
Please refer to all safety and installation requirements
detailed in the Quick start guide provided with the
HydroTap Command Centre, and HydroTap Command
Centre installation instructions found online, prior to
installation of, or any change to, the complete system.
Before commencing the
installation,download
& read the HydroTap
Command Centre
installation instructions
Using these instructions
Read the
instructions
WARNING
Tools needed for tap installation (not supplied)
In addition to normal tools, the following (or equivalent
equipment) will be required.
• 35mm diameter sheet metal hole punch for sinks.
• 35mm diameter hole saw for worktops.
• Tube spanner for fixing the tap assembly.
220mm
250 - 255mm
Positioning
Position the tap such that it dispenses into the
sink bowl with clearance for a cup or tea pot.
Ensure that taps are positioned to minimise
the risks of scalding by dispensing boiling
water while using the tap.
1
Position Command Centre
and Tap as close together as
possible. See below.
4Cut the hole
• Cut a Ø35mm hole in the worktop / sink.
• Make sure the tap location will allow the tap
spout to drain into the sink.
Ø35mm
5
Familiarise yourself with the tap connections
3
Mount and secure the tap
Upper rubber
washer
Lower rubber
washer
Brass
washer
Fixing nut
Mains
See 6
Hot
Cold Mains
See 6
Chilled sparkling
model shown
Familiarise yourself with the mains
connections
2
RED
Boiling
tube
Sparkling models
WHITE
JG
pipe
BLUE
JG
pipe
Boiling models
CLEAR
Vent
tube
USB USB
BLUE
Chilled
tube
Min - Max pressure, kPA (bar)
HydroTap 170 (1.7) - 700 (7.0)
Sparkling
HydroTap 250 (2.5 ) - 700 (7.0)
Booster 200 (2.0) - 700 (7.0)
Water supply pressure requirements
Be aware of the risks of hazards which could
cause harm when using tools. Assess the
risks before starting the installation.
Fit braided hoses, matching
the hose colours to the tap