manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Studio Proper
  6. •
  7. Rack & Stand
  8. •
  9. Studio Proper Prop Stand User manual

Studio Proper Prop Stand User manual

Prop Stand installation instructions
01
02
03
Fixed screw installation
3M installation
Puck installation and assembly
Fix the Prop Stand to the desired surface.
Prop Stand installation instructions
01
02
03
04
05
06
Remove TPU Socket
Ensure the position and orientation of the stand
is how it is desired once fixed.
Mark screw position
Create pilot and cable holes
Route cables required
Remove TPU Socket
-
Replace the TPU Socket
Follow guidelines of screws specific to the mounting surface
for creating pilot holes.
Speciality plugs or drill bits may be required.
The cable hole should not exceed 15mm diameter.
Mounting screws must pass through 25mm in the stand base
before they contact the surface, ensure the correct length
of screw is purchased.
The Prop stand has screw mounting holes suited for coun-
tersunk screws with a max 5.5mm in diameter.
Break the perforations in the base 3M liner.
Route any cables needed for the product being
secured.
Ensure the exit of the cable aligns neatly with the port
location on the mounted device.
Side View
Front of Stand
Front of stand
Top View
Top View
45°
37.1mm
Cable hole
x2 Pilot hole
01 Fixed screw installation
01
02
03
Route cables required
Create pilot and cable holes
Angle direction
Top View
Side View
Cable hole
Follow guidelines of screws specific to the mounting surface
for creating pilot holes.
Speciality plugs or drill bits may be required.
The cable hole should not exceed 15mm diameter.
Mounting screws must pass through 25mm in the stand base
before they contact the surface, ensure the correct length
of screw is purchased.
The Prop stand has screw mounting holes suited for coun-
tersunk screws with a max 5.5mm in diameter.
Break the perforations in the base 3M liner.
Route any cables needed for the product being
secured.
Ensure the exit of the cable aligns neatly with the port
location on the mounted device.
Remove Liner and Install
Remove the four 3M VHB liners and place the stand firmly
in its final position.
Ensure to capture all cables and the positioning and angles
are as desired.
Ocial 3M Installation instructions
Pressure
Bond strength is dependent upon the amount of adhesive-to-surface contact developed. Firm application pressure develops better
adhesive contact and helps improve bond strength. Typically, good surface contact can be attained by applying enough pressure to insure
that the tape experiences approximately 15 psi (100 kPa) pressure. Either roller or platen pressure can be used. Note that rigid surfaces
may require 2 or 3 times that much pressure to make the tape experience 15 psi.
Temperature
Ideal application temperature range is 70ºF to 100ºF (21ºC to 38ºC). Pressure sensitive adhesives use viscous flow to achieve substrate
contact area. Minimum suggested application temperature is 50ºF (10ºC)
Note: Initial tape application to surfaces at temperatures below these suggested minimums is not recommended because the adhesive
becomes too firm to adhere readily. However, once properly applied, low temperature holding is generally satisfactory. To obtain good
performance with all 3M™ VHB™ Tapes it is important to ensure that the surfaces are dry and free of condensed moisture.
Time
After application, the bond strength will increase as the adhesive flows onto the surface. At room temperature approximately 50% of
ultimate bond strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours.
Allow the 3M VHB to bond to the surface before applying
any pressure to the Prop Stand.
Prop Stand installation instructions
02 3M installation
01
Tether the mounting puck
If the mounted product requires the security tether, slot the
mounting piece into the recessed space before attaching to
the product.
02
Product installation
Attach the metal puck to the centre of the device.
The puck will only work with flat backed devices.
Ensure the tether is attached before attaching, as it cannot
be added or removed once the adhesive is set.
Ocial 3M Installation instructions
Pressure
Bond strength is dependent upon the amount of adhesive-to-surface contact developed. Firm application pressure develops better
adhesive contact and helps improve bond strength. Typically, good surface contact can be attained by applying enough pressure to insure
that the tape experiences approximately 15 psi (100 kPa) pressure. Either roller or platen pressure can be used. Note that rigid surfaces
may require 2 or 3 times that much pressure to make the tape experience 15 psi.
Temperature
Ideal application temperature range is 70ºF to 100ºF (21ºC to 38ºC). Pressure sensitive adhesives use viscous flow to achieve substrate
contact area. Minimum suggested application temperature is 50ºF (10ºC)
Note: Initial tape application to surfaces at temperatures below these suggested minimums is not recommended because the adhesive
becomes too firm to adhere readily. However, once properly applied, low temperature holding is generally satisfactory. To obtain good
performance with all 3M™ VHB™ Tapes it is important to ensure that the surfaces are dry and free of condensed moisture.
Time
After application, the bond strength will increase as the adhesive flows onto the surface. At room temperature approximately 50% of
ultimate bond strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours.
Allow the 3M VHB to bond to the surface before applying
any pressure to the Prop Stand.
See below for the easiest mounting method.
Prop Stand installation instructions
03
Fix the device to your Prop Stand
04
Attach cables
Removing product
Attaching product
03 Puck installation and assembly

Popular Rack & Stand manuals by other brands

peerless-AV DS-MBZ647L installation instructions

peerless-AV

peerless-AV DS-MBZ647L installation instructions

EINHELL 43.106.11 Assembling

EINHELL

EINHELL 43.106.11 Assembling

Crimson AV S46P instruction manual

Crimson AV

Crimson AV S46P instruction manual

Ergotron HD Extend Arm user guide

Ergotron

Ergotron HD Extend Arm user guide

Rinnai RTBRACKA Assembly instructions

Rinnai

Rinnai RTBRACKA Assembly instructions

Manhattan 461221 instructions

Manhattan

Manhattan 461221 instructions

Rigol DP1308A installation guide

Rigol

Rigol DP1308A installation guide

BOWMAN MP-035 quick start guide

BOWMAN

BOWMAN MP-035 quick start guide

THORLABS MMR601 user guide

THORLABS

THORLABS MMR601 user guide

Vinyfix 140 Series instruction manual

Vinyfix

Vinyfix 140 Series instruction manual

UMAGE TRIPOD user guide

UMAGE

UMAGE TRIPOD user guide

BlackHawk Labs MiniRaQ Installation overview

BlackHawk Labs

BlackHawk Labs MiniRaQ Installation overview

Atdec AWM-FC installation guide

Atdec

Atdec AWM-FC installation guide

Technics SH-KS225 Assembly instructions

Technics

Technics SH-KS225 Assembly instructions

Vivo STAND-V000D5 instruction manual

Vivo

Vivo STAND-V000D5 instruction manual

Omron NV3Q-ATT02 instruction sheet

Omron

Omron NV3Q-ATT02 instruction sheet

ZIMSTONE X FRAME Instruction guide

ZIMSTONE

ZIMSTONE X FRAME Instruction guide

Babyletto 4260 Assembly instructions

Babyletto

Babyletto 4260 Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.