installation guide

Glasdon

Glasdon ORBIS POST MOUNTING KIT installation guide

Songmics LGR105 manual

Songmics

Songmics LGR105 manual

Grape GM401 user manual

Grape

Grape GM401 user manual

FourStarGroup 11225296 manual

FourStarGroup

FourStarGroup 11225296 manual

CHIEF FLR100 installation instructions

CHIEF

CHIEF FLR100 installation instructions

FEC XDCAM EX PMW-EX30 manual

FEC

FEC XDCAM EX PMW-EX30 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

WBB500HR
Installation
Bracket Arm (2) Crossbar (1) Support Arm (2) 1"Bolt (4)
Clip Nut (4)
Rubber Mount (4) M10 x 60mm
Hex Bolt (2)
Extend bracket arms.
Unscrew rubber stand-os on the
back of each arm as needed to
level both arms.
<
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
condenser foot
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.
Tighten two bolts on
each arm.
>
>
>
>
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
1
6
5
4
3
2
Bracket Arm (2) Crossbar (1) 8x80mm
Lag Screw(6)
1” Bolt (4)
Clip Nut (4)
Rubber Mount (4)
WBB300 & WBB500 Installation
The buyer of the aforelisted product(s) hereby indemnify Rectorseal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local
building and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure
are of sucient strength, and a sucient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
10mm Concrete
Anchor (6)
>
>
>
>
Extend bracket arms.
Unscrew rubber stand-os on the
back of each arm as needed to
level both arms.
<
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
condenser foot
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.
Tighten two bolts on
each arm.
>
>
>
>
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
1
6
5
4
3
2
Bracket Arm (2) Crossbar (1) 8x80mm
Lag Screw(6)
1” Bolt (4)
Clip Nut (4)
Rubber Mount (4)
WBB300 & WBB500 Installation
The buyer of the aforelisted product(s) hereby indemnify Rectorseal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local
building and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure
are of sucient strength, and a sucient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
10mm Concrete
Anchor (6)
>
>
>
>
❶Extended bracket arms.
Extend bracket arms.
Unscrew rubber stand-os on the
back of each arm as needed to
level both arms.
<
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
condenser foot
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.
Tighten two bolts on
each arm.
>
>
>
>
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
1
6
5
4
3
2
Bracket Arm (2) Crossbar (1) 8x80mm
Lag Screw(6)
1” Bolt (4)
Clip Nut (4)
Rubber Mount (4)
WBB300 & WBB500 Installation
The buyer of the aforelisted product(s) hereby indemnify Rectorseal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local
building and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure
are of sucient strength, and a sucient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
10mm Concrete
Anchor (6)
>
>
>
>
❷ Level and attach crossbar with two lag screws or
anchors provided (Substitute other fastener types where
appropriate). Slide extended bracket arms onto crossbar.
Anchors
(A)
(A)
❸Insert clear clip/nut into mounting key
hole from below arm. Attach rubber mount
through key hole, aligning center hole with
clip/nut. Repeat and slide all four mounts to
the center of their respective slots.
Extend bracket arms.
Unscrew rubber stand-os on the
back of each arm as needed to
level both arms.
<
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
condenser foot
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.
Tighten two bolts on
each arm.
>
>
>
>
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
1
6
5
4
3
2
Bracket Arm (2) Crossbar (1) 8x80mm
Lag Screw(6)
1” Bolt (4)
Clip Nut (4)
Rubber Mount (4)
WBB300 & WBB500 Installation
The buyer of the aforelisted product(s) hereby indemnify Rectorseal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local
building and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure
are of sucient strength, and a sucient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
10mm Concrete
Anchor (6)
>
>
>
>
❹ Unscrew rubber stand-
offs on the back of each
arm as needed to level both
arms.
<
❺Position arms to accommodate equipment measurements
and tighten set screws. Use remaining lag screws or anchors
to secure bracket arms.
(B)
(B)
(C)
(B)
(B)
(C)
❻Install support arms inside Horizontal arms and tighten M10 hex bolts.
(D)
(D)
❼Position mounts to
accommodate equipment
measurements. Place con-
denser on mounts aligning
holes in feet with center hole
in mounts. Attach using 4
provided bolts.
Extend bracket arms.
Unscrew rubber stand-os on the
back of each arm as needed to
level both arms.
<
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
condenser foot
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.
Tighten two bolts on
each arm.
>
>
>
>
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
1
6
5
4
3
2
Bracket Arm (2) Crossbar (1) 8x80mm
Lag Screw(6)
1” Bolt (4)
Clip Nut (4)
Rubber Mount (4)
WBB300 & WBB500 Installation
The buyer of the aforelisted product(s) hereby indemnify Rectorseal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local
building and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure
are of sucient strength, and a sucient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
10mm Concrete
Anchor (6)
>
>
>
>
The buyer of the aforelisted product(s) hereby indemnify RectorSeal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside of the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local building
and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure are sufficient
strength, and a sufficient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.
C
ontact: RectorSeal®2601 Spenwick Drive, Houston, TX 77055 713-263-8001 800-231-3345 713-263-7577 800-441-0051 rectorseal.com
P
F
W
A CSW Industrials Company
M10
M10
Anchors
Anchors
WBB500HR
Installation
Anchor Kit
a - 3/8"Wedge
Anchor (8)
b - 5/8"Wedge
Anchor (2)
c - M8 x 76mm Lag
Screw (10)
Unit Size Maximum Height Risk Category Minimum Wall Requirement Anchors
A B C D
Small, Medium and Large 30'BLDG Risk Cat II,
Exposure C
f’c >= 3000 PSI (20.7MPa) Concrete for
Cracked and Uncracked Concrete
a a a b
Small 50'BLDG Risk Cat II, III & IV
Exposure C & D
f’c >= 3295 PSI (22.7MPa) Concrete a a a b
Small 30'BLDG Risk Cat II, III & IV
Exposure C & D
Wood, G=0.42 Min., Cp = 1.6 c c c c
Not Included
Lag Screw
d3/8"x 3 1/2"
e1/2"x 3 1/2"
f5/8"x 3 1/2"
Unit Size Height Risk Category Minimum Wall Requirement Anchors
A B C D
Small, Medium and Large 15'BLDG Risk Cat II Exposure C Wood, G=0.42 Min., Cp=1.6 d d e f
C
ontact: RectorSeal®2601 Spenwick Drive, Houston, TX 77055 713-263-8001 800-231-3345 713-263-7577 800-441-0051 rectorseal.com
P
F
W
A CSW Industrials Company
The buyer of the aforelisted product(s) hereby indemnify RectorSeal Corporation, its successors and assigns, as they may in time appear, harmless against any claims,
demands or liability arising out of the misuse of or from any use outside the intended scope of the aforelisted product(s). Misuse or use outside of the intended scope shall
include any use contrary to that which is indicated with the accompanying literature and instructions. This unit must be installed in accordance with all applicable local building
and mechanical codes. The purchaser or installer of these products is responsible for insuring that the structure and/or building materials making up the structure are sufficient
strength, and a sufficient number and type of fasteners are installed, to take the combined weight of the bracket and unit or units.