Source SBOL 450 User manual

Installation Guide for SBOL 450 / SBOL 750
Only branded lamps are recommended
Installation Sheet
Read these instructions before commencing installation. Please retain for future reference.
Lamp Details
Lamp Cap: E27 GLS
Wattage: 60W (max)
IP65 0.3m 240V~50Hz 60W max.
E27 Bollards
Manta
Available finish:- Black
450mm
200mm 200mm
135mm
135mm
750mm
These fittings are Class II and do not require an Earth
Important Information
•It is recommended that these luminaires are installed and fitted by a qualified electrician ensuring the installation complies
with current IEE wiring regulations & local building control.
•These products are designed for connection to a 240V~50Hz supply.
•Any faulty, broken or damaged luminaires should be replaced immediately.
Please Note: The limited warranty shall be deemed null and void in the following circumstances: Failure by the installer, end user or
any third party to exercise caution to protect any covered product or part from outside damage, adverse temperature (normal
operating ambient temperature -15 ~ +40°C), humidity conditions, fluctuations in the electrical system or physical abuse as well as
failure related to workmanship in the installation of the products or parts.
Important User Advice
Always switch off mains supply before servicing lamp changes and maintenance.
Please ensure that a suitable maintenance schedule is performed including greasing any exposed metal parts and cleaning with a
non-abrasive cleaner to ensure the product gives you a long lasting trouble free life.
Installation Procedure
Safely isolate the mains supply before installation.
Remove the head by loosening the grub screw and twisting anticlockwise.
Route the cable through the cable gland (8mm-12mm) and terminate wiring as per Figure 1.
Install suitable lamp not exceeding the maximum wattage.
Refit the head in reverse of removal ensuring the seal is clean, in place and undamaged, grease the grub screw and tighten.
Tighten the cable gland ensuring a water tight connection.
Secure the bollard in place using suitable fixings for the application.
Turn mains supply on and test luminaire.
Never touch a hot lamp.
Fig.1
Mains Supply Luminaire
L- Brown
Live
L
N - BlueNeutral
N
Only branded lamps are recommended
Installation Sheet
Read these instructions before commencing installation. Please retain for future reference.
Lamp Details
Lamp Cap: E27 GLS
Wattage: 60W (max)
IP65 0.3m 240V~50Hz 60W max.
E27 Bollards
Manta
Available finish:- Black
450mm
200mm 200mm
135mm
135mm
750mm
These fittings are Class II and do not require an Earth
Important Information
•It is recommended that these luminaires are installed and fitted by a qualified electrician ensuring the installation complies
with current IEE wiring regulations & local building control.
•These products are designed for connection to a 240V~50Hz supply.
•Any faulty, broken or damaged luminaires should be replaced immediately.
Please Note: The limited warranty shall be deemed null and void in the following circumstances: Failure by the installer, end user or
any third party to exercise caution to protect any covered product or part from outside damage, adverse temperature (normal
operating ambient temperature -15 ~ +40°C), humidity conditions, fluctuations in the electrical system or physical abuse as well as
failure related to workmanship in the installation of the products or parts.
Important User Advice
Always switch off mains supply before servicing lamp changes and maintenance.
Please ensure that a suitable maintenance schedule is performed including greasing any exposed metal parts and cleaning with a
non-abrasive cleaner to ensure the product gives you a long lasting trouble free life.
Installation Procedure
Safely isolate the mains supply before installation.
Remove the head by loosening the grub screw and twisting anticlockwise.
Route the cable through the cable gland (8mm-12mm) and terminate wiring as per Figure 1.
Install suitable lamp not exceeding the maximum wattage.
Refit the head in reverse of removal ensuring the seal is clean, in place and undamaged, grease the grub screw and tighten.
Tighten the cable gland ensuring a water tight connection.
Secure the bollard in place using suitable fixings for the application.
Turn mains supply on and test luminaire.
Never touch a hot lamp.
Fig.1
Mains Supply Luminaire
L- Brown
Live
L
N - BlueNeutral
N
E27 Bollards
Available nish - Black
Base Diameter Base Diameter
Only branded lamps are recommended
Installation Sheet
Read these instructions before commencing installation. Please retain for future reference.
Lamp Details
Lamp Cap: E27 GLS
Wattage: 60W (max)
IP65 0.3m 240V~50Hz 60W max.
E27 Bollards
Manta
Available finish:- Black
450mm
200mm 200mm
135mm
135mm
750mm
These fittings are Class II and do not require an Earth
Important Information
•It is recommended that these luminaires are installed and fitted by a qualified electrician ensuring the installation complies
with current IEE wiring regulations & local building control.
•These products are designed for connection to a 240V~50Hz supply.
•Any faulty, broken or damaged luminaires should be replaced immediately.
Please Note: The limited warranty shall be deemed null and void in the following circumstances: Failure by the installer, end user or
any third party to exercise caution to protect any covered product or part from outside damage, adverse temperature (normal
operating ambient temperature -15 ~ +40°C), humidity conditions, fluctuations in the electrical system or physical abuse as well as
failure related to workmanship in the installation of the products or parts.
Important User Advice
Always switch off mains supply before servicing lamp changes and maintenance.
Please ensure that a suitable maintenance schedule is performed including greasing any exposed metal parts and cleaning with a
non-abrasive cleaner to ensure the product gives you a long lasting trouble free life.
Installation Procedure
Safely isolate the mains supply before installation.
Remove the head by loosening the grub screw and twisting anticlockwise.
Route the cable through the cable gland (8mm-12mm) and terminate wiring as per Figure 1.
Install suitable lamp not exceeding the maximum wattage.
Refit the head in reverse of removal ensuring the seal is clean, in place and undamaged, grease the grub screw and tighten.
Tighten the cable gland ensuring a water tight connection.
Secure the bollard in place using suitable fixings for the application.
Turn mains supply on and test luminaire.
Never touch a hot lamp.
Fig.1
Mains Supply Luminaire
L- Brown
Live
L
N - BlueNeutral
N

Unit 7/8 Ashbourne Business Centre, Ballybin Road, Ashbourne, Co. Meath, A84 YP58, Ireland
Phone: +353 1 835 7447, UK Ph: 0330 551 7000 , Website: www.sgd.ie
For more information contact: ErP
COMPLIANT
IP65
COMPLIANT
Quality
Assurance
years
Product end of life instruction.
This Lighting product is in the scope of EU 2019/2020 directive on Waste Electrical and Electronic Equipment
(WEEE). This product must be disposed according to the legislation. This document is intended for use by
end of life recyclers or treatment facilities. It provides the basic information to assure an appropriate end of
life treatment for the components and materials of the product. Please follow pictured diagram on the back
of this manual showing how to dismantle the product into different components which should be disposed
correctly. These components would consist of plastic, metal and electronic materials. It is the responsibility of
the end user to dispose of this product correctly. www.weeeireland.ie or contact your local council for further
information.
Assembly / Disassembly Diagram
1. 2. 3.
4. 5.
6. 7.
8. 9.

Declaration Number:
0028 – SBOL 450
This declaration of conformity is issued under the sole responsibility of the manufacturer.
Products:
LED E27 Bollard
Model Numbers:
SBOL 450
SBOL 750
The product/model of the declaration described above is in conformity with the relevant
community harmonisation legislation:
Directive 2014/35/EU – Low Voltage Directive
The product/model of the declaration described above is in conformity with the standards
and technical specifications listed below:
EN IEC 60598-2-1:2021, EN IEC 60598-1:2021
Signed 26/10/2022
This manual suits for next models
1
Table of contents