
5
Paget
READY FOR SURVEY - The USM is ready to deploy and begin
survey operations.
ENGAGE SHEAR BLOCK - Using the Speed Wrench, engage Shear
Block. Tighten until you feel a ‘hard stop’. Do Not Over Tighten.
REINSTALL SHEAR BLOCK TOWER - Using a 5/16” Allen Wrench,
install two ½-13 x 5” flat-head bolts.Torque screws to 35 FT-LBS. 17 18
19 20
GENERAL MAINTENANCE - Ensure all stainless hardware always
coated with a marine grade anti-seize product. Always wash and dry the
USM after each use. After the unit is dry apply a silicone spray or
lubricant that does not make plastic swell.
AVAILABLE FROM USM FOR MOUNT SERVICE AND MAINTENANCE
● AQUA-SHIELD GREASE
● T-9 BOESHIELD
● CMD EXTREME PRESSURE #3 GREASE
● BOLT AND SPARES KITS
5/16”
35 FT-LBS
SPEED
WRENCH
TM