7Hardware setup
Each SmartSpeed Pro timing gate consists of the following components:
•1 x timing unit
•1 x reflector
•2 x tripods
To assemble a timing gate:
1. Assemble the tripods
a. Loosen tripod knob and pull legs away from stem.
b. Push down on knob assembly until supports are horizontal.
2. Connect the timing unit and reflector to the tripods
a. Line up the tripod connection with the bayonet on the tripod.
b. Press down into the tripod and twist into a locked position.
c. Ensure tripod neck is firmly tightened.
Repeat the above steps for all timing gates in your system.
Once all timing gates have been assembled, the gates can be positioned for the required drill.
Refer to the SmartSpeed Drills Manual for suggested drill protocols.
To position a timing gate:
1. Place a timing unit and a reflector in line with each other (generally 1-4m apart)
2. Stand behind a timing unit
3. Turn on the timing unit –the unit will beep until it is correctly aligned with the reflector
4. Hold the top of the unit with one hand
5. Hold the tripod neck with the other hand
6. Direct the light towards the reflector
7. Adjust the light until the red alignment light is on and the unit stops beeping
8. Repeat the above steps for each timing gate required.
Note:
•If using a SmartScan (RFID) or SmartPad, connect it to the start timing unit using the
provided PS2 cable.
•If using SmartShoxx, connect it to the relevant timing unit using the PS2 connector (green
end) on the SmartShoxx. Timing units connected to SmartShoxx do not require a reflector.
•If using a Portable Jump Mat, connect it to the relevant timing unit using the PS2 connector
on the Portable Jump Mat. Timing units connected to a Portable Jump Mat do not require a
reflector.
•In windy environments, ensure timing unit is optimally aligned by moving it side by side
slightly and ensure it remains aligned with the reflector.