TieYak.com Page 2
06/19
Assembly
Tower Base
1. Welded nuts on 24” Base and
Base Legs need to be
face-down to attach Leveling
Feet in Step 2.
2. Slide Base Post over Base
with holes lined up.
3. Hold Base Leg to Base Post
(the side with the square hole)
and line up square holes. In-
sert two Carriage Bolts hori-
zontally through all holes with
Washer and Lock Nut on back-
side. Tighten securely.
Repeat for second tower.
3” Carriage Bolt (4)
24” Base (2)
24”Base Post (2)
20”Base Leg (2)
Lock Nut (4)
Leveling Feet
1. The Anchor is used when anchoring
Base to floor, ground or dock. These
may be omitted when Base is on
a stable level surface/environment.
2. For use with Anchors, remove first Hex
Nut from Leveling Foot, place Anchor
on foot and then screw Hex Nut back
on. Screw into Base.
For use without Anchors, leave one
of the Hex Nuts on Leveling Feet and
then screw four Leveling Feet into
welded nut in each Base.
Repeat for second tower.
Anchor (6)
Leveling Foot (6)
For technical assistance or replacement parts: Call 866.787.7369
Washer (4)