SKYLUX Solar User manual

Skylux
®
electric screen
Solar
Mounting instructions
EN
SKYLIGHTS

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
2/15
Safety
Take the necessary and required safety precautions, such as safety nets and lifelines when installing from the
outside, safety goggles, gloves, hard hat, etc.
Do not step on the glass.
Falling from height
• When using ladders to go on the roof:
- Ladder in good condition?
- Set up correctly at an angle of 75°?
- Secured below and on top against moving?
- Don’t take heavy material with you on the ladder (3-point contact rule)! If possible,
use a crane to lift the material.
• Do not lift material over the roof edge; use a crane to put the material on the roof.
• Roof zone: make sure the part of the roof where the skylight/barrel vault will be installed is
safe enough, e.g. secure the edge (support system in the roof gutter that supports against the
outer wall of the building, with suitable A B C category depending on the roof pitch) or use a
scaffold so no one can fall off the roof. If the roof is not safe enough, always use a harness with
lifeline (adapted to the fall height), attached to a suitable attachment point.
•Make sure the roof is stable and does not have dangerous openings or insufficient secure parts
(e.g. corrugated sheets, …). Take the necessary measures if this is not the case: strengthen,
use suitable safety nets below the danger zones, …
• Before making the roof opening for the skylight/barrel vault: make sure there are safety nets
conform to the current legislation. The nets must be attached firmly and sufficiently to the
building.
•When using an aerial work platform: always wear and secure your harness (mandatory)! Leaving
the cage is forbidden.
• Never walk backwards on a roof, always walk forwards.
• Make sure there’s enough light in the working zone.
Low-hanging obstacles and falling loads
• Forbidden to walk under or within a radius of 1 m of a hanging or lifted load.
• Demarcate the danger zone below the skylight/barrel vault, in the building as well as on the
outside near the outer walls (in case material slides off the roof). If the zone is demarcated,
people cannot be hit by any falling loads. It’s prohibited to enter these danger zones during
construction.
Crushing hazard
• All working tools are in good condition, provided with a valid CE label and all necessary safety
regulations. These cannot be removed.
• People who use these working tools are educated for this purpose. Protections are always
present on all working tools. They are in good condition and need to be set correctly.
Tripping/falling
•Safety is key and it begins with order and tidiness. Clean everything immediately, leave nothing
lying around.
• Trash needs to be sorted.
• Be cautious with electric cables (danger of tripping/falling). Never walk backwards!
• Make sure there’s enough light in the working zone.

01/09/2022 3/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Sharp objects
• Make sure your fingers/hands are not pinched and watch out for cuts while handling skylights
or barrel vaults.
• Be careful where you put your hands during the installation.
• Wearing cut-resistant gloves is mandatory.
Ergonomics
• Always lift loads correctly: bend your knees, move your feet instead of forcing your spine, lift
as close to your body as possible.
• Parts of more than 25 kg must be lifted with at least 2 persons.
Connection and charging
• Not suitable for charging appliances.
Personal protective equipment
• Work clothes, safety shoes and helmet are mandatory for everyone.
• Lifeline and harness are mandatory if the edge is not secured enough or if there are no safety nets below the
roof opening. They are also necessary when using an aerial working platform.
• Use gloves when handling skylight or barrel vault parts.
• Safety glasses and hearing protection are mandatory when using saws / grinders.
Always perform a Last Minute Risk Analysis!
If in doubt: STOP! Do not take unnecessary risks. Ask your supervisor if needed.

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
4/15
Table of contents
Overview profiles and parts
Depending on its dimensions, the screen starts on the short or long side.
Please note: the electric screen on Solar cannot be combined with opal and/or solar control glazing.
Necessary tools
PVC curb GRP curb
Ø 9
Ø 5
#
Electric screen Solar
Possibilities:
Sunblind
Blackout blind
Insect screen
77375 Leaf spring
5115 HiLo screw 25 mm PH2 -
for installation in PVC curb
78278
Rivet white 5.6 mm
Ø 5 mm - for installation in
polyester (GRP) curb
78179 Roll of tape 2 mm
10 m (optional use)
30474
(optioneel)
Cuttable covering rubber
for cable 50 cm
83538 Bluetooth Niko switch
77433
Bluetooth push button
interface Skylux - optional -
on demand
105710 Mounting instructions
electric screen Solar
SAFETY p. 2
TABLE OF CONTENTS p. 4
OVERVIEW PROFILES AND PARTS p. 4
NECESSARY TOOLS p. 4
DIMENSIONS AND POSITION OF THE
ELECTRIC SCREEN p. 5
PREPARATION p. 5
INSTALLATION p. 6
ELECTRICAL CONNECTION / COMMISSIONING p. 14
CONTROL: SWITCH p. 15
Niko
Ø 9

