Arena Parquet 5Gc User manual

Installationsanvisning Arena Parkettgolv 5Gc
Lättmonterat!
Nu med ännu bättre klicksystem.
Lättare läggning – snabbare läggning – starkare fog.
Lettmontert!
Nå med enda bedre klikksystem.
Lettere å legge – raskere å legge – sterkere klikkfuge.
Easy installation!
Now even better click system.
Easier installation – faster installation – stronger joint.
Łatwy montaż!
Teraz jeszcze lepsze złącze klick.
Łatwiejszy montaż – szybszy montaż – mocniejsze złącze.
Installation instruction Arena Parquet 5Gc
Monteringsanvisninger for Arena Parkett 5Gc
Instrukcja montażu deski warstwowej Arena ze złączem 5Gc
EN
PL
SV
NO
www.arenagolv.se
0168
EN
PL
SV
NO
12
6
39 > 48 h 18 ˚C
64,4 F
>
90
60 80
70
%
50
Products ≤ 1100 mm min. 300 mm
Products ≤ 2200 mm min. 500 mm
1
6
11
3
8
13
2
7
12
4
5
9 10
14

Installationsanvisning Arena Parkettgolv 5Gc
Läs läggningsanvisningen noggrant igenom innan du påbörjar arbetet. Parke med 5Gc-fogsystem ska inte läggas ihop med brädor med e annat system än 5Gc eller med brädor av en annan bräd-
tjocklek. Inför arbetet bör du a på brädorna och planera si önskade mönster. Varje bräda bör kontrolleras i bra ljus både före och under arbetets gång. Eventuella skador som märks när golvet har
monterats kan inte reklameras. Skadade plankor ska returneras ll återförsäljaren där de byts mot nya. Reklamaoner för följande defekter godkänns inte: – Bruksslitage, mekaniska skador orsakade av
vanlig användning (repor p.g.a. sand, märken i golvet och sprickor p.g.a. inträngande vätskor o.s.v.), stegljud p.g.a. vanlig användning, färgskiningar, solblekning. – Trä är e naturmaterial och därför kan
det färdiglagda golvets färg och mönster avvika från provbiten som visas i buken. – Skador på golvet orsakade av en felakg installaon, fukt eller intrycksmärken i ytan orsakade av möbler eller tap-
pade föremål utgör ingen anledning ll reklamaon. För a undvika intrycksskador då möblernas tryck mot golvet är för stort bör man använda lämpliga maor respekve möbeltassar. – Golvbuntar kan
innehålla korta brädor, så kallade ”startbrädor”. – Parkeen är inte avsedd a läggas utomhus eller i utrymmen med hög fukghet (tvästuga, badrum, uterum).
Allmän informaon: De inköpta golvbuntarna skall lagras i oöppnade emballage vågrä i det rum där de skall monteras minst 48 mmar innan golvläggningen påbörjas. Golvet skall läggas på e torrt, rent,
fast och plant underlag. Det monterade golvets totala yta bör inte översga 8 meter på bredden och 20 meter på längden (bild 7). Annars måste en rörelsefog lämnas. När du installerar golvet i era rum ska
det läggas i varje rum separat. Samma gäller asymmetriska golvytor i e och samma rum. Parkeen är avsedd a användas vid relav lufukghet på 30-60% och temperatur mellan +18 och +22 °C. Mät
fukthalten i underlaget och skriv upp värdet innan du börjar lägga golvet. Högsta llåtna fukthalt är: 2% för betongunderlag (CM-metod), 0,5% för anhydritunderlag (CM-metod) och 8% för träunderlag. Vi
rekommenderar a du använder ångspärr (0,2 mm polyetenfolie) för alla typer av betongunderlag om du lägger golvet ytande. Ångspärren skall läggas med minst 200 mm överlapp. Skarvarna skall tejpas
ihop. Du börjar golvläggningen med a lägga underlaget: Används grålumppapp eller foam läggs bitarna/våderna kant i kant. Om du använder skivor av naturkork eller träis ska du lämna e mellanrum
på 2 mm mellan skivorna och på 15 mm mellan skivorna och väggen (bild 6). Använd inte spännband när du lägger parke.
