
5
7
Lift Winch Deployment
43
6
ba c d e
b da
4
c e
Quick Reference
www.antennamast.com
Do not duplicate, alter, or copy without the written consent of e Will-Burt Company. © Copyright 2013 e Will-Burt Company
Version - TP-5001001-00 Date - 04/03/14 Remarks - Original Release
1. Safe Installation
a. Level Site (maximum 5° slope)
b. Ensure adequate overhead ground clearance
2. Set up the Tripod
a. Extend legs and tighten
b. Pull spring loaded pin
c. Open and level
d. Stake
3. Insert Top Tube
a. Tighten clamp
4. Install Accessories on Top Tube
a. Install payload accessories if required
b. Install payload(s)
c. Install guylines if required
5. Install Lift Winch
a. Install orange winch into tripod receiver and secure with orange hold down clamp
b. Crank winch counter-clockwise
c. Feed cable through orange base plate
d. Attach cable end to black key
e. Secure key to tripod leg braces
6. Raise the Mast
a. Place mast tube onto orange lift plate
b. Crank winch clockwise to raise tube until secured into tube in tripod
c. Loosen clamp
d. Raise tube until hand width remains
e. Tighten clamp
f. Repeat
7. Install Base Tube
a. Attach bottom of base tube to orange base plate
b. Raise and attach to last mast tube
c. Loosen clamp and lower to ground
d. Tighten clamp
e. Stake base plate
8. Stake and Tighten Guy Lines (Refer to the opposite side for guying instructions)