01/09/2022 5/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Dimensions and position of the electric screen
General:
The dimensions of the electric screen depend on the daylight size of the curb. The electric screen is to be installed
in the daylight size, at the top of the curb.
Please note: installing the electric screen with Solar deeper in the curb will significantly reduce the eency of the
Solar solar panel.
Curb requirements:
It is important that the curb and its daylight size are perpendicular and have no deformations.
Correct: perpendicular and no deformations Wrong: not perpendicular and deformations
Preparation
The electric screen must always be installed on the inside of the skylight’s curb.
General:
During the installation and possible plasterboard finish for the ceiling and the curb, the accessibility and possible
removal of the electric screen afterwards must be taken into account. This is to ensure a good service afterwards.
Removing the screen afterwards via the top or outside of the skylight is not possible.
Finish:
Provide the necessary details for any further finish the inside of the curb.
The standard finish is done with plasterboard up to the roof opening, and up to the provided lining groove at the
bottom of the curb if applicable.
If a higher finish with plasterboard is desired, a distance of at least 20 mm must be left between the top side of the
plasterboard and the bottom of the electric screen. The customer must always remove the plasterboard if service
is needed and/or if the electric screen must be removed.
The charging port must also always be accessible.
daylight size
roof opening
USB-C port
cover
Make sure the USB-C port at the bottom
of the profile of the electric screen is
easily accessible to charge the battery if
necessary.

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
6/15
Installation
Remove everything from the packaging.
Do not use a utility knife to prevent any damage.
Orientation of the electric screen
Orientation top / bottom:
Orientation towards the sun:
The solar panel must be facing south to achieve the best eciency. Install the electric screen with the solar panel
on the north side (N).
Correct: Wrong:
Solarpack on the north side Solarpack on the south side
Solarpack solar panel
facing upwards / outside
cover (Bluetooth logo) and charging port
facing downwards / inside
N
S
NW NE
W E
N
S
NW NE
W E

01/09/2022 7/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Installing the mounting clips
Position and number of mounting clips:
Mounting clips must always be provided on the transversal sides of the electric screen.
150 X 4 clips 150
150 150X 6 clipsX 6 clips
short side (K)
screen
long side (L) ≤ 2000 mm
X 12 clips
150 X 12 clips X 12 clips X 12 clips X 12 clips 150
short side (K)
screen
long side (L) > 2000 mm

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
8/15
Intermediate distance X
daylight size
from
K =
short
side
number
of clips
# clips
per side
between
start and
-1
between
1-2
between
2-3
between
3-4
between
4-5
between
5-6
between
6 - end
400 x 400 4 2 150 100 150
400 x 700 4 2 150 100 150
400 x 1000 4 2 150 100 150
400 x 1300 4 2 150 100 150
400 x 1400 4 2 150 100 150
400 x 1600 4 2 150 100 150
400 x 1900 4 2 150 100 150
400 x 2200 K 12 6 150 133 668 300 668 133 150
400 x 2800 K 12 6 150 199 901 300 901 199 150
450 x 1050 4 2 150 150 150
470 x 470 4 2 150 170 150
500 x 500 4 2 150 200 150
500 x 700 4 2 150 200 150
500 x 800 4 2 150 200 150
500 x 1000 4 2 150 200 150
500 x 1100 4 2 150 200 150
500 x 1400 4 2 150 200 150
500 x 1700 4 2 150 200 150
500 x 2000 4 2 150 200 150
500 x 2300 K 12 6 150 166 684 300 684 166 150
550 x 550 6 3 150 125 125 150
600 x 600 6 3 150 150 150 150
600 x 800 6 3 150 150 150 150
600 x 900 6 3 150 150 150 150
600 x 1200 6 3 150 150 150 150
600 x 1300 6 3 150 150 150 150
600 x 1500 6 3 150 150 150 150
600 x 1600 6 3 150 150 150 150
600 x 1800 6 3 150 150 150 150
600 x 2000 6 3 150 150 150 150
700 x 700 6 3 150 200 200 150
700 x 1000 6 3 150 200 200 150
700 x 1300 6 3 150 200 200 150
700 x 1500 6 3 150 200 200 150
700 x 1600 6 3 150 200 200 150
700 x 2000 6 3 150 200 200 150
700 x 2200 K 12 6 150 133 668 300 668 133 150
750 x 750 6 3 150 225 225 150
750 x 1050 6 3 150 225 225 150
750 x 1250 6 3 150 225 225 150
750 x 1650 6 3 150 225 225 150
750 x 1750 6 3 150 225 225 150
750 x 2250 K 12 6 150 149 676 300 676 149 150
800 x 800 6 3 150 250 250 150
800 x 1100 6 3 150 250 250 150
800 x 1200 6 3 150 250 250 150
800 x 1300 6 3 150 250 250 150
800 x 1400 6 3 150 250 250 150
800 x 1600 6 3 150 250 250 150
800 x 1700 6 3 150 250 250 150