Flytande läggning: Tack vare den unika lösningen som 5Gc-fogsystem är (bild 1) lägger du golvet snabbare och enklare utan a behöva använda specialverktyg. Glöm inte a alld lämna en rörelsefog
på ca 10-15 mm mellan golvet och väggen, eller andra fasta föremål (bild 7). Den första raden ska läggas från rummets vänstra sida (bild 8) med notsidorna ut mot rummet. Brädorna läggs ner enligt bild
9 och 10, dvs. den högra ändskarven läggs ovanifrån på den vänstra. Se ll a brädorna ligger tä inll varandra medan du viker ned den högra brädan. Brädans kortände skall skjuta så a den ligger an
mot föregående brädas kortände i hörnet. Vik ner brädan ll samma nivå som föregående bräda i samma rad. Sedan räcker det a trycka eller knacka lä på den kortända som just lagts. Knacka brädorna
lä på långsidan med en slagkloss för a vara säker a de ligger rä på plats (bild 12). Slutbrädan bör kapas ll rä längd. Nästa rad börjar man med den bit som blev över om den inte är kortare än 300
mm. Kom ihåg a ändskarvar i bredvidliggande rader förskjuts minst 300 mm när du lägger 1,1 m brädor och 500 mm när du lägger 2,2 m brädor (bild 11). När du har lagt hela golvet ska du ta bort alla
distansklossarna och dölja fogarna med lister. Golvet kan användas direkt eer a listerna har monterats.
A limma parke ll underlaget: 1. Täck brädan med lim med hjälp av en spackel. Limmet ska täcka minst 60% av brädans yta. 2. Underlaget ska grundas och primern måste motsvara följande krav:
Beständighet mot dragkra på minst 1 MPa, beständighet mot tryckkra på minst 25 MPa. Använd endast enkomponent polyuretanlim eller syntetlim lämpliga för limning av lackade och oljade trägolv
avsedda för golvvärme, och som har rekommenderats av llverkaren. ANVÄND INTE DISPERSIONSLIM!
A lägga parke på golvvärme: Oberoende av valt golvvärmesystem ska en rapport skrivas, vilken bekräar uppvärmningen av undergolvet under 21 dagar innan trägolvet monteras. Rapporten måste un-
dertecknas av en behörig golvläggare. Om golvet inte läggs omedelbart eer a rapporten skrivits, ställer du uppvärmningen på 21°C cirka två veckor innan du ska lägga golvet och behåller temperaturen
också när du lägger golvet. Använd grålumppapp eller foam som är upp ll 3 mm tjock som underlag. Observera: Garann gäller inte om det har uppstå skador p.g.a. a golvet har uorkats/överheats.
Temperaturen på trägolvets yta får ej överskrida 27°C. Förvissa dig om a du följt branschriktlinjerna för golvvärme. Dessa kan du läsa under www.arenagolv.se.
Skötsel och renovering: Parkeen har slutbehandlats med UV-härdad lack eller UV-härdad olja eller naturolja på fabriken. När du renoverar lackade golv rekommenderar vi a du använder polyuretanlack
i enlighet med llverkarens anvisningar. Observera: Renoveringen ska uöras av professionella golvläggare. Golvet kan börja användas fullt ut cirka 7 dagar eer renoveringen. Vid appliceringen ska verktyg
som är avsedda för polyuretanbaserade produkter användas. När golvet är lagt och när det används rekommenderar vi a du använder lämpliga vård- och rengöringsmedel avsedda för olika golvtyper.
För a yerligare skydda golvet rekommenderar vi a du eer installaonen av oljade brädor applicerar e extra oljeskikt som matchar brädornas färg. En regelbunden skötsel av oljade golv döljer spår
av läare bruksslitage. Trägolvens största ende är vaen och sand. Om dessa har hamnat på golvet ska de tas bort omedelbart men försikgt. Möbeldelar som trycker mot golvet ska påföras lassar
för a skydda golvet.
