Zte ZXUPS S606 User manual

ZXUPS S606/S610
ZXUPS S606/S610
UUnininterrupnterruptitiblble e PPowoweer Sr Supupplyply
Installation ManualInstallation Manual
Version 1.1Version 1.1
ZTE CORPORATIONZTE CORPORATION
ZTE Plaza, Keji Road South,ZTE Plaza, Keji Road South,
Hi-Tech Industrial Park,Hi-Tech Industrial Park,
Nanshan District, Shenzhen,Nanshan District, Shenzhen,
P. R. ChinaP. R. China
518057518057
Tel: Tel: (86) (86) 755 755 26771900 26771900 800-9830-9830800-9830-9830
Fax: (86) 755 26772236Fax: (86) 755 26772236
URL:URL: http://support.zte.com.cnhttp://support.zte.com.cn

LEGAL INFORMATION
LEGAL INFORMATION
Copyright © 2008 ZTE CORPORATION.Copyright © 2008 ZTE CORPORATION.
The contents of this document are protected by copyright laws and internationalThe contents of this document are protected by copyright laws and international
treaties. Any reproduction or distribution of this document or any portion of thistreaties. Any reproduction or distribution of this document or any portion of this
document, in any form by any means, without the prior written consent of ZTEdocument, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited. Additionally, the contents of this document areCORPORATION is prohibited. Additionally, the contents of this document are
protected by contractual confidentiality obligations.protected by contractual confidentiality obligations.
All All company, company, brand brand and and product product names names are are trade trade or or service service marks, marks, or or registeredregistered
trade or service marks, of ZTE CORPORATION or of their retrade or service marks, of ZTE CORPORATION or of their respective owners.spective owners.
This document is provided “as is”, and all express, implied, or statutory warranties,This document is provided “as is”, and all express, implied, or statutory warranties,
representations or conditions are disclaimed, including without limitation any impliedrepresentations or conditions are disclaimed, including without limitation any implied
warranty of merchantability, fitness for a particular purpose, title or non-warranty of merchantability, fitness for a particular purpose, title or non-
infringement. ZTE CORPORATION and its licensors shall not be liable for damagesinfringement. ZTE CORPORATION and its licensors shall not be liable for damages
resulting from the use of or reliance on the resulting from the use of or reliance on the information contained herein.information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual propertyZTE CORPORATION or its licensors may have current or pending intellectual property
rights or applications covering the subject matter of this document. Except asrights or applications covering the subject matter of this document. Except as
expressly provided in any written license between ZTE CORPORATION and itsexpressly provided in any written license between ZTE CORPORATION and its
licensee, the user of this document shall not acquire any license to the subject matterlicensee, the user of this document shall not acquire any license to the subject matter
herein.herein.
The contents of this document and all policies of ZTE CORPORATION, includingThe contents of this document and all policies of ZTE CORPORATION, including
without limitation policies related to support or training are subject to change withoutwithout limitation policies related to support or training are subject to change without
notice.notice.
Revision HistoryRevision History
DaDate te ReRevivisision on NoNo.. SeSeririal al NoNo. . DeDescscririptptioionn
2009-04-8
2009-04-8 R1.0 R1.0 sjzl20092134sjzl20092134 Technical specifications areTechnical specifications are
updated.updated.

ZTE CORPORATIONZTE CORPORATION
Values Your Comments & Suggestions!Values Your Comments & Suggestions!
Your opinion is of great value and will help us improveYour opinion is of great value and will help us improve the quality of our
the quality of our
product documentation and offer better services to product documentation and offer better services to our customers.our customers.
Please fill out the following questionnaire and fax Please fill out the following questionnaire and fax to:to:
(86) 755-26772236;(86) 755-26772236;
Or mail to:Or mail to:
Publications R&D Department, ZTE CORPORATION, ZTE Plaza, A Wing, KejiPublications R&D Department, ZTE CORPORATION, ZTE Plaza, A Wing, Keji
Road South, Hi-Tech Industrial Park, Shenzhen, P. R. China 518057.Road South, Hi-Tech Industrial Park, Shenzhen, P. R. China 518057.
Thank you for your cooperation!Thank you for your cooperation!

