
Agilent 8700 LDIR Chemical Imaging System Long Term Shut Down and Start Up Instructions
Figure 2 Rear of the 8700 LDIR
The purge supplied to the instrument closure MUST remain on. Ensure that purge gas connection
is not disconnected. Pressure should remain at 20 psi (138 kPa) and purge flow rate at a
minimum of 10 L/min (20 ft3/hr).
7Close open applications and shut down the PC.
Start up the system
To start up the system:
1Check that the purge gas supply is on and remain at the required rate.
2Switch on the rear power switch to connect the instrument to mains power. The LED indicator
on the front power button will turn yellow.
3Push the power button to turn on the instrument. The LED indicator will turn green.
4Turn on the PC. Ensure that the communication cable is connected between the PC and the
instrument.
5Double-click the Agilent Clarity desktop icon to start the Agilent Clarity software.
6Let the 8700 LDIR warm up for 10 minutes before starting an analysis
www.agilent.com
© Agilent Technologies, Inc. 2020
Edition 1, 4/20