SV
Monteringsanvisninger for Arena Parkett 5Gc
Før du starter arbeidet, bør du lese denne bruksanvisningen nøye. Parke med 5Gc-klikksystem kan ikke legges sammen med bord som har annen type tverrskjøt enn 5Gc og annen bordtykkelse.
Før du starter monteringen, må du inspisere bordene og planlegge hvordan de skal legges. Hvert bord bør kontrolleres i godt lys både før og under arbeidets gang. Hvis du legger et gulv av bord med synlige
defekter gjelder ikke garanen. Skadede bord skal returneres l salgsstedet og byes i nye. Følgende gir ikke re l reklamasjon: Gulv med skader som oppstår under monteringen, naturlig gulvslitasje,
mekaniske skader under bruk (riper fra sand, bulker og sprekker på grunn av væskesøl osv.), trinnlyd forbundet med vanlig bruk, fargervariasjoner og naturlige fargeendringer på grunn av solbleking. Tre er
et naturmateriale og derfor kan det ferdiglagte gulvets fargetone og mønster avvike fra prøven i bukken. Skader på gulvet forårsaket av monteringsfeil, fukt eller inntrykksmerker i overaten forårsaket av
möbler eller mistede gjenstander gir ikke reklamasjonsre. For å unngå inntrykksskader der møblenes trykk mot gulvet er for stort, bør man benye ltknoer eller egnede maer. Pakkene kan inneholde
korte bord som produsenten har ment at du skal kunne bruke som ”startbord”. Gulvbord bør ikke monteres utendørs eller i rom med høy lufukghet (f.eks. vaskerom eller bad).
Generell informasjon: De innkjøpte gulvpakkene skal før legging lagres vannre og i uåpnede pakker i minst 48 mer i det rom de skal legges. Gulvet skal legges på et rent, fast og tört underlag,Ved mon-
teringen bør gulvets totale størrelse ikke oversge 8 meter i bredden og 20 meter i lengden (bilde 7). I motsa fall bør du legge inn ekspansjonsfuger mellom de enkelte atene. Når du legger gulvet i ere
rom, skal det legges i hvert rom separat. Det samme gjelder asymmetrisk overater i e rom. Parkeen er beregnet for bruk ved en relav lufukghet på 30 – 60% og en temperatur på mellom 18 – 22
°C. Før du installerer gulvet, bør du alld måle underlagets fukghet og skrive opp verdiene før du begynner å legge gulvet. Underlagets høyeste llae fukghet: Betong 2% iht. CM-metoden, 0,5% for
anhydriunderlag, og 8% for treunderlag. Det anbefales at du benyer diusjonste folie, (0,2 mm polyetenfolie) når du legger gulvet ytende på alle typer betongunderlag. Den diusjonstee folien skal
legges med minst 200 mm overlapp. Dessuten bør kantene tapes sammen. Du begynner gulvleggingen med å legge underlaget. Ved bruk av grålumspapp / gulvunderlagspapp skal den legges kant i kant.
Dersom du benyer plater av naturkork eller sponplater skal det väre et mellomrom på 2 mm mellom disse platene og på 15 mm ut mot veggen (bilde 6).
