3.) Insert one end of the #48CB’s into the large holes located near the ends of (1) #PR48LB. Slide the #48CB into the hole
until about 4” is protruding through.
4.) Install the second #PR48LB into the two remaining ends of the #48CB’s, using the same method as before. Make
certain that all 4 legs installed in Step 2 are situated in the same direction.
5.) Take the assembled Roverpet Puppy Rail System and lower one side of the rails into your Roverpet whelping box. Line
up the #PR48LB connecting ends with the 2nd vertical bars of the whelping box panels.
Note: Make sure the #PR48LB connecting end will not be installed on a door panel, rotate the Roverpet Puppy Rail Assembly
90* to avoid attachment on door panel. Verify the legs will rest on the floor of your whelping box when installation is complete.
6.) Clip the #PR48LB connecting ends around the vertical bars.
7.) With the one side of the #PR48LB installed on the vertical bars, slide the high-side of the Roverpet Puppy Rail System
down into the Roverpet whelping box. Make sure the #PR48LB connecting ends are installed in the same manner as in