State: 03.12.2020 p. 3
Mounting instructions for multiplay „gravis 2B“
Item-No. 51 5519 422
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved
Diagram 3: Foundation plan
6. Clean the foundation surface. Connect the platforms to the posts acc. to
diagram 1 and 4. Please fasten the parts using the screws including in the
delivery.
7. Place both towers as shown in diagram 1 and 3 on the foundations and
do a rough aligning. The connections of the wobble bridge should be face to
face.
Note: Do not screw the base plates onto the foundations yet!
8. Mount the wobble bridge with the towers at the intended locations acc. to the
diagram 1, 5c and 6b. Please fasten the parts using the shackles including in
the delivery.
9. Connect the slide (diagram 5b) with the tower at the intended location and
fasten it using the screws including in the delivery (see diagram 6a).
10. Connect the climbing balls (diagram 5d) and the climbing eye (diagram 5e)
with the tower at the intended locations. Please fasten the parts using the
screws including in the delivery (see diagram 6c).
Note: Take a look at the alignment of the two elements acc. to diagram 1
and 2 to ensure the correct minimum space.
11. Place the base plate of the climbing net onto the foundation and connect the
climbing net (diagram 5a) with the tower at the intended locations acc. to the
diagram 1 and 6b. Please fasten the parts using the shackles including in the
delivery.
12. Align the play equipment once more on the foundations, so that the wobble
bridge does not sag too much.
Note: The climbing net should be placed with tension to avoid droop.
3630
450400
1458
3316
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
gravis 2B
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
1006-00-00
Maßstab
Mattheis
31.10.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
21.08.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
600
600
600
600
600
800
600
600
670
992
600
36301521
702
254
1073
1040
1815
20351523
1226 1073
254
406
1303
1027
1040
1259 1259
1259
730
1250
1040
254
1073
2385
1908
2505
300
300
880
1030
1320
1630
399
1057
593
757
1027
461
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
2
gravis 2B
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:30
A3
Name
Name
Fundamentplan
1006-00-00
Maßstab
Mattheis
31.10.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
21.08.20
stoßdämpfender Boden
A
DatumÄnderungRev
beliebiger Boden
optional floor
660 1567 1576
9988
450400
9490
3324
1462
2193
4920
4247
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
gravis 2A
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:50
A3
Name
Name
Fundamentplan
1005-00-00
Maßstab
Simonis
12.11.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B
stoßdämpfender Boden
21.08.20
ES
SI
18.07.19
retis Fundament näher
A
DatumÄnderungRev
play level