Montering av ytende gulv: Takket være den unike 5Gc-klikkløsningen (bilde 1) kan du montere gulvet raskere, enklere og uten spesialverktøy. Husk alld å la det være en ekspansjonsfuge på ca. 10-15
mm mellom gulv og vegger eller andre faste gjenstander (bilde 7). Begynn monteringen ved å legge en rad av bord fra venstre side av rommet (bilde 8) med notsiden ut mot rommet. Bordene legges ned
ifølge bilde 9 og 10, dvs.det høyre endestykket legges ovenfra på det venstre. Se l at bordene ligger te innl hverandre samdig som du viker ned det høyre bordet. Bordets kortende skal sees slik at
den ligger ann mot forrige bords kortende i hjørnet. Vik ned bordet l samme nivå som foregående bord i samme rad. Så holder det å trykke eller banke le på den kortende som akrua er lagt. Banke
bordene le på langsiden med en slagkloss for å være sikker på at de ligger re på plass (bilde 12). Slubordet bør kappes l re lengde. Neste rad begynner man med den bit som ble l overs om den
ikke er kortere enn 300 mm. Husk at skjøtene i rader ved siden av foryes minst 300 mm når du legger 1,1 m bord og 500 mm när du legger 2,2 m bord (bilde 11). Eer at gulvet er lagt, kan du erne
avstandskilene. Ekspansjonsfugene dekkes med overgangslister. Gulvet kan brukes umiddelbart eer montering av lister.
Liming av planker l underlaget: 1. Fordel limet med hjelp av en sparkel. Limet skal dekke minst 60% av bordets overate. 2. Underlaget skal grunnes og primeren må oppfylle fölgende krav: Kunne tåle
trekkkra på minst 1 Mpa mot trykkkra på minst 25 MPa. Beny kun enkomponents polyuretan- eller syntesk lim som er anbefalt for liming av lakkerte og oljede gulv, og som er beregnet for gulvvarme
og anbefalt av produsenten. IKKE BRUK DISPERSJONSLIM!
Montering av bord på gulvvarme: Uavhengig av valgt varmesystem krever gulvlegging på gulvvarme at du utarbeider en rapport over 21-dagers oppvarming av gulvvarmesystemet för tregulvet legges.
Rapporten må underskrives av den ansvarlig gulvlegger. Hvis gulvet ikke monteres umiddelbart eer at rapporten er skrevet, må du ca. to uker før montering slle oppvarmingen på 21°C og beholde tem-
peraturen også når du legger gulvet.. Som underlagsmateriale må du bruke grålumspapp / gulvunderlagspapp eller en foam som er opp l 3mm tykk. Merk: Garanen gjelder ikke dersom det har oppstå
skader p.g.a. uørking / overoppheng.Temperaturen på tregulvets overate skal ikke oversge 27°C. Påse at du følger bransjeretningslinjene for gulvvarme.Disse kan du lese under www.arenagolv.se.
Stell og vedlikehold: Parkeen er slubehandlet med UV-herdet lakk eller UV-herdet olje fra fabrikken. Til restaurering / oppussing av lakkerte gulv anbefaler vi polyuretanlakk iht. lakkprodusentens anvis-
ninger. Merk: Arbeidet bør overlates l fagfolk. Eer omlakking kan du begynne å anvende gulvet for fullt eer 7 dager. For påføringen av lakk bør du bruke verktøy laget for polyuretanbaserte produkter.
Eer gulvleggingen og under bruken anbefales det å bruke passende rengjørings- og vedlikeholdsmidler beregnet på gi gulvtype. Det anbefales at overaten, eer monteringen av oljede gulvbord,
beskyes ved å påføre et ekstra oljelag med lignende farge som gulvet. Periodisk og regelmessig vedlikehold av oljede gulv erner de små sporene eer daglig bruk. Tregulvets største ender er vann og
sand. Hvis gulvet utsees for slikt, bør sanden/vannet ernes forsikg. Møbler som står på gulvet skal utstyres med selvklebende ltknoer.
NO
Installation instruction Arena Parquet 5Gc
Before commencing work, please read carefully these installaon instrucons. Floorboards featuring the 5Gc transverse lock must not be laid with oorboards having a transverse lock dierent than 5Gc
or a dierent board thickness. Prior to laying, carefully inspect all oorboards and plan the laying paerns. All oorboards should be checked before and during installaon. Laying oorboards with visible
defects will render the warranty uncondionally void. Damaged oorboards should be returned to the point of sale in order to be exchanged for new ones. Claims will not be accepted for the following:
damage to the oorboards caused during installaon, normal wear and tear, mechanical damage during use (scratches from sand, indentaons and cracks due to ingress of liquids, etc.), noises associated
with normal use, variaons in colour, changes in shade over me due to exposure to sunlight. Wood is a natural material, therefore the ooring may dier in colour from the paern displayed in store.
