TW12
Step 2
Drill Holes
Installation Instructions
Please check the contents of the Omnipanel carton to be sure you have received
all of the parts required for your particular model. Runtal has made every effort to
insure that all of the materials required for mounting your Omnipanel have been
included, and depending upon your specific installation conditions, you may have
parts left over. The Omnipanel mounting system has been designed for installation
by one person, but you may find an assistant helpful.
The plumber should determine the piping configuraton for the Omnipanel.
Drywall construction may require metal wall anchors (part B). Solid wood or
placement directly onto blocking will require only the #8 x 11/2long screws (part
A). Omnipanels are very sturdy construction, and care should be taken that they
are properly and securely hung using all four mounting points.
Be sure to drill the mounting holes in the middle of the mounting brackets marks.
Use of metal anchors will require 5/16” holes while use of #8 x 11/2long screws will
require 1/16” holes.
For proper installation, the
placement of wall brackets and
the water hook-up must be
exact. The diagrams at the right
show the placement of the four
mounting brackets for all models.
The positioning of the mounting
hardware may be completed by:
1. Measuring out the dimensions
2. Asking an assistant to hold the
unit to the wall while you trace
the four mounting posts, or
3. Making a template by placing the Omnipanel onto a posterboard or large piece
of the Omnipanel carton and tracing the mounting posts. The template is then
taped to the wall.
IMPORTANT INSTRUCTIONS: READ & SAVE THESE INSTRUCTIONS