Your Comments & SuggestionsYour Comments & Suggestions
Document
Document
NameName ZXUPS S606/S610 (V1.1) Uninterruptible Power Supply Installation ZXUPS S606/S610 (V1.1) Uninterruptible Power Supply Installation ManualManual
ProductProduct
VersionVersion
V1.1V1.1 DocumentDocument
Revision NumberRevision Number
R1.0R1.0
Equipment Installation DateEquipment Installation Date
Presentation:Presentation:
(Introductions, Procedures, Illustrations, Completeness, Level of Detail, Organization,
(Introductions, Procedures, Illustrations, Completeness, Level of Detail, Organization,
Appearance)Appearance)
GoodGood FairFair AverageAverage PoorPoor BadBad N/AN/A
Accessibility:Accessibility:
(Contents, Index, Headings, Numbering, Glossary)
(Contents, Index, Headings, Numbering, Glossary)
GoodGood FairFair AverageAverage PoorPoor BadBad N/AN/A
YourYour
evaluation ofevaluation of
thisthis
documentdocument
Intelligibility:Intelligibility:
(Language, Vocabulary, Readability & Clarity,
(Language, Vocabulary, Readability & Clarity, Technical Accuracy, Content)Technical Accuracy, Content)
GoodGood FairFair AverageAverage PoorPoor BadBad N/AN/A
YourYour
suggestionssuggestions
forfor
improvementimprovement
of thisof this
documentdocument
Please check the suggestions which you feel can Please check the suggestions which you feel can improve thisimprove this
documentation:documentation:
Improve Improve the the overview/introductionoverview/introduction Make Make it more it more concise/briefconcise/brief
Improve Improve the the ContentsContents Add mAdd more step-ore step-by-step prby-step proceduresocedures
Improve Improve the the organizationorganization Add Add more troublesmore troubleshooting informationhooting information
Include Include more more figuresfigures Make Make it less it less technicaltechnical
Add Add more more examplesexamples Add more/bAdd more/better quick etter quick reference aidsreference aids
Add Add more more detaildetail Improve Improve the the indexindex
Other Other suggestionssuggestions
________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________
# Please feel free to write # Please feel free to write any comments on an attached sheet.any comments on an attached sheet.
If you wish to If you wish to be contacted regarding your comments, please complete the following:be contacted regarding your comments, please complete the following:
Name Company
Name Company
Postcode AddressPostcode Address
Telephone E-mailTelephone E-mail

Contents
Contents
About this Manual..About this Manual.................................................................................................................................... ii
Pur
Purpospose of this Mae of this Manuanuall..............................................................................................................................................ii
What
What is in tis in this Mahis Manualnual ..............................................................................................................................................iiii
TypograTypographical Conphical Conventionventionss.............................................................................................................................. iiiiii
Safety Safety SignsSigns........................................................................................................................................................................iviv
How to Get in Touch..
How to Get in Touch..................................................................................................................................................vv
Cust
Customer Somer Suppoupportrt ..................................................................................................................................................................................vv
Documentat
Documentation Sion Supportupport..................................................................................................................................................................vv
Chapter 1..
Chapter 1.............................................................................................................................................................. 11
Safety
Safety InstrucInstructionstions................................................................................................................................ 11
Chapter 2..
Chapter 2.............................................................................................................................................................. 55
Installati
Installation on PreparatiPreparations..ons............................................................................................................ 55
Flow
Flow DescDescriptriptionion ............................................................................................................................................................ 55
Installation Site Inspection..
Installation Site Inspection.............................................................................................................................. 77
Working Environment Requirements..
Working Environment Requirements.......................................................................................................................... 77
Power Supply Requirements..Power Supply Requirements.................................................................................................................................................. 88
Other Requirements..
Other Requirements.......................................................................................................................................................................... 88
Lightnin
Lightning and Surge Protection Requig and Surge Protection Requirementsrements ................................................................................................ 88
Groundin
Grounding g RequiremeRequirementsnts ........................................................................................................................................................ 1010
Unpacking for Inspection...
Unpacking for Inspection....................................................................................................................................................... 1010
Chapter 3...
Chapter 3......................................................................................................................................................... 1111
Equipment Installation...
Equipment Installation............................................................................................................. 1111