Damage to ooring caused by improper installaon or humidity, does not constute grounds for a warranty claim. Damage resulng from failure to use protecon under furniture castors and legs such
as roll-stop protecve mats and felt pads in places where furniture legs exert pressure on the oor. The packets may contain short boards included as “starter boards.” Floorboards should not be installed
outdoors and in rooms with high humidity (e.g. laundry, bathroom).
General informaon: Acclimasaon; the oor has been dried beforehand to the opmum wood humidity level. For this reason, the ooring panels must be acclimased in their packaging for at least
48 hours to adapt to the local condions. Overall dimensions of the installed oor should not exceed 8 meters in width and 20 meters in length (g. 7). Otherwise, expansion gaps should be le between
the oor surfaces. When laying the oor, separate individual rooms or asymmetric surfaces in one room. The oorboards should be laid and used at 30% - 60% relave humidity and at room temperature
between +18°С and 24°C. Before installing the oor, measure suboor moisture content and record the results in a protocol. The maximum allowable moisture content: for concrete 2% (CM method),
anhydrite 0.5 % (CM method), and wood 8%. When installing oang oors, it is recommended to lay damp proof insulaon on all types of concrete suboors. Where a suitable polythene vapour barrier
is used, overlap any seams by at least 200 mm and securely tape to provide a seal. Flooring installaon should begin with the laying of the underlay: approved paperboard underlay or foam lays by joining
sheets at the edges; in case of natural cork or wood chip boards, leave 2mm gap between boards and 15 mm gap between the boards and the wall (g. 6). When installing the oorboards, do not use
the ooring straps.
Installaon of a oang oor: Thanks to the unique soluon which is the 5Gc frontal lock (g. 1) oor installaon becomes faster and simpler, and does not require any specialist tools. Always remember
to leave an expansion gap of about 15 mm between the oor and walls or other obstacles (Fig. 7). The rst row of oorboards should be laid from the le side of the room (Fig. 8) connecng front locks
by inserng the right lock onto the boom le lock (Fig. 9 and 10). Make sure that the boards are ght against each other when you fold down the right board. Two short ends of the boards have to be in
contact with each other in the corners. Fold down the board to the same level as the rst board in the same row. Then press or slightly knock the short end of the board. The oorboard is pressed against
the adjacent oorboard using a tapping block (g. 12). Begin laying the second row from the piece of board cut o from the rst strip, as long as it is no shorter than 300 mm. The passing arrangement of
the boards should also be borne in mind, i.e. the lateral joints should be at least 300 mm from one another while installing 1,1 m boards and 500 mm when installing 2,2 m (g. 11). When the ooring is
complete, the wooden spacer wedges should be removed and the gap concealed using skirng boards. The oor is suitable for use immediately aer the installaon of skirng boards.
Gluing the oorboards to the oor: 1. Distribute adhesive using trapezoidal trowel, so that the adhesive evenly covers at least 60% of the board. 2. The suboor should be primed and its strength must
meet the following condions: - peel strength of at least 1 MPa; - compression strength of at least 25 MPa. Only single component polyurethane or synthec adhesives are allowed, which are recom-
mended by the manufacturer for bonding of lacquered and oiled ooring suitable for underoor heang. DO NOT USE DISPERSION ADHESIVES!
Laying oorboards on underoor heang system: Whichever heang system is chosen, draw up a protocol conrming heang of the suboor for 21 days before installing the oorboards. The document
must be signed by a qualied ooring installer. Please visit www.hardwood-installaon.eu for heang instrucons and to download the protocol. If the oor is not installed immediately, re-set the heang
at 21°C about two weeks before the installaon and lay the oorboards at the same temperature. Approved paperboard underlay or foam up to 3mm should be used as underlay. Note: Warranty does
not cover defects arising from excessive drying/heang of the oorboards by subjecng the ooring to temperatures higher than those recommended (max 27°C on the surface. Make sure that the oor
is installed due to the ooring heang branch standards.