01/09/2022 9/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Intermediate distance X
daylight size
from
K =
short
side
number
of clips
# clips
per side
between
start and
-1
between
1-2
between
2-3
between
3-4
between
4-5
between
5-6
between
6 - end
800 x 1800 6 3 150 250 250 150
800 x 2000 6 3 150 250 250 150
800 x 2200 K 12 6 150 133 668 300 668 133 150
800 x 2300 K 12 6 150 166 684 300 684 166 150
800 x 2500 K 12 6 150 233 718 300 718 233 150
800 x 2800 K 12 6 150 199 901 300 901 199 150
850 x 850 6 3 150 275 275 150
900 x 900 6 3 150 300 300 150
900 x 1200 6 3 150 300 300 150
900 x 1500 6 3 150 300 300 150
900 x 1800 6 3 150 300 300 150
900 x 2100 K 12 6 150 99 651 300 651 99 150
1000 x 1000 6 3 150 350 350 150
1000 x 1300 6 3 150 350 350 150
1000 x 1500 6 3 150 350 350 150
1000 x 1600 6 3 150 350 350 150
1000 x 1800 6 3 150 350 350 150
1000 x 2000 6 3 150 350 350 150
1000 x 2200 K 12 6 150 133 668 300 668 133 150
1000 x 2300 K 12 6 150 166 684 300 684 166 150
1000 x 2500 K 12 6 150 233 718 300 718 233 150
1000 x 2800 K 12 6 150 199 901 300 901 199 150
1000 x 3000 K 12 6 150 266 934 300 934 266 150
1050 x 1050 12 6 150 150 150 150 150 150 150
1050 x 1650 12 6 150 150 150 150 150 150 150
1050 x 2250 K 12 6 150 149 676 300 676 149 150
1100 x 1100 12 6 150 160 160 160 160 160 150
1100 x 1400 12 6 150 160 160 160 160 160 150
1100 x 1700 12 6 150 160 160 160 160 160 150
1100 x 2300 K 12 6 150 166 684 300 684 166 150
1200 x 1200 12 6 150 180 180 180 180 180 150
1200 x 1400 12 6 150 180 180 180 180 180 150
1200 x 1500 12 6 150 180 180 180 180 180 150
1200 x 1800 12 6 150 180 180 180 180 180 150
1200 x 2100 K 12 6 150 99 651 300 651 99 150
1300 x 1300 12 6 150 200 200 200 200 200 150
1300 x 1600 12 6 150 200 200 200 200 200 150
1300 x 1900 12 6 150 200 200 200 200 200 150
1400 x 1400 12 6 150 220 220 220 220 220 150
1500 x 1500 12 6 150 240 240 240 240 240 150
1600 x 1600 12 6 150 260 260 260 260 260 150

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
10/15
In case of a combination with an openable glass flat roof window: do not screw where the built-in actuators are
situated.
Never screw where the built-in spindle actuator is situated in the curb!!
In case of a square curb:
Install the electric screen with the screws of the mounting clips on the sides without actuators.
actuator
355 mm
actuator
screen
actuator
screen
actuator
screen
actuator
screen

