SUPER NOVA MOD-1614D Manual

© 2023
Order #XXXXX
Locked layer contains
placeholder marks.
Plan View
10’
20’
MOD-1614D Double-Sided Lightbox
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS

© 2023
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information

© 2023
Order #XXXXX
Straight Connection
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
COMPLETED ASSEMBLY
3) Tighten all knobs to secure connection.
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
CEI152 Profile
Slide both connectors across seam of extrusions.
Tighten all knobs.
All knobs must be tightened securely to ensure a proper connection.
All knobs must be tightened securely to ensure a proper connection.
Corner
Connectors Corner
Connectors
Corner
Connectors Corner
Connectors
Straight Connector
Straight Connector
2) Loosen all knobs, then slide straight
connectors across the seam of extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
CEI152 Frame Assembly

© 2023
Order #XXXXX
Graphic Removal
To remove the graphic
the frame, locate the fabric
pull tab.Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
from
SEG Installation

© 2023
Case 1 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each Level
Level 1
(Bottom level)
Level 2 Level 3
10A
9A,9 8,8A
1,1,1
10 7A 7
Case Packing

© 2023
Case 2 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each Level
Level 1
(Bottom level)
Level 2
Graphics
Setup Hardware
6
4 4A 5A5
Case Packing

© 2023
Case 3 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each Level
6A
32 2A
3A
Level 1
(Bottom level)
Level 2
Graphics
Case Packing

© 2023
Step 1 of 2
Order #XXXXX
Locked layer contains
placeholder marks.
When assembled
FRONT VIEW
Item
1
2/2A
3/3A
4/4A
5/5A
6/6A
7/7A
8/8A
9/9A
10/10A
--
Qty.
3
1/1
1/1
1/1
1/1
1/1
1/1
1/1
1/1
1/1
2
Description
Base Plate
47.5” CEI152 Horizontal Extrusion
45” CEI152 Horizontal Extrusion
45” CEI152 Horizontal Extrusion
45” CEI152 Horizontal Extrusion
47.5” CEI152 Horizontal Extrusion
47.5” CEI152 Vertical Extrusion
45.677” Z33 Vertical Extrusion
45.677” Z33 Vertical Extrusion
47.5” CEI-152 Vertical Extrusion
U-Channel
Steps:
Refer to the CEI152 Frame Assembly general information page.
1) Attach U-Channels to horizontals [2,6]. See U-Channel Attachment detail.
2) Assemble horizontals [2-3-4-5-6], [2A-3A-4A-5A-6A] &
verticals [7-7A], [8-8A], [9-9A], [10-10A] using straight connectors.
3) Connect vertical assemblies [7/7A], [10/10A] between horizontal
assemblies [2/3/4/5/6], [2A/3A/4A/5A/6A] using corner connectors.
4) Attach verticals [8/8A], [9/9A] between horizontal assemblies.
See Z45 Attachment detail.
5) Connect Base Plates [1] to Horizontals [2,4,6], using bolts & wing nuts.
Assemble frame flat on ground.
U-Channel Attachment
Slide V4 connectors into
top groove of horizontal
extrusion. Tighten set-
screws to secure.
Use bolts to connect
U-Channel to
horizontal.
V4
connector
bolts
set
screws
*
Keep U-Channels attached to extrusions when repacking.
CEI-152
Z45
Z45 Attachment
Attach Z45 vertical to middle
groove of CEI-152 horizontal.
*
FRONT VIEW
1
2
U-Channel
3
4
56
2A
7
7A
10
10A
8
8A
9
9A
3A
4A
5A 6A
1
1
**
**
U-Channel
*
*
Lightbox Assembly

© 2023
Step 2 of 2
Order #XXXXX
Locked layer contains
placeholder marks.
Power
Break
20.5” PR63
38” PR63
38” PR63
42” PR63
6.5” PR63 6.5” PR636.5” PR6322.5” PR636.5” PR63
Steps:
1) Attach power cords to Supernova lights as shown.
2) Attach PR63 conduit to extrusions for wire managment.
See PR63 Attachment detail.
3) Apply SEG Graphics to assembled frame. Refer to the
SEG Installation general information page.
FRONT ELEVATION VIEW
+
-
Power
Female
Transformer
144W / 6 Amp / 24V
++
--
Lights Male
Light to Light Attachment
Maximum of 7 lights per chain / 11 lights per Transformer
Light to Transformer Attachment
Transformers Transformers
Power
Break
Power
Break
U-Channel U-Channel
Power
Break
PR63 Attachment
1) Run cords through PR63 plastic conduit.
2) Attach conduit by pinching the opening
& inserting into the groove of extrusion.
pinch PR63 conduit
Lightbox Attachments
Other manuals for MOD-1614D
1
Table of contents