Care and regeneraon: Floorboards are factory nished with UV lacquer or UV oil or natural oil. In order to renovate and regenerate lacquered oorboards, the use of polyurethane lacquers in accord-
ance with the manufacturer’s guidelines is recommended. Note: The work should be entrusted to professionals. Intensive use of the ooring can start aer approximately 7 days. Tools designed for
polyurethane-based products should be used to apply the lacquer. Aer laying the oor and during its use it is recommended to use cleaning agents for oiled and varnished oors. For extra protecon, it
is recommended that aer installaon of oiled oorboards an addional layer of oil matching the colour of the board is applied. Regular care of oiled oors conceals minor wear and tear of everyday use.
The greatest enemies of wooden oors are water and sand. In case of soiling of the oor, these should be gently removed. Points of pressure should be protected with felt pads.
EN
Instrukcja montażu deski warstwowej Arena ze złączem 5Gc
Przed przystąpieniem do pracy prosimy o uważne przeczytanie niniejszej instrukcji montażu. Deska podłogowa posiadająca zamek poprzeczny 5Gc nie może być układana z deskami posiadającymi inny
rodzaj zamka poprzecznego niż 5Gc i inną grubością deski. Przed rozpoczęciem montażu należy obejrzeć deski i rozplanować wzór. Przed i w trakcie montażu należy kontrolować stan desek. Ułożenie
podłogi z desek z widocznymi usterkami spowoduje nieuwzględnienie roszczeń gwarancyjnych. Uszkodzone deski należy zwrócić do punktu sprzedaży w celu wymiany na nowe. Reklamacji nie podlega:
podłoga z uszkodzeniami powstałymi w trakcie montażu, naturalne zużycie podłogi, uszkodzenia mechaniczne w czasie użytkowania (zarysowania piaskiem, wgniecenia oraz spękania wskutek zalania
płynami, etc.), efekty akustyczne związane z użytkowaniem, zróżnicowana kolorystyka i naturalna zmiana barwy na skutek działania promieni słonecznych. Podłoga może różnić się wybarwieniem od
wzoru w punkcie sprzedaży. Uszkodzenia podłogi spowodowane niewłaściwym montażem lub działaniem wilgoci nie stanowią podstaw do reklamacji. Uszkodzenia powstałe z powodu nie stosowania
środków ochronnych pod elementami jezdnymi np. mat ochronnych roll-stop oraz zabezpieczenia punktowych miejsc nacisku (nogi mebli) za pomocą przyklejanych podkładek lcowych. W paczkach mogą
wystąpić deski krótkie, które producent przewidział jako „deski startowe”. Desek podłogowych nie należy montować na zewnątrz oraz w pomieszczeniach o podwyższonej wilgotności (np. pralnia, łazienka).
Informacje ogólne: Przed montażem zakupioną podłogę należy aklimatyzować przez minimum 48 godzin w pomieszczeniu, w którym będzie układana. Paczki należy złożyć poziomo i ich nie otwierać.
Podczas montażu całkowite wymiary kładzionej podłogi nie powinny przekroczyć 8 metrów szerokości i 20 metrów długości (rys. 7). W przeciwnym razie należy pomiędzy poszczególnymi powierzchniami
pozostawić szczeliny dylatacyjne. Kładąc podłogę należy również oddzielić poszczególne pomieszczenia i/lub asymetryczne powierzchnie w jednym pomieszczeniu. Układanie podłogi i eksploatacja powin-
na odbywać się przy wilgotności otoczenia 30-60% i temperaturze od +18÷22 °C. Zawsze przed montażem podłogi należy zmierzyć wilgotność podłoża, a wyniki pomiarów zachować w postaci protokołu.