01/09/2022 11/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Screw the mounting clips in the daylight size of the curb by using the supplied fixations; depending on the curb
type:
PVC curb Polyester (PRV) curb
PVC curbs:
Screw the mounting clips in the daylight size of the curb, on the screw line (if available), at 10 mm from the top
side. Use the HiLo screws 25 mm PH2.
Align the top side of the mounting clips with the top side of the curb flange.
Please note:
Do not screw through the curb towards the outside to avoid any water infiltration from the outside. Installing the
electric screen with Solar deeper in the curb will significantly reduce the eency of the Solar solar panel.
Polyester (PRV) curbs:
Do not screw in the polyester curbs.
Only drill a hole in the inner wall of the polyester curb and use the rivet.
Do not screw in the polyester curbs.
Use the rivet.
HiLo screw rivet
screw line
10 mm
Pre-drill with Ø 5 mm through the inner
wall of the polyester (PRV) curb.
Ø 5 Ø 9

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
12/15
Place the electric screen
Optional:
Depending on the play of the daylight size of the curb and the desired finish, the supplied tape can be provided
around or on one or more sides of the electric screen. This also eliminates the visual play (this can be the case
especially with a polyester curb and in exceptional cases with a PVC curb).
Take the electric screen and install it correctly as described above.
Place and clip the electric screen on the inside of the skylight in the mounting clips.
Attach correctly (clip): click!

01/09/2022 13/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Prevent the electric screen from getting blocked by the mounting clips during opening and closing.
Pull the electric screen horizontally in relation to the curb:
Remove the protective foil on the solar panel before the first use.
Pull
10 mm

E_MH_Mounting_instructions_Skylux_Electric_screen_Solar 01/09/2022
14/15
Electrical connection / commissioning
In any case, charge the electric screen for 8 hours first before the installation or first use.
Charge:
When there is little sunlight, the electric screen with Solarpack (battery included) can be recharged again.
Low battery in the Solarpack charger
Charger type:
USC-C to standard USB-A USB-C to USB-C
The electric screen is always charged with a charger
with USB-C connection. This is possible with a
universal USB-C to a standard USB-A charger.
A charger type USB-C to USB-C is strongly advised
against since it cannot guarantee an optimal
charging.
On the inside of the flat roof window on the bottom of the electric screen, there is a USB-C port. Remove the
small round cover first.
!
USB-C
USB-A
USB-C
USB-C
USB C
do not charge
devices
cover
port
(USB-C)

01/09/2022 15/15
E_MH_Mounting_instructions_Skylux_Electric_screen_Solar
Please note:
The Solarpack (battery included) in the electric screen is not suited for charging other appliances (like for example
smartphones).
Please note: the electric screen on Solar is
not suited for charging other appliances!
Control: switch
Bluetooth pulse switch (standard)
This wireless and battery-free switch allows you to control your Bluetooth operated system from a distance. The
switch can be installed on a European socket box, screwed on a wall (screws are not included in the delivery) or
attached on a flat surface with double-sided adhesive strips (included in the delivery).
The system is operated (open-stop-close) by pushing a single button.
This Bluetooth switch has a range of 10 m*. Keep this in mind when installing the switch.
* The range is highly dependent on surrounding obstacles, such as walls and building materials.
button for controlling with standard settings
Bluetooth push button interface (optional: on demand)
This Bluetooth push button interface is suited for a combination with a wireless built-in switch of your choice.
General use
The electric screen with Solarpack is suited for normal use in normal climate conditions for flat roof windows and/
or skylights.
Do not store, place or transport the electric screen with Solarpack in places where extra heat accumulation can
occur, nor in places that are extremely humid.
Following aspects are excluded from normal use in normal climate conditions: damage of the solar panel due
to overvoltage, lightning strike, water damage, vermin, fire, glass breakage, extreme shocks or similar external
influences, based on actions of third parties and other events or accidents that are excluded from normal use of
the solar panel and on which the manufacturer does not have any influence.
Niko
Table of contents
Popular Projection Screen manuals by other brands

Cirrus Screens
Cirrus Screens Alto Series installation manual

Da-Lite
Da-Lite Parallax Instruction book

Elite Screens
Elite Screens F60XWV1 user guide

Elite Screens
Elite Screens Evanesce Tension B Series user guide

Cirrus Screens
Cirrus Screens Stratus Series user manual

Elite Screens
Elite Screens Elite Ez-Frame Series user guide