INSTALLATION
The boiler must be installed on a horizontal work surface with sufficient strength to support its weight.
Locate in an area where there is adequate space to use the boiler safely (e.g. free from risk of congestion and
tripping hazards).
Do not block ventilation holes in boiler case
CONNECTION TO MAINS WATER SUPPLY:
Connect the WRAS approved water filling hose supplied (3/4” BSP) to the inlet connection point at the back
of the boiler and the other end to the mains water supply, via an accessible isolating tap with a 3/4” BSP
thread.
IMPORTANT: If micro-bore pipe is used instead of the inlet hose supplied, the size must be
minimum OD 3/8” (10mm).
The water supply must have a pressure not exceeding 7bar (96psi), and no lower than 2bar (28psi) NOTE: If
your water pressure exceeds 7bar, fit a suitable pressure reduction valve.
We regret that AA First cannot be held responsible for any machine malfunctions if the water pressure exceeds that stated. If in
doubt, consult your water supply company.
ELECTRICAL CONNECTION:
The boiler must be Earthed.
Your machine is supplied with a standard 13amp bonded plug with a 13amp fuse.
OVERFLOW (WASTE CONNECTION):
The drip-tray has a limited capacity and is designed to handle small spillages and drips only. Wherever
possible, we strongly recommend that it is connected to a permanent waste outlet using the fitting kit
provided.
If preferred, and as an alternative, the overflow-outlet which enters the front drip-tray, can be blocked off
using the tapered rubber bung provided and the alternative overflow-outlet at the back of the machine
(underside), connected to a permanent waste/drain.
IMPORTANT: Whichever overflow connection is chosen, the diameter of the pipe used must be no less than
15mm.
Failure to connect the overflow-outlet to a permanent waste or drain, could lead to property
damage damage from flooding.
If in all circumstances, it is absolutely not possible to direct the boiler overflow-outlet to a permanent waste
or drain, then the mains water supply to the boiler should be isolated and the unit switched off whenever it
is left unattended for long periods (e.g. overnight).
In addition, a resettable ‘Water Block’ device (Pt. No: HE45004), must be installed in the water supply to the
AA First boiler, to minimise any potential for water leakage in the event of a system malfunction.
Whilst every reasonable precaution is taken to prevent an overflow, AA First cannot be held responsible
for any damage caused as a result of incorrect installation or blockage of the overflow or failure to direct
the overflow to a safe outlet.