Maksymalne dopuszczalne wilgotności podłoża: - betonowe do 2% wg metody CM, - anhydrytowe do 0,5 wg metody CM, - drewniane do 8%. Zalecane jest aby wszystkie rodzaje podkładów betonowych
posiadały izolację przeciwwilgociową w przypadku podłóg pływających. W przypadku stosowania folii należy stosować zakładkę 200 mm, a dodatkowo miejsca łączenia folii zabezpieczyć taśmą. Układanie
podłogi rozpoczynamy od ułożenia podkładu: tektury falistej lub pianki krawędziami na styk. W przypadku naturalnego korka lub płyt z wiór drzewnych zostawiamy pomiędzy nimi 2mm odstępu oraz
pomiędzy płytami a ścianą 15 mm (rys. 6) .
Montaż deski w systemie pływającym: Dzięki zastosowaniu unikalnego rozwiązania jakim jest zamek czołowy 5Gc (rys. 1) montaż podłogi staje się szybszy, prostszy i nie wymagający specjalistycznych
narzędzi do położenia podłogi. Zawsze należy pamiętać o pozostawieniu szczelin dylatacyjnych ok. 15 mm pomiędzy podłogą a ścianami lub innymi przeszkodami (rys. 7). Pierwszy, rozpoczynający montaż
podłogi rząd desek układamy od lewej strony pomieszczenia (rys. 8) łącząc zamki czołowe poprzez położenie prawego zamka na lewym dolnym (rys. 9 i 10). Należy się upewnić, że krótkie krawędzie sąsia-
dujących desek przylegają do siebie, gdy opuszczamy prawą deskę. Deski muszą stykać się ze sobą w rogu. Deskę opuszczamy, aby znalazła się na tym samym poziomie jak sąsiadująca deska w tym samym
rzędzie. Następnie wystarczy docisnąć lub lekko uderzyć z góry deskę, aby zatrzasnąć click na krótkiej krawędzi. Połączone deski należy lekko dobić na długiej krawędzi za pomocą dobijaka montażowego.
Montaż drugiego rzędu zaczynamy od odciętego kawałka deski z pierwszego pasa pod warunkiem, że jego długość jest nie mniejsza niż 300 mm. Należy również pamiętać o mijankowym układaniu desek
tzn. połączenia poprzeczne powinny być przesunięte względem siebie o min. 300 mm w przypadku desek o długości 1,1 m i o 500 mm w przypadku desek 2,2 m (rys. 11). Po ułożeniu podłogi usuwamy kliny
blokujące, a powstałą szczelinę przykrywamy przyściennymi listwami dekoracyjnymi. Bezpośrednio po zakończeniu montażu listew przypodłogowych, podłoga nadaje się do użytkowania.
Klejenie deski do podłoża: 1. Rozprowadzamy klej za pomocą pacy trapezowej, który musi równomiernie pokrywać min 60% powierzchni deski. 2. Podłoże powinno zostać zagruntowane i spełniać
następujące warunki wytrzymałościowe: - wytrzymałość na odrywanie minimum 1 MPa, - wytrzymałość na ściskanie minimum 25 MPa. Dopuszcza się do klejenia wyłącznie kleje poliuretanowe jedno-
składnikowe lub syntetyczne, zalecane przez producentów do klejenia podłóg lakierowanych i olejowanych fabrycznie oraz które można zastosować na ogrzewaniu podłogowym. NIE WOLNO STOSOWAĆ
KLEJÓW DYSPERSYJNYCH!
Montaż deski na ogrzewaniu podłogowym: Niezależnie od wybranego systemu grzewczego warunkiem przystąpienia do układania deski na ogrzewaniu jest sporządzony i podpisany przez wykwalikowa-
ną ekipę montażowa protokół z 21-dniowego wygrzewania posadzki grzewczej. Jeśli montaż podłogi nie odbywa się natychmiast to na kilkanaście dni przed montażem należy ponownie ustawić ogrzewanie
na 21 °C i w tej samej temperaturze układać deskę. Jako materiał podkładowy należy stosować tekturę falistą do 3mm lub piankę. Uwaga: Gwarancja na deskę nie obejmuje wad powstałych na skutek
przesuszenia / przegrzania podłogi poprzez stosowanie temperatur wyższych niż dopuszczone. Temperatura na powierzchni podłogi drewnianej nie może przekraczać 27°C. Należy upewnić się, że zostały
zachowane wszelkie branżowe wytyczne dotyczące ogrzewania podłogowego. Można je znaleźć pod adresem www.arenagolv.se.
Pielęgnacja i regeneracja: Deska fabrycznie wykończona jest: lakierem UV lub olejem UV lub olejem naturalnym. Do renowacji i regeneracji deski lakierowanej zalecamy stosowanie lakierów poliureta-
nowych, zgodnie z instrukcją producenta lakieru. Uwaga: Prace należy powierzyć profesjonalistom. Intensywna eksploatacja powłoki powinna nastąpić po ok. 7 dniach. Do nakładania lakieru należy użyć
narzędzi przeznaczonych do wyrobów poliuretanowych. Po ułożeniu podłogi, jak i w trakcie jej użytkowania zaleca się stosowanie środków czyszcząco – pielęgnujących przeznaczonych do danego rodzaju
podłogi. Zaleca się po zamontowaniu podłogi z desek olejowanych zabezpieczyć powierzchnię desek poprzez nałożenie dodatkowej warstwy oleju zbliżonego do kolorystyki deski. Prowadzenie okresowej
i regularnej pielęgnacji podłóg olejowanych, niweluje drobne oznaki codziennego użytkowania Największym wrogiem drewnianych podłóg jest woda i piasek. W przypadku ich naniesienia na podłogę
należy je delikatnie usunąć. Punktowe miejsca nacisku podklejamy podkładkami lcowymi.
PL
www.arenagolv.se [email protected]
Box 11043, 161 11 Bromma, Sweden
tel. +46 (0)8 80 2160
S3-skikts parkett NTrelags gulvpanel PL Trójwarstwowa deska podłogowa GB Three-layer ooring board
Brandklass / Brannmotstand / Fire reaction / Reakcja na ogień:
Standard: EN 13501-1:2007 D– s1
Minimal densitet (medelvärde) / Gjennomsnittlig min. densitet / Average minimal density / Przeciętna minimalna gęstość:
500 kg/m3
Minimal tjocklek / Min. tykkelse / Minimal thickness / Minimalna grubość:
10 mm
Formaldehydemisson / Formaldehydavdamping / Formaldehyde emission / Emisja formaldehydu:
Standard: EN – 717/1:2006 E – 1
Emission av pentaklorfenol / Pentaklorofenol avdamping / Pentachlorophenol emission / Emisja pentachlorofenol:
Standard: CEN/TR – 14823:2003 ≤5 ppm
Halkighet / Glatthet / Slip resistance / Śliskość:
Standard: CEN/TS – 15676:2007 USRV 100
USRV 62 (professional)
Värmekonduktivitet / Varmeledningsevne / Thermal conductivity / Przewodność cieplna:
Standard: EN-12524:2003 0,14W/m*K
Biologisk beständighet / Biologisk holdbarhet / Biological durability / Trwałość biologiczna:
Standard: EN 350-2:2000 NPD
ARENA-239999
DoP: AAR 239999
EN 14342:2005 + A1:2008
09
Table of contents
Other Arena Indoor Furnishing manuals
Popular Indoor Furnishing manuals by other brands

SIDLER
SIDLER SideLight operating instructions

Home Decorators Collection
Home Decorators Collection Windlowe 15101-VS49C-WT Use and care guide

IKEA
IKEA LIATORP 304.397.30 manual

Furniture of America
Furniture of America CM3888PT-5PK Assembly instructions

ricoo
ricoo ZAP1680 Series Assembly instructions

American Standard
American Standard Williamsburg Pedestal Lavatory 0555.400 Specification sheet