UPS
UPS Cabinet Cabinet InstallInstallationation ....................................................................................................................................1111
Installin
Installing UPS on g UPS on Floor...Floor...............................................................................................................................................................1212
UPS Instal
UPS Installation on lation on FramewoFrameworkrk ........................................................................................................................................1818
Installati
Installation Checkon Check................................................................................................................................................................................2121
Battery Cabinet Installation...
Battery Cabinet Installation.........................................................................................................................2222
Cha
Chaptpter 4er 4 .......................................................................................................................................................... 2525
Electric
Electrical al ConnectioConnectionsns .................................................................................................................. 2525
Pre
Precautcautionsions ........................................................................................................................................................................2255
Sele
Selecticting Cabng Cablesles ..........................................................................................................................................................2266
CabCables Conles Connectnectionion ....................................................................................................................................................2288
Connecti
Connecting Teng Terminals rminals ConnectionConnection ................................................................................................................................2828
Connectio
Connection in Single UPS Moden in Single UPS Mode........................................................................................................................................3030
Connection in Serial Hot Backup Mode...
Connection in Serial Hot Backup Mode.................................................................................................................3333
MainteMaintenance bypasnance bypass descriptios descriptionn..............................................................................................................3377
RequireRequirements for Binding Cablesments for Binding Cables............................................................................................................3399
Electri
Electrical Connectical Connection checkon check............................................................................................................................4400
Cha
Chaptpter 5er 5 .......................................................................................................................................................... 4343
System Commissioning...
System Commissioning........................................................................................................... 4343
Commissioning Flow...
Commissioning Flow.............................................................................................................................................4433
StartinStarting the g the UPSUPS..........................................................................................................................................................4444
Flow Description...
Flow Description.................................................................................................................................................................................4444
Check it
Check items Beforems Before Power-one Power-on............................................................................................................................................4646
Powe
Power-on and Star-on and Startuprtup ..................................................................................................................................................................4646
Shut-down
Shut-down and Poweand Power-offr-off........................................................................................................................................................4949
ParameParameters ters SettingSetting ..................................................................................................................................................5500
Paramete
Parameters Setting in Single UPS Moders Setting in Single UPS Mode................................................................................................................5050
Paramete
Parameter Configuration in Serial Hot Backup Moder Configuration in Serial Hot Backup Mode............................................................................5151
Charging Battery...
Charging Battery.......................................................................................................................................................5522

Conn
Connectiecting the Lng the Loadoad ..............................................................................................................................................5353
Appendix A...
Appendix A................................................................................................................................................... 5555
Backgroun
Background Mod Monitoringnitoring.............................................................................................................. 5555
Rel
Relay Ouay Outputput Modt Modee..................................................................................................................................................5656
RS232 Seri
RS232 Serial Port Modeal Port Mode......................................................................................................................................5757
SNMP Ne
SNMP Networtworkinking Modeg Mode ....................................................................................................................................5858
Fi
Figugureress.................................................................................................................................................................. 6161
Tab
Tablesles...................................................................................................................................................................... 6363

This page is intentionally blank.
This page is intentionally blank.

Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION ii
AboAbout thiut this s MMaanunuaall
Purpose of this Manual
Purpose of this Manual
This manual applies to ZXUPS S606 and ZXUPS S610 uninterruptibleThis manual applies to ZXUPS S606 and ZXUPS S610 uninterruptible
power supply (hereinafter referred to as ZXUPS S606/S610). Manualpower supply (hereinafter referred to as ZXUPS S606/S610). Manual
suite of ZXUPS suite of ZXUPS S606/S610:S606/S610:
1.1.ZXUPS S606/S610 (V1.0) Uninterruptible Power SupplyZXUPS S606/S610 (V1.0) Uninterruptible Power Supply
Installation ManualInstallation Manual
This manual provides the information to install the UPS,This manual provides the information to install the UPS,
including installation preparations, installation procedure,including installation preparations, installation procedure,
electrical connections, and equipment debugging.electrical connections, and equipment debugging.
2.2.ZXUPS S606/S610 (V1.0) Uninterruptible Power Supply UserZXUPS S606/S610 (V1.0) Uninterruptible Power Supply User
ManualManual
This manual details the functions and features, technicalThis manual details the functions and features, technical
specifications, the operation instructions and alarm codes of thespecifications, the operation instructions and alarm codes of the
monitoring unit, and routine operation & maintenance of the UPS;monitoring unit, and routine operation & maintenance of the UPS;
in addition, it introduces the operating principles of the UPS, andin addition, it introduces the operating principles of the UPS, and
the load capacity calculation.the load capacity calculation.
Note:Note:
After reading the two manuals, please store them properlyAfter reading the two manuals, please store them properly
for reference purpose.for reference purpose.
Caution:Caution:
Both the input voltage and output voltage of the UPS areBoth the input voltage and output voltage of the UPS are
high voltages. Improper operations can endanger personalhigh voltages. Improper operations can endanger personal
safety. Read this manual carefully before installation andsafety. Read this manual carefully before installation and
any operation, and please pay attention to the warningany operation, and please pay attention to the warning
signs and remarks on the equipment. Only professionalsigns and remarks on the equipment. Only professional
maintenance personnel is allowed to dismantle the UPSmaintenance personnel is allowed to dismantle the UPS
cabinet.cabinet.

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
iiii Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
What is in this Manual
What is in this Manual
This manual contains the following chapters/appendices:This manual contains the following chapters/appendices:
TTAA BBLLEE11CCH A P T E RH A P T E R //AAP P E N D I XP P E N D I X SSU M M A R YU M M A R Y
Chapter/Appendix SummaryChapter/Appendix Summary
Chapter
Chapter 1 1 Safety Safety Instructions Instructions Describes Describes safety safety precautions.precautions.
Chapter 2 Installation PreparationsChapter 2 Installation Preparations Describes the requirements before installingDescribes the requirements before installing
the equipment.the equipment.
Chapter Chapter 3 3 Equipment Equipment Installation Installation Describes Describes the the UPS UPS installation.installation.
Chapter Chapter 4 4 Electrical Electrical Connections Connections Describes Describes the the electrical electrical connections.connections.
Chapter 5 System CommissioningChapter 5 System Commissioning Describes the requirements and methods ofDescribes the requirements and methods of
system commissioning.system commissioning.
Appendix A Background Monitoring Appendix A Background Monitoring Describes background moDescribes background monitoring modes.nitoring modes.

About this ManualAbout this Manual
Confidential and Proprietary Information of Confidential and Proprietary Information of ZTE CORPORATIONZTE CORPORATION iiiiii
Typographical Conventions
Typographical Conventions
ZTE documents use the following typographical conventions.ZTE documents use the following typographical conventions.
TTAA BBLLEE22TTY P O G R A P H I C A LY P O G R A P H I C A L CCO N V E N T I O N SO N V E N T I O N S
Typeface MeaningTypeface Meaning
Italics
Italics References to other guides and documents; parameter valuesReferences to other guides and documents; parameter values
“Quotes” “Quotes” Links on screensLinks on screens
BoldBold Menus, menu options, input fields, radio button Menus, menu options, input fields, radio button names, check boxes,names, check boxes,
drop-down lists, dialog box names, window namesdrop-down lists, dialog box names, window names
CAPS CAPS Keys Keys on on the the keyboard keyboard and and buttons buttons on on screens screens and and company company namename
CCo no ns ts t a na ntt
wwiiddtthh
Text that you type, program code, files and directory names, andText that you type, program code, files and directory names, and
function namesfunction names
[ [ ] ] Optional Optional parametersparameters
{ }{ }Mandatory parametersMandatory parameters
| | Select Select one one of of the the parameters parameters that that are are delimited delimited by by itit
Note: Provides additional information about a certain topicNote: Provides additional information about a certain topic
Checkpoint: Indicates that a particular step needs to be checkedCheckpoint: Indicates that a particular step needs to be checked
before proceeding furtherbefore proceeding further
Tip: Indicates a suggestion or hint to make things easier or moreTip: Indicates a suggestion or hint to make things easier or more
productive for the readerproductive for the reader

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
iviv Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
Safety Signs
Safety Signs
TTAA BBLLEE33SSAA FFEETTYYSSI G N SI G N S
Safety Safety Signs Signs MeaningMeaning
Danger: Indicates an imminently hazardous situation, which if not
Danger: Indicates an imminently hazardous situation, which if not
avoided, will result in death or serious injury. This signal wordavoided, will result in death or serious injury. This signal word
should be limited to only should be limited to only extreme situations.extreme situations.
Warning: Indicates a potentially hazardous situation, which if notWarning: Indicates a potentially hazardous situation, which if not
avoided, could result in death or serious injury.avoided, could result in death or serious injury.
Caution: Indicates a potentially hazardous situation, which if notCaution: Indicates a potentially hazardous situation, which if not
avoided, could result in minor or moderate injury. It may also beavoided, could result in minor or moderate injury. It may also be
used to alert against unsafe practices.used to alert against unsafe practices.
Erosion: Beware of erosion.Erosion: Beware of erosion.
Electric shock: There is a risk of electric shock.Electric shock: There is a risk of electric shock.
Electrostatic: The device may be Electrostatic: The device may be sensitive to static electricity.sensitive to static electricity.
Microwave: Beware of strong electromagnetic field.Microwave: Beware of strong electromagnetic field.
Laser: Beware of strong laser beam.Laser: Beware of strong laser beam.
No flammables: No flammables can be No flammables: No flammables can be stored.stored.
No touching: Do not touch.No touching: Do not touch.
No smoking: Smoking is forbidden.No smoking: Smoking is forbidden.

About this ManualAbout this Manual
Confidential and Proprietary Information of ZTE CORPORATIONConfidential and Proprietary Information of ZTE CORPORATION vv
How to Get in Touch
How to Get in Touch
The following sections provide information on how to obtain supportThe following sections provide information on how to obtain support
for the documentation and the software.for the documentation and the software.
Customer SupportCustomer Support
If you have problems, questions, comments, or suggestionsIf you have problems, questions, comments, or suggestions
regarding your product, contact us by e-mail atregarding your product, contact us by e-mail at support@zte.com.cnsupport@zte.com.cn..
You can also call our customer support center at (86) 755 26771900You can also call our customer support center at (86) 755 26771900
and (86) 800-9830-9830.and (86) 800-9830-9830.
Documentation SupportDocumentation Support
ZTE welcomes your comments and suggestions on the quality andZTE welcomes your comments and suggestions on the quality and
usefulness of this document. For further questions, comments, orusefulness of this document. For further questions, comments, or
suggestions on the documentation, you can contact us by e-mail atsuggestions on the documentation, you can contact us by e-mail at
doc@zte.com.cndoc@zte.com.cn; or you can fax your comments and suggestions to; or you can fax your comments and suggestions to
(86) 755 26772236. You can also explore our website at(86) 755 26772236. You can also explore our website at
http://support.zte.com.cnhttp://support.zte.com.cn, which contains various interesting, which contains various interesting
subjects like documentation, knowledge base, forum and servicesubjects like documentation, knowledge base, forum and service
request.request.

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
vivi Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
This page is intentionally blank.
This page is intentionally blank.

Confidential and Proprietary Information of Confidential and Proprietary Information of ZTE CORPORATIONZTE CORPORATION 11
C h a p t e r
C h a p t e r 11
SSaafefety Ity Insnstrtrucuctitiononss
This chapter describes the safety instructions for the installation,This chapter describes the safety instructions for the installation,
maintenance and operation of the UPS.maintenance and operation of the UPS.
Note:Note:
Always read the safety instructions before any Always read the safety instructions before any operation.operation.
Safety instructions described in this manual are only supplementarySafety instructions described in this manual are only supplementary
to the local safety specifications.to the local safety specifications.
This equipment involves high temperature and high voltages. OnlyThis equipment involves high temperature and high voltages. Only
qualified professionals can install, operate and troubleshoot thequalified professionals can install, operate and troubleshoot the
equipment. The installation, operation and maintenance of thisequipment. The installation, operation and maintenance of this
equipment must comply with local safety specifications and relatedequipment must comply with local safety specifications and related
operating procedures to reduce the risk of injuries or equipmentoperating procedures to reduce the risk of injuries or equipment
damage.damage.
ZTE shall not bear any liabilities incurred by violation of the universalZTE shall not bear any liabilities incurred by violation of the universal
safety operation requirements or violation of the safety standards forsafety operation requirements or violation of the safety standards for
designing, manufacturing and using the equipment.designing, manufacturing and using the equipment.

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
22 Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
Electric shock:
Electric shock:
The high voltage danger exists in the installation andThe high voltage danger exists in the installation and
maintenance of UPS system. Direct contact or contactmaintenance of UPS system. Direct contact or contact
with high voltage and mains supply through damp objectwith high voltage and mains supply through damp object
will cause vital danger. Pay attention to caution sings andwill cause vital danger. Pay attention to caution sings and
sentences on the equipment.sentences on the equipment.
1.1.Both the input voltage and output voltage of UPS are highBoth the input voltage and output voltage of UPS are high
voltage. Direct contact or contact with high voltage and mainsvoltage. Direct contact or contact with high voltage and mains
supply through damp object will cause vital danger.supply through damp object will cause vital danger.
2.2.The UPS has multiple power supplies. Switch off AC power andThe UPS has multiple power supplies. Switch off AC power and
DC power before maintenance. Even if all power supplies areDC power before maintenance. Even if all power supplies are
switched off, the internal capacitance of UPS will have charge onswitched off, the internal capacitance of UPS will have charge on
it. So, wait for the release of charge for more than 10 minutesit. So, wait for the release of charge for more than 10 minutes
before dismantling the cabinets.before dismantling the cabinets.
It is recommended to check the power input of UPS and theIt is recommended to check the power input of UPS and the
internal parts that might be contacted with a voltmeter beforeinternal parts that might be contacted with a voltmeter before
maintenance, to ensure that all power supplies are switched offmaintenance, to ensure that all power supplies are switched off
and in the safe state.and in the safe state.
3.3.Do not wear any conductive object such as watch, hand chain,Do not wear any conductive object such as watch, hand chain,
bracelet and finger ring, during operations.bracelet and finger ring, during operations.
Caution:Caution: Use special tool.Use special tool.
Special tool is a must in the high voltage and AC powerSpecial tool is a must in the high voltage and AC power
operations. Before operation, make sure that all the toolsoperations. Before operation, make sure that all the tools
are insulated, for example, wrap metal part withare insulated, for example, wrap metal part with
insulating tape.insulating tape.
Danger:Danger:
Never drilll on the UPS cabinet without authority.Never drilll on the UPS cabinet without authority.
Improper drilling will damage the components and cablesImproper drilling will damage the components and cables
in the cabinet and the metal scraps will drop into thein the cabinet and the metal scraps will drop into the
cabinet and cause short circuit.cabinet and cause short circuit.

Chapter 1 - Safety InstructionsChapter 1 - Safety Instructions
Confidential and Proprietary Information of Confidential and Proprietary Information of ZTE CORPORATIONZTE CORPORATION 33
Electric shock:
Electric shock:Never perform any operation duringNever perform any operation during
lightning storm.lightning storm.
Never perform high voltage and AC power operations orNever perform high voltage and AC power operations or
operations on conducive objects during lightning storm. Inoperations on conducive objects during lightning storm. In
addition, take measures for lightning protection andaddition, take measures for lightning protection and
grounding in advance to avoid equipment damage due togrounding in advance to avoid equipment damage due to
lightning storm.lightning storm.
Danger:Danger:
Never connect and disconnect live power cables. Before theNever connect and disconnect live power cables. Before the
operations to power cable, switch off the UPS and makeoperations to power cable, switch off the UPS and make
sure that the cables and cable labels comply with thesure that the cables and cable labels comply with the
installation requirements.installation requirements.
Caution:Caution: Safety precautions for battery.Safety precautions for battery.
Use the batteries of the same model; otherwise,Use the batteries of the same model; otherwise,
battery will be damaged.battery will be damaged.
Improper operations of battery will cause danger. AvoidImproper operations of battery will cause danger. Avoid
short circuit and overflow of electrolyte in operation. Theshort circuit and overflow of electrolyte in operation. The
overflow of electrolyte may damage the equipment. It willoverflow of electrolyte may damage the equipment. It will
corrode metal object and circuit board, damage thecorrode metal object and circuit board, damage the
equipment and cause short circuit.equipment and cause short circuit.
Warning:Warning:
Keep the screws and tools properly and do not drop themKeep the screws and tools properly and do not drop them
onto the fan; otherwise, it will damage the fan or relevantonto the fan; otherwise, it will damage the fan or relevant
equipment.equipment.
Caution:Caution:
It is not recommended to use UPS to power inductive load,It is not recommended to use UPS to power inductive load,
such as printer and duplicating machine. Never use UPS tosuch as printer and duplicating machine. Never use UPS to
power conductive load with high surge current, such as airpower conductive load with high surge current, such as air

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
44 Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
conditioner, blower, starter, electric drill, motor and fluorescent lamp, to
conditioner, blower, starter, electric drill, motor and fluorescent lamp, to
avoid UPS damage.avoid UPS damage.
Caution:Caution: Keep good ventilation.Keep good ventilation.
Maintain good ventilation by keeping the UPS ventilationMaintain good ventilation by keeping the UPS ventilation
hole and fan clean..hole and fan clean..

Confidential and Proprietary Information of Confidential and Proprietary Information of ZTE CORPORATIONZTE CORPORATION 55
C h a p t e r
C h a p t e r 22
IInsnstatallllaatition on PPreprepaararatitiononss
This chapter describes preparation requirements for installing the
This chapter describes preparation requirements for installing the
UPS equipment.UPS equipment.
Flow DescriptionFlow Description
The installation flow is shown inThe installation flow is shown in Figure 1Figure 1..
Note:Note:
Only qualified personnel have the authority to install andOnly qualified personnel have the authority to install and
debug the UPS.debug the UPS.

ZXUPS S60ZXUPS S606/S610 6/S610 (V1.1) Installation (V1.1) Installation ManualManual
66 Confidential and Proprietary Information oConfidential and Proprietary Information of ZTE CORPORATIONf ZTE CORPORATION
F
FI G U R EI G U R E 11IIN S T A L L A T I O NN S T A L L A T I O N FFLLOOWW
StartStart
Unpack forUnpack for
inspectioninspection
Check the Check the installatiinstallationon
sitesite
Install batteryInstall battery
cabinetcabinet
Connect cablesConnect cables
Debug the systemDebug the system
Perform finalPerform final
acceptance testacceptance test
PreliminaryPreliminary
acceptanceacceptance
FailFail
PassPass
PassPass
FailFail
Install the UPSInstall the UPS
cabinetcabinet
EndEnd
Installation checkInstallation check
This manual suits for next models
1
Table of contents
Popular UPS manuals by other brands

ABB
ABB PowerValue 11T G2 Series user manual

Salicru
Salicru UNINTERRUPTIBLE POWER SUPPLY ADVANCE series User's manual, installation and start-up

Somogyi Elektronic
Somogyi Elektronic Home UPS1000 instruction manual

socomec
socomec NETYS RT Installation and operating manual

Ever
Ever Superline 6k instruction manual

Borri
Borri UPSaver 400 kVa operating manual