THE AIRIUS SYSTEM HANGING/MOUNTING GUIDELINES
6. PLACEMENT OF THE AIRIUS SYSTEM
Floors plans, mezzanines, oce location, machinery, people placement, plumbing,
lighting systems, duct work, electrical systems, natural light/air systems, indoor cranes,
doors, windows, ventilation and re suppression systems are all factors in properly
locating the AIRIUS SYSTEM in the ceiling.
Mezzanines -The AIRIUS SYSTEM can be hung at an angle to throw accumulated heat
out to a larger space, or hang the AIRIUS SYSTEM near the mezzanine out in the larger
space to remove heat and balance room temperature.
Oce - Use smaller models to control individual oce spaces, or larger units to
control common areas, eliminate hot and cold spots, create circulation, eliminate
electrical space heaters and reduce employee temperature related issues.
6
Unistrut or Ceiling Beam
240 v Plug
(single phase)
Receptacle Rated
240 VAC
300 VAC Rated Cord
Furnished 2m
Cord Secured
Note: All Air Pears come without a fitted plug and must
have a plug fitted by the installer.
Chains should be rated @ 20.5 Kgs each
(Not supplied).
Chains can be attached using caribiners,
bolts, Chemsets or Dyna Bolts.
For Cooling the Airius Air Pear fan should be located to suit client's
requirements. Suggested locations are from just under the ceiling
or closer to the oor to ensure suitable air cooling ow.
For Heating or Conditioned Spaces the Airius Air Pear should be
securely installed as close as possible to the ceiling.
The Airius discharge air column should have an unobstructed
passage to the oor. The Airius unit should not be mounted
directly in front of heat ducts, vents or any other high heat source.
The units must not be located closer than 3 metres
to return air ducts in conditioned spaces.
Cable Tie
Exhaust
Intake
Airius Air Circulation
& Destratification Fan
When attaching do not hard connect fan to support. Always ensure
there is a small length of chain between fan connection and support.
MAXIMUM DESTRATIFICATION SPACING PER FAN
AIRIUS PEARL S1
Height = 7 m
Coverage = 80 m
The AIRIUS SYSTEM
Weight - 3.75 kg
Height - 28 cms
Diameter - 28.6 cms
AIRIUS PEARL S2
Height = 5 m
Coverage = 50 m
The AIRIUS SYSTEM performs best when installed such that the air stream/exhaust
from the nozzle is unimpeded to the oor. This will insure maximum circulation and
Thermal Equalization. Each System is designed to cover approximately 80 m2 from its
designed ceiling height, which is about a 10 metre diameter circle for S1 Pearl . The
density of the placement is a direct relationship to eectiveness,performance
and savings.
Floor Plans - Sketch out the oor plan of the facility, divide it graphically into 80 m
squares or 50 m squares for S2 pearl and as closely as possible place an AIRIUS
SYSTEM in the center of each square of the grid. Adjust placement to accommodate.