
Unscrew the front nut (1) on the valve cable and insert the
cable (4) through the slot on the back side of AG250-303
pedal. The rear nut (3) remains at the end of the thread (2).
Adjust cable holder (2) for proper pedal operation and
secure its position with nuts (1) and (3). Use 3/32 wrench
for tightening nuts(M5x0.8mm).Control cable (4) should be
snug. (FIG.1)
1 – Floor pedal
Installation Procedures
AG250-303
LIST OF PARTS ENCLOSED
The AG250-303, in combination with
AG250-002 valve, provides hands-free
faucet operation. Valve is ordered
separately.
Please read the instructions once through before starting.
PEDAL INSTALLATION INSTRUCTIONS
-OVER-
AG250-002
Cold/Hot Potable Water
Mechanical Valve
Pass cable from the AG250-002 valve
through an opening under the cabinet plate and
connect it to the pedal AG250-303.
1.
FIG. 1
3
1
2
4
5
6
Verify that valve actuating cable is inside the
valve receptacle( FIG.2)
FIG. 2
Insert valve cable end T-bar (5) into the pedal
lever (6) (FIG.3)
2 – #6x1 mounting screws
FIG. 3
2 – 1"x3" Double sided adhesive pads
2.