
Lombak Single Vanity
Assembly Instructions
Page 2 of 4Rev 1 05.10.19
EXCLUSIVE AND CONFIDENTIAL PROPERTY OF URBAN OUTFITTERS, INC.
© 2019 UO, Inc. All rights reserved, including all applicable copyright, design and patent rights. Any
unauthorized reproduction, adaptation, distribution or other infringement will be prosecuted.
READ ALL INSTRUCTIONS BEFORE ASSEMBLY!
1. Storage
A. Keep marble top in its crate until installation
B. Store Crate Vertically in a place safe from damage
C. Do not stack anything on top of the crate.
2. Opening Crate
A. Before unpacking make sure you are ready for installation and have all of the following.
1. 2 people to help lift the heavy top
2. Vanity installed according to instructions plumb to the wall and oor
3. Make sure the top is the correct one for the vanity
4. Tools and Materials:
A. Flat, non-abrasive work surface such as a blanket or cardboard
B. A level
C. Phillips head screwdriver
D. Caulk/Sealant
B. With help carefully Lay the crate down making sure that you do not drop it
This is the only time the crate should be horizontal.
C. Remove the metal bands.
D. Unscrew the slats/Lid and remove.
E. Examine the marble top for defects. Wipe clean with a soft cloth.