Wisdom HW1-S287-A User manual

Description:Caribbean Pirates Climbing Set-Hull
Item Code:HW1-S287-A
Manufacturer: Wisdom Educational Product Co.,Ltd
Manufacturer Address: Building 4, Lane 2777, Baoan Road, Malu Town, Jiading District, Shanghai, China
Assembly Instructions
1

Assembly Instructions
1.Before installation, ensure that the site meets the below installation requirements.
1)Confirm whether the site has obvious slope affecting the installation. (The height difference of the concrete floor should not be more than 5cm, and the
grass should be leveled when installing the equipment.)
2)Confirm whether there are immovable obstacles in the site and whether the site size conforms to the installation of this product (use zone shall be
retained).
3) For the concrete floor, the post needs to be fixed to the ground with expansion screws. Ensure that the thickness of the concrete is more
than 12cm (Concrete Strength≥C30).
4) For the grass ground, it will need to dig a hole with at least 60CM deep for the post installation. Please check whether there are water, electricity, gas pipe
and other factors under the site that may affect digging.
5)A minimum of five adults are required for assembly.
Only after the above conditions are met can the installation be performed. If necessary, please contact our company for technical support.
2.Product unpacking confirmation
When unpacking the product, please handle it with care. Protective flooring such as soft pads and cardboard should be laid at temporary storage site to
prevent potential damage. If any componets are damaged due to logistics, please contact the company to replace it in time, so as not to affect the
installation.
3.Confirm the installation position of the product
Before installing the product, confirm the installation position with the customer. It is suggested to place the wall panels, fences and posts horizontally on the
ground according to the design drawing to simulate the installation position, and confirm the use zone between the product and the surrounding area (no
less than 183CM). After the customer's confirmation, install the products in the established position.
5.Installation tools
1)Impact drill, M12 impact drill bit, length not less than 12CM.
2)Suggest to equip with cordless screwdriver to speed up the construction schedule.
3)Scaffolding is recommended to facilitate the installation of square roof and hex roof.
If the site is the grass ground, the following tools should be equipped.
1)Laser level (when digging and pouring concrete to ensure that the posts are at the same level.)
2)Digging tools, such as spade, hammer, etc. (Small excavator is recommended.)
3)String (It is used to help locate the position.)
4.Notes
1)Children should be kept away from the product during incomplete installation, disassembly or maintenance to ensure safety. All screws should be
tightened after assembly.
2)The expansion screws fixed to the ground need to be processed as the last step, and the product needs to be adjusted properly before fixing the
expansion screws.
(1)Ensure that the post is vertical and does not tilt.
(2)Stand in the distance to see the posts in the same direction in a straight line (see from different directions), to ensure the product in good looking.
2

Overall product drawing
Flag
Net Climber
Ramp Climber
Post
3

2497
1790 18301830
18301830
6156
5450
Use zone
4

HW1-S287-A
PART LIST
1
M17
X2
Flagpole post *1
Center beam *1
Net climber side post *2
Ramp climber side post *2 Ramp climber*1 Net climber *1
Flag *1
HARDWARE
M10*230
X2
Ø34
X4
2
M10*190
X8
Ø34
X8
(M10)
X8
(M10)
X16
(M10)
X2
(M10)
X3
M10*320
X1
M10*230
X4
M10*190
X10
(M10)
X32
(M10)
X44
Ø34
X35
The net climber side post is
connected with the outside gap of the
central beam.
5

3
M10*230
X2
(M10)
X2
(M10)
X4
Ø34
X4
4
M10*320
X1
(M10)
X1
(M10)
X2
Ø34
X2
6

5
M10*190
X2
(M10)
X19
(M10)
X19 Ø34
X17
HW1-S287-A
Model Number:
Batch-Number:
Distribution:
Wisdom Education Europe
Zum Poppschen Gut 3
09526 Olbernhau
GERMANY
www.wisdomeurope.com
-Do not allow children to climb on shelves.
-Do not use as a ladder or cart.
CAUTION:
CARE AND CLEANING
-Clean wood with a damp cloth or sponge using
warm water and mild soap. Wipe dry.
-Check for loose or worn parts periodically and
tighten or replace as necessary
-Do not place unit near high heat.
Record the Batch-Number here. Information is located
on the shipping carton and / or the product itself. Keep
this sheet in an accessible place.
7

INSTRUCTION MANUAL
Description: Caribbean Pirates Climbing Set-Body
Item Code:HW1-S287-A
Imported into EU by: Wisdom Education Europe GmbH, Zum Poppschen Gut 3, 09526 Olbernhau,Germany
Manufacturer: Wisdom Educational Product Co.,Ltd
Manufacturer Address: Building 4, Lane 2777, Baoan Road, Malu Town, Jiading District, Shanghai, China
Test standard: EN 1176-1:2017,
Overall Dimension: 249.7*179*368CM
Weigt: NW:313.8KG,GW :330.5KG
INSTALLATION INSTRUCTIONS
1.Ensure the area is safe and devoid of any hazards prior to assembly.The minimum space will be:615.6*545CM.
2.A minimum of two adults are required for assembly.
3.The product and materials are intended for indoor or outdoor use under supervised conditions.
4.Check the quantity of spare part based on spare part list before assembly.
5.When installing,ensure ground is either a soft fall surface,or protected by a soft material such as cardboard or a blanket when assembling to avoid frame
scratching.
6.Tighten all bolts after assembly.
7.Removal all assembly materials and tools from the play area before the equipment is used.
8.During the process of incomplete installation, disassembly, or maintenance, the children should stay away from the product to ensure safe.
9.The product can be fixed to the ground, and the below is the assembling intruction.
8

Ground surfacing
200 716
916
700 549 700 855 700
Locate the position of the post according to the above drawing. Dig a 70x70x91.6D cm pit. Pour 20cm
thickness concrete into the pit as the base(Required Concrete Strength: No Less Than C30). Use a laser
level to ensure that the concrete bases are at the same level. After the concrete has set completely,
assemble the componets in the pit, then pour 51.6cm thickness concrete and cover with soil 20CM to fill
the pit.
51.6cm thickness pouring concrete
20cm thickness concrete base
Soil
3504
20cm thickness covering soil
516 200
Post Footing Diagram
Solid wood post fixing method A
Different sites use different construction methods
Applicable conditions: Grass ground
9

120596
200 716
916
700 549 700 855 700
Locate the position of the post according to the above drawing. Dig a 70x70x91.6D cm pit. Pour 20cm
thickness concrete into the pit as the base(Required Concrete Strength: No Less Than C30). Use a laser
level to ensure that the concrete bases are at the same level. After the concrete has set completely,
assemble the componets in the pit, then pour 71.6cm thickness concrete to fill the pit.
Soil
20cm thickness concrete base
71.6cm thickness pouring concrete
Ground surfacing
Post Footing Diagram
Solid wood post fixing method A
Different sites use different construction methods
Applicable conditions: Concrete floor
10

INSTRUCTIONS
1.Please read the instructions and warning labels carefully before use.
2.Inspect items and play area for any potential hazards prior to use.
3.Maximum number of people using the equipment at the same time is 4 .
4.User age group: 3 ~ 14 years old.
5.Never leave children unattended.Ensure constant adult supervision.
6.Please pay attention to the safety of the surrounding environment before use and avoid use under bad weather conditions.
7.Instruction for anchor
Anchor for grass ground: Check once a month to ensure that the embedded anchor and the self-tapping screw is not loose, and the fabric loop is not broken.
If the anchor is loose, need to be covered with soil for reinforcement. If the screw is loose and fabric loop is broken, need to replace it in time.
Anchor for cement floor: Check once a month to ensure that each expansion screw is not loose. If it is loose, please replace it in time.
8.If the material is damaged and needs to be repaired, please contact the manufacture to repair or replace.
9.Please ensure that the installation ground is horizontal during installation and keep it horizontal during use.
MAINTENANCE
1.Clean with a moist cloth.
2.Use neutral cleaners for cleaning.
3.Regularly inspect the product.
4.Follow the below inspection cycle to adequately inspect the product.
5.Fill in the inspection record after the inspection.
11

INSPECTION INFORMATION
Inspection cycle Inspection Project YES/NO Solution Signature
Daily Inspection on Items
Check screws, bolts and fasteners are tightened.
Installed on a flat surfact and no hazards are present.
Equipment is free of dirt and moisture.
Hook and loop attachments are securely fastened.
Check for a signs of damage and wear.
Monthly Inspection on
Items(Except for Daily
Inspection on Items)
Check screws are free of rust and damage.
Check parts are securely connected.
Check compliance labels are intact.
Annual Inspection on
Items(Except for Daily and
Monthly Inspection on Items )
Check there is no extensive corrosion and replace if required.
Check for cracking or connecting part deterioration. Replace if required.
Check there is no excessive discolouration of components.
Check screws and connectors are in working order and not damaged or deteriorated.
Check compliance labels are legible.
Check the play area under the equipment is safe and level.
12
Table of contents
Other Wisdom Play Set & Playground